Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 6:40am On Mar 21, 2015 |
mufutau55: They both great sir....thank you sir..how is work sir? |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 9:15am On Mar 23, 2015 |
engrgordon: when there is need to involve the service of a sub contractors we will surely get in toucch with you sir..thanks |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by engrgordon(m): 9:29am On Mar 23, 2015 |
abdulwastecx: thanks for your concern my proffessional coleague,hope the work is moving smoothly well. |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 10:14am On Mar 23, 2015 |
engrgordon: yes sir |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 9:33pm On Mar 25, 2015 |
There have been some delay due to need to increaase the dpc level
|
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 9:35pm On Mar 25, 2015 |
Pics
|
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 9:37pm On Mar 25, 2015 |
Septic tank
|
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 9:39pm On Mar 25, 2015 |
More
|
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 9:41pm On Mar 25, 2015 |
After many disappointments by suppliers will started moulding blocks ourself 1 Like
|
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 9:50pm On Mar 25, 2015 |
Block moulding 1. One trip of sand 2. 30bags of cement 3. N800/bag to mould the block We actually get 30blocks/bag and we get 30bagsper each trip of sand Total blocks per trip of sand = 900blocks The block is stronger and cheaper by N50/block
|
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by micbjrex(m): 11:15pm On Mar 25, 2015 |
Thanks for this info. Is the trip of sand 5 ton or 10 ton? I want to ask you how many trips of 5 ton sharp sand can set (not mould) 5000 blocks? Thanks |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 5:46pm On Mar 26, 2015 |
micbjrex: A bag of cement will set 60blocks using a mix ratio of 1:6. You need 83bags of cement for the 5000blocks You need about 25tonnes of sharp sand to lay the block 1 Like |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by micbjrex(m): 6:28pm On Mar 26, 2015 |
Thanks my oga....hope your going going...you re doing a good job. please bro, pls help calculate the ton of sand, ton of gravel, 12mm iron, rings, cement to construct 15 pillars (height of about 15 coaches of 6 inch block), 21 windows (11 nos of 1800mm, 3 nos 0f 1500mm, 2 nos of 1200mm, 5 nos of 900mm. 19 doors [17 nos of 900mm, 2 nos of 1200mm] 2 arcs of 2400mm. thanks |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by Onuokwu: 6:58pm On Mar 26, 2015 |
Can we see the plan and 3D, if any, for this school block so that we know what to look forward to. |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 8:29pm On Mar 26, 2015 |
micbjrex: for the columns the height of 6'' block is = 225m 15 courses = 15 x 225 = 3375mm assuming a thickness of mortar of 2omm = 20 x 15 = 300mm total height of column = 3375 + 300 = 3.675m column reinforcement length = main height ( 3.675) + bottom anchorage ( 0.15) + top anchorage (0.15) = 3.975m y12 length is 12.3m, No of bars = 12.3/4 = 3bars Bar required per column = 4 total Number = 4 x 15 = 60 No of bars required = 60/3 = 20bars for the longitudinal reinforcement for the rings using Y8 and spacing of 300mm c/c length of links for a rectangular column of 225 x 150 ( due to the 6'' side) and allowing for cover of 20mm L= 900mm Number of links in a column with 3000mm spacing = 13 links No of L in one length of bar = 12.3/0.9 = 13links Total number of Y8 required for the link = 15Y8 for the concrete volume of concrete = 0.225 x 0.15 x 4 =0.135m3/column total volume of all the 15 columns = 0.135 x 15 =2.025m3 using a mix ratio of 1:2:4 part of cement = 2.025 x 1/7 x 1506/50 =9bags of cement ( use 12 bags allowance for shrinkage and wastage) part of sand = 2.025 x 2/7 x 1.6 =1tonnes of sharp sand part of gravel = 2.025 x4/7 x 2.4 = 3tonnes of gravel summary for the column reinforcement s/n Descriptions Quantity unit rate amount 1. Y12 20 Nr N1,200 N24,000 2. Y8 15 Nr N800 N12,000 3. Dangote cement 12 bag N2,000 N24,000 4. sharp sand 1 tonne N 3,00 N3,000 5. Gravel 3 tonne N 8,000 N24,000 ( port Harcourt price) 6. workmanship N36,000 Total = N123k ( minus the cost of formwork) 5 Likes 1 Share |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 8:31pm On Mar 26, 2015 |
Onuokwu: I will upload the plan view and the elevations tomorrow.... as for the 3D, I am not sure If I can lay my hand on any but before we finish the job I will do a 3d of the school |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 8:38pm On Mar 26, 2015 |
micbjrex: for the doors and windows, it will be better to get the price from a local distributors for the 2 arcs: items 1. 3 bars of Y12 N 3,600 2. 2 bags of cement N 4,000 3. 1 bar of Y8 N 800 4. sand and gravel from the column 5. workmanship 6.workmanship = N6,000 sum =N14,400[font=Lucida Sans Unicode][/font] |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 8:39pm On Mar 26, 2015 |
micbjrex: for the doors and windows, it will be better to get the price from a local distributors for the 2 arcs: items 1. 3 bars of Y12 N 3,600 2. 2 bags of cement N 4,000 3. 1 bar of Y8 N 800 4. sand and gravel from the column 5. workmanship 6.workmanship = N6,000 sum =[b]N14,400[/ 1 Like 1 Share |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 8:40pm On Mar 26, 2015 |
micbjrex: for the doors and windows, it will be better to get the price from a local distributors for the 2 arcs: items 1. 3 bars of Y12 N 3,600 2. 2 bags of cement N 4,000 3. 1 bar of Y8 N 800 4. sand and gravel from the column 5. workmanship 6.workmanship = N6,000 sum =N14,400 |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by micbjrex(m): 10:07pm On Mar 26, 2015 |
Thank you but what about materials for doors and window From your post, I understand that I will need 20 rods for the longitudinal pillars, 15 links.....i dont get that part, please help break that down in layman's term, 12 bags of cement, 1 ton sand, 3 ton gravel then for the 2 arcs, i need 3 rods, 2 bags of cement, 1 bar of Y8 rod, then use from the above sand and gravel. please, help do the math for pillar base mat and doors and windows too..thanks |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 6:02pm On Mar 27, 2015 |
micbjrex: I mean u need 15 no of Y8 |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by jfkenny(m): 4:46am On Mar 28, 2015 |
Good morning Op.i Am late to class hope u can reply my question .Good practical class, may god bless you the more ..amen.. |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 9:09am On Mar 28, 2015 |
jfkenny: amin sir...provided I can provide. reasonable answers to them.... you are welcome |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by jfkenny(m): 10:10am On Mar 28, 2015 |
abdulwastecx:Thanks and do justice to these: 1.What is the correct cement :sand mix for laying blocks. 2.I always read 1:2:4 as standard for concrete mix but I have not seen the builders implement such. what I normarly is 1 bag of cement:8head pans of sand :10headpans of stone. Or sand and stone will be made equal 8:8. Thanks and b blessed. |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 12:11pm On Mar 28, 2015 |
jfkenny: In order to achieve a minimum concrete strength of 25N/mm2, a mix ratio of 1:2:4 ( 1bag of cement to four head pan of sand and 8 head of gravel. The sand most be clay free, The gravel must be retained on 20mm sieve. Water for the mixture must be drinkable and water to cement ratio can either be 0.45 or 0.55 Note the following: 1. The more the water content of a concrete the weaker the concrete 2. Most of concrete strength comes from the coarse aggregates (gravel) 3. Cement serve as a binder 4. Sand help to filled the void space between gravel and increase the volume of concrete The correct mix for laying blocks is 1:6 One bag of cement to 12 head pan of sharp sand . 3 Likes 1 Share |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by jfkenny(m): 7:48pm On Mar 28, 2015 |
abdulwastecx:Thanks for the lecture.. |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 7:57pm On Mar 28, 2015 |
jfkenny: Sorry.. It should be to 12 head pan of sharp sand not gravel 1 Like |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by Nobody: 7:58pm On Mar 28, 2015 |
abdulwastecx: 12head pan of sand not gravel, please take note |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by alakara(m): 9:42pm On Mar 29, 2015 |
pls,wat abt d plan u said u willpost d other time. |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by jfkenny(m): 1:54am On Apr 01, 2015 |
segzy14:Noted |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by jfkenny(m): 2:30am On Apr 01, 2015 |
Sir in 1:2:4, will the sand and cement be able to bind the stone if the size of the stone is bigger than gravel.. Sir which is preferred: constructing an overhead tank for baths separately on mounting the tank on top of the building in a bungalow.. |
Re: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(m): 9:41am On Apr 01, 2015 |
jfkenny: it is cheaper to mount the over head tank on top of a platform (slab) Constructed on top of the building floor rate is a function of height ( Known as head in hydraulic). all you need to have sufficient head is to locate the tank at higher level than the bath. It is important to plan properly for this and to design the columns and beam supporting the platform. 1 Like |
/ Affordable And Best Architectural / Construction Company In Nigeria In 2019 / Ambode Issues Deadline For Payment Of Land Use Charge
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 50 |