Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Takoro13(m): 6:38pm On Mar 29, 2019 |
boyestic: thanks for your help,i was quoted #40k Ask him to bring it down to 35k |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Takoro13(m): 6:36pm On Mar 29, 2019 |
boyestic: thanks for your help,i was quoted #40k I can't say what the man mean but can categorically tell you the quoted amount is not too high from the reasonable amount. You can not dig and pour concrete same day. Atleast digging will take two days though the remianing work not be charge for full day. Then you start pouring immidiately you finished digging the second day which may eventually not finished also i mean with six people. That at the end pf the day give you amount more than the charge above.If six people can dig four bed room perfectly for a day that mean we don't need machine in our site again. |
Properties › Re: Building A 3 Bedroom Bungalow In Delta State by Takoro13(m): 6:52pm On Mar 26, 2019 |
joshuachuks: I am considering using 13 pillars Then I will chain the building round, the side with the nine block will take 3 pillars with two times chaining one at 5th blocks, the other at 9th block to meet with the general chaining. No problem. God with you |
Properties › Re: Building A 3 Bedroom Bungalow In Delta State by Takoro13(m): 5:50am On Mar 26, 2019 |
joshuachuks: Today we were able to raise the four corners of the 3 bedroom flat to the required DPC. After we are done with the 3 bedroom we will focus on the room and parlor self contain. Good work bros, I want to beg you to take good considerations on the pillars as the foundation is too high. Either you use double wall or pillars at close points. God with you. I still de rest on my own |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Takoro13(m): 6:29pm On Mar 20, 2019 |
meohio7777: Good day house, I am about sand filling my site to get the level before the Concrete Stamping. The Land scape was measured at 333Sqm. I already got 5 Trips of Shap Sand of 30 ton delivered on site but my contact said about 10 Trip is needed. I think the 5 already delivered should be enough. Please advice thanks You get time for that? Ask them to start filling immediately section by section and yourself see where you need more and make sure it is well compacted. Nevertheless, discuss with your sit helpers |
Properties › Re: Moulding Block Vs Buying Block: Which Is Better? by Takoro13(m): 5:12am On Mar 20, 2019 |
Josnac: 45-50 blocks/bag of 6" Really??, how strong can that be?? Is never a crime to go for that number if your sharp sand is sharp enough but is advisable to go low as 40 for better safety. |
Properties › Re: Moulding Block Vs Buying Block: Which Is Better? by Takoro13(m): 8:12pm On Mar 19, 2019 |
Josnac: Lol Well, first off, I'm not a block moulder but a Structural Engineer and I happen to have worked with probably a lot of blocks from block industries and trust me, each and every one of them is strictly profit oriented as in every business venture...and as such, the quality isn't always as great as when you get moulders and pay them to do it at your site, good moulders oo.
You can get someone who would mould, for instance, 45 blocks of 5inches/ bag for like 700-800/bag and trust me, if the moulders know their onions, it will beat anything you can get from the block industries.. Apologies to block industry owners here, I'm not trying to ruin your business.
The number of blocks per bag will strictly depend on your desired quality.. I personally have seen a man build a bungalow with 6inch blocks moulded at 20-22/bag, yea it was a nightmare for bricklayers to cut but that was his choice. As for sand, very sharp sand is ideal.
Then turning and water will all depend on who you give the stuff to mould, the man who moulded mine na one old papa wey be baba for area, you know like, people commends his work a lot..just look around your environment and also ask around, I'm sure you can get someone to give you what you desire. Thanks sr. I understand your block is not hollow block we use here. Though depend on your chose but we prefer 35-40 per bag for 9" and 45-50 for 6". Please let your moulder turn the sand like three/four hands for good result and must be thoroughly and periodically wet. |
Properties › Re: Building A 3 Bedroom Bungalow In Delta State by Takoro13(m): 8:06pm On Mar 19, 2019 |
joshuachuks: Expenses keeps increasing unexpectedly, increase in work man money, but the grace of God has been helping me through. The DPC will be high because of the slope in the area, so I will carry out double chaining on the edge with the highest numbers of blocks, then thr others single chaining. Explain what you mean by double chain sr |
Properties › Re: Moulding Block Vs Buying Block: Which Is Better? by Takoro13(m): 6:18pm On Mar 18, 2019 |
Josnac: Personally, I'll recommend you mould. Get people who can give you a good mix, its way better and less expensive... Plus you will get stronger blocks at lesser costs. Are you a professional in block making? Please help us explain the processes involve in block making. How many block per bag of cement, how many head pans of sand, type of suitable sand, how many required turn time, water process and other factors are expected to be explained |
Properties › Re: Building A 3 Bedroom Bungalow In Delta State by Takoro13(m): 6:14pm On Mar 18, 2019 |
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Takoro13(m): 4:23pm On Mar 17, 2019 |
Good day house, I want to know the merit and demerit of this two septic system. The rectangular one and the well-like one.
Like how much is well dig per feet in osun state |
Properties › Re: Building A 3 Bedroom Bungalow In Delta State by Takoro13(m): 7:42am On Mar 16, 2019 |
|
Properties › Re: Building A 3 Bedroom Bungalow In Delta State by Takoro13(m): 8:23pm On Mar 14, 2019 |
joshuachuks: Molding expenses
Cement 50 bags = 117000 Sand 7 trips. = 87500 Water = 5000 Payment of molders =40000
Money for design and plan approval =100000 Survey was done some years ago so it wasn't that expensive as it is now. So I spent 50k How many blocks you made from 7trip and 50 cements |
Properties › Re: Building A 3 Bedroom Bungalow In Delta State by Takoro13(m): 8:02pm On Mar 14, 2019 |
joshuachuks: Rods 12mm 20 pieces. = 42000 Gravel 2 trips. = 48000 Sharp sand 2 trips = 25000 Flat Board 40 pieces. = 34000 Quarter rod 20 pieces = 8750 Bounding wire = 1000 Peg. = 1600 3inches nail half bag. = 4000 2 by 2 wood 20 pieces = 6000 Cement 20 bags. = 47000 This is for foundation I supposed. Close to my four bedroom foundation work. |
Properties › Re: Building A 3 Bedroom Bungalow In Delta State by Takoro13(m): 8:00pm On Mar 14, 2019 |
joshuachuks: Good morning everyone Let me give a total and breakdown of the money I have spent so far for buying of materials needed for the foundation and block molding. Show us the level of the work so people can talk about the expenses you post below. Good luck |
Properties › Re: Building A 3 Bedroom Bungalow In Delta State by Takoro13(m): 10:56pm On Mar 12, 2019 |
joshuachuks: Bro in building you can give a direct cost, because anything can come up on the way and there is loss sometimes. So I will advice you to work gradually not putting your self under pressure. You will finish your project by god's grace. Amin. Thanks |
Properties › Re: Building A Low Cost Four Bedrooms Bungalow In Ilesa by Takoro13(op): 2:42pm On Mar 12, 2019*. Modified: 8:38pm On Mar 19, 2019 |
joshuachuks: I see your work bro God help us finish it God strengthen you. Amen. Oh! You are here. Thanks. God with you also. Would like to rest small as another expenses is on the way. I will be crown the Chief Obanla on 26 and 27 April. After then, be His grace work continue |
Properties › Re: Building A 3 Bedroom Bungalow In Delta State by Takoro13(m): 2:39pm On Mar 12, 2019 |
joshuachuks: Yea, It's not but it's a way to save but if the money is available you can cast all it shouldn't cost you more than 1 trip of stone. Like how many bags of cement do you think will finish four bedroom floor? 48-50 right? That is around 120k. Am afraid and pray to God |
Properties › Re: Building A 3 Bedroom Bungalow In Delta State by Takoro13(m): 1:37pm On Mar 12, 2019 |
joshuachuks: You can do DPC to some point then leave the others For example; your dpc should be half around the high part of your foundation by that you have saved money That is not professional I think. The last experience I hard was laying concrete on the blocks all around the the foundation blocks |
Properties › Re: Building A 3 Bedroom Bungalow In Delta State by Takoro13(m): 1:31pm On Mar 12, 2019 |
joshuachuks: Yea, I will maintain that range though I am molding 6inches not 9inches so the mixture might give you two or three more blocks My 6" is going for 40 per bag. Hope is OK |
Properties › Re: Building A 3 Bedroom Bungalow In Delta State by Takoro13(m): 9:17pm On Mar 11, 2019 |
joshuachuks: I molded 35-38 but sometimes the mixture might give you up to 40, so it's not definite But I will also do a DPC casting when I get to my desired foundation height. Congrats to you too I wish you success in your building process. Maintain 35 per cement bag, please. Though, I introduced pillars at strategic places of the house.. I pray to do dpc/German floor but money money money Thanks |
Properties › Re: Building A 3 Bedroom Bungalow In Delta State by Takoro13(m): 5:04pm On Mar 11, 2019 |
joshuachuks: I used two different molders and one charged 800 per bag Then I met another guy that collected 700 per bag So the two molded together but after the first day, I paid the both 700 respectively. How many blocks per bag of cement? Make sure you wet the blocks very well to achieve more reliable outcome. I moulded 37-38 per bag but want to reduce it to not more than 35 with two times wetting. Congrat bro |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Takoro13(m): 6:12pm On Mar 10, 2019 |
Dubemcapital1: The steel structure has been jeopardized and has failed it's purpose. The building completely depend on the load being transmitted to the columns.
However, I suggest he should introduce a new pillar and basket on the concrete cast column base. (No further digging)
OR, bend another bar ( legs) for reinforcement and on each bars of the column and also use dpc beam to chain up the affected columns.
It's a mistake and can happen to anyone, it's better corrected now.
Nevertheless, One good thing about construction is that it's construction.
Thanks I love your response much. I think he shld introduce parallel iron bars with there legs bend out into all bars and make them rest on the concrete. Only my opinion not a professional opinion |
Properties › Re: Building A Low Cost Four Bedrooms Bungalow In Ilesa by Takoro13(op): 5:07am On Mar 08, 2019*. Modified: 7:08am On Dec 14, 2019 |
twinskenny: i actually need halve a plot You mean in ILESA. Call . They want to sell a plot beside me. I will like to have half of it and you take half if you are interested |
Properties › Re: Building A Low Cost Four Bedrooms Bungalow In Ilesa by Takoro13(op): 5:56pm On Mar 06, 2019 |
twinskenny: please sir how much did u get the land? Got it #350 last year july minus paper expenses. The land next to it is price at #400 now. If you would like it let me know |
Properties › Re: Building A Low Cost Four Bedrooms Bungalow In Ilesa by Takoro13(op): 6:18am On Mar 06, 2019 |
Foundation
700 blocks of 9" were moulded for the foundation work at the rate of 35 blocks per cement. One and half load of gravel, 30 bags of cement and half load of sharp sand.
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Takoro13(m): 1:53pm On Mar 05, 2019 |
Adedward: #200,000 per tonnes, #2200 per length, Thanks |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Takoro13(m): 6:02pm On Mar 04, 2019 |
How much is a 12mm rod now. |
Properties › Building A Low Cost Four Bedrooms Bungalow In Ilesa by Takoro13(op): 9:26pm On Mar 03, 2019*. Modified: 7:25pm On Mar 16, 2019 |
See the attached image for building components.
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Takoro13(m): 9:10pm On Feb 18, 2019 |
bixton: Budget 50 to 60 bags maximum at that 4" thickness. You are all welcome. I appreciate you all. Oga hajji won't like me go on without German floor but refused to talk about my request. Thanks sr |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Takoro13(m): 12:25pm On Feb 18, 2019 |
Chekitaut: Buy 20tons Granite, 20tons sharp sand, 80bags of Cement 80 bags for German floor alone sr. I think I have to leave it for now |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Takoro13(m): 7:53am On Feb 18, 2019 |
Chekitaut: Site location Ilesa osun state Thanks |