Addis Ababa Beats Lagos To Light Rail As Construction Delays Mount - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / Addis Ababa Beats Lagos To Light Rail As Construction Delays Mount (3486 Views)

Aisha Buhari Poses With First Ladies Of Gambia, Ghana, Ethiopia, In Addis Ababa / Addis Ababa Bets Lagos To Light Rail As Construction Delays Mount / Okonjo-iweala With Nigerian Delegates At Addis Ababa (photos) (2) (3) (4)

(1) (2) (Reply) (Go Down)

Addis Ababa Beats Lagos To Light Rail As Construction Delays Mount by SB2020: 9:25pm On Sep 23, 2015
Interesting facts about Addis Ababa and Lagos light rail projects.

Addis Ababa / Lagos
Cost == $475Million / $1.2Billion
Length == 34km / 27km
Time to Complete == 4years / 7years (projected)
Year Awarded == 2011 / 2008 (Construction began 2010)
Contractor == China Railway Eng. Corp (CREC) /Chinese Civil Eng. Constr. Coy (CCECC)
Population == 5Million / 20Million
GDP == $50Billion (Ethiopia) / $100Billion (Est.) (Nigeria - $535B)


Ethiopia has managed to deliver Sub-Saharan Africa’s first modern light rail project which opened in the capital Addis Ababa on Sunday, and in the process, beat Lagos whose own rail project remains four years behind schedule.

Ethiopia’s rail project was delivered on time, despite its being longer than the Lagos – Badagry rail line currently under construction.

Addis Ababa’s two line 34-kilometre system was built by the China Railway Engineering Corporation (CREC) and cost $475m, 85 percent of which has been covered by China’s Exim bank. The Lagos Light Rail Project or Blue on Badagry Expressway, was to have 13 stations from Okokomaiko to Marina via Iddo for a total of 27 kilometres.

The contract was awarded to the Chinese Civil Engineering Construction Company (CCECC) at the cost of $1.2 billion in 2008, and was to be delivered in 2011. Survey work took one year between August 2009 and August 2010 while construction began July 2010.

The work is being implemented using the public and private partnership (PPP) model, whereby the state builds the infrastructure and the private sector provides the rolling stock and management. However, the project has not worked out according to the plan.
The 2011 deadline was missed, even though the State government got a loan to fund the project.

Source
http://businessdayonline.com/2015/09/addis-ababa-beats-lagos-to-light-rail-as-construction-delays-mount/

6 Likes 3 Shares

Re: Addis Ababa Beats Lagos To Light Rail As Construction Delays Mount by 989900: 9:29pm On Sep 23, 2015
Which way Nigeria?

Which way Lagos?

How long will this take?

5 Likes

Re: Addis Ababa Beats Lagos To Light Rail As Construction Delays Mount by SB2020: 9:31pm On Sep 23, 2015
It not just the time taken but the humongous difference is cost....SMH
Re: Addis Ababa Beats Lagos To Light Rail As Construction Delays Mount by Paschal001: 9:47pm On Sep 23, 2015
Hmmm
Re: Addis Ababa Beats Lagos To Light Rail As Construction Delays Mount by Emekamex(m): 10:30pm On Sep 23, 2015
The jarz wey dey do Nigeria strong well well.
Re: Addis Ababa Beats Lagos To Light Rail As Construction Delays Mount by Emekamex(m): 10:32pm On Sep 23, 2015
Kudos to Ethiopia, they are slowly becoming the true giant of Africa.

7 Likes 1 Share

Re: Addis Ababa Beats Lagos To Light Rail As Construction Delays Mount by oshyno(m): 10:32pm On Sep 23, 2015
Things like this makes me wana wep for this country. Why cant we have human face . Look at the price difference and the idstance to cover sef.
Re: Addis Ababa Beats Lagos To Light Rail As Construction Delays Mount by ayokellany: 10:43pm On Sep 23, 2015
I argued this fact severally to blind supporters of the APC but no one would listen. I can only live consoling myself that at least APC is embarking on such a project even when it's being used to siphone public fund. The alternative which is the PDP will not even bother embarking on such and would rather loot their lives to stupor.

Morale - as much as APC is not the messiah the PDP is no alternative

2 Likes

Re: Addis Ababa Beats Lagos To Light Rail As Construction Delays Mount by mars123(m): 10:51pm On Sep 23, 2015
This says a lot about what we are talking about here. when Nigeria is finally laid to rest because of greedy citizens, we will all gather to give it a disappointing burial to crown it all.

1 Like

Re: Addis Ababa Beats Lagos To Light Rail As Construction Delays Mount by Nobody: 10:51pm On Sep 23, 2015
APC, change undecided

1 Like

Re: Addis Ababa Beats Lagos To Light Rail As Construction Delays Mount by BlackBaron: 10:52pm On Sep 23, 2015
Just like the billions expended on power and still worse.
Nigeria is a like a country where politicians excavate increasingly expanding money sinkholes '. The Lagos train cabs are also about 20 years old yet manages to cost more than another with shorter distance and brand new trains.

1999 - 2015, despite monumental funds we have just meagre basic amenities yet some are here willing to fight tooth and nail for those who sit on their future.

3 Likes 1 Share

Re: Addis Ababa Beats Lagos To Light Rail As Construction Delays Mount by chinchum(m): 10:58pm On Sep 23, 2015
SB2020:
It not just the time taken but the humongous difference is cost....SMH
As to the cost, it is somewhat puzzling, but i suspect the variance could be coming from the fact that much of lagos light rail will run overhead, but i could be wrong if addisababa lightrail too is overhead.
Re: Addis Ababa Beats Lagos To Light Rail As Construction Delays Mount by CSTR2: 11:55pm On Sep 23, 2015
Ethiopia is the fastest growing economy in africa right now and also attracting the most FDIs.
Something that would never have happened under jonathan.
I think ethiopia currently has africa's most intelligent leaders.
Re: Addis Ababa Beats Lagos To Light Rail As Construction Delays Mount by cjrane: 11:59pm On Sep 23, 2015
Please where is Lagos?

So we truly expected jaga jaga Nigeria to beat Ethiopia in infrastructure delivery?

Abeg, also add Amaechi Mono rail to compete with Ethiopia's.

Our oga in Aso Rock would have been shouting "Kworruption" now if fashola and Amaechi that squandered state funds pretending to be building monorail had been PDP men.


https://www.youtube.com/watch?v=UO4qhDthUAU


https://www.youtube.com/watch?v=xKzzfkialK4

2 Likes

Re: Addis Ababa Beats Lagos To Light Rail As Construction Delays Mount by hinwazaka: 12:24am On Sep 24, 2015
ayokellany:
I argued this fact severally to blind supporters of the APC but no one would listen. I can only live consoling myself that at least APC is embarking on such a project even when it's being used to siphone public fund. The alternative which is the PDP will not even bother embarking on such and would rather loot their lives to stupor.

Morale - as much as APC is not the messiah the PDP is no alternative
Get your facts right, COWARD, the funding was partly PDP, as they were the central government at the time . The FG contributed about 50%. And also, if you must know, there is a light rail also being developed in ABUJA. This was done by the PDP. What about RIVERS, before that dog called Amaechi joined the APC, he was already developing a monorail.
By the way quit the sympathetic, fake neutral man approach. You are APC all the way. Or is it that you can't shake off your father's cowardly genes in you. Be a MAN for once in your life, COWARD.

9 Likes

Re: Addis Ababa Beats Lagos To Light Rail As Construction Delays Mount by IGBOSON1: 1:44am On Sep 24, 2015
hinwazaka:

Get your facts right, COWARD, the funding was partly PDP, as they were the central government at the time . The FG contributed about 50%. And also, if you must know, there is a light rail also being developed in ABUJA. This was done by the PDP. What about RIVERS, before that dog called Amaechi joined the APC, he was already developing a monorail.
By the way quit the sympathetic, fake neutral man approach. You are APC all the way. Or is it that you can't shake off your father's cowardly genes in you. Be a MAN for once in your life, COWARD.

^^^Damn!

Hinwazaka bros, don't you think that was a bit of an overkill? undecided
Re: Addis Ababa Beats Lagos To Light Rail As Construction Delays Mount by 989900: 6:26am On Sep 24, 2015
chinchum:

As to the cost, it is somewhat puzzling, but i suspect the variance could be coming from the fact that much of lagos light rail will run overhead, but i could be wrong if addisababa lightrail too is overhead.

You are right, though the cost will always be inflated as per the 'sad norm' with previous administrations (these are some of the things we expect the new admin to reduce), but we can argue 'compensations' too and 'yada yada yada' . . .

However, the sad part in my opinion is, the time frame!
Why does everything have to cost more, and take longer to deliver in Nigeria?!

1 Like

Re: Addis Ababa Beats Lagos To Light Rail As Construction Delays Mount by forgiveness: 7:25am On Sep 24, 2015
BlackBaron:
Just like the billions expended on power and still worse.
Nigeria is a like a country where politicians excavate increasingly expanding money sinkholes '. The Lagos train cabs are also about 20 years old yet manages to cost more than another with shorter distance and brand new trains.

1999 - 2015, despite monumental funds we have just meagre basic amenities yet some are here willing to fight tooth and nail for those who sit on their future.

Lagos state has abandoned the H-5 and H-6 series subway trains for the chinese built electric trains.
Re: Addis Ababa Beats Lagos To Light Rail As Construction Delays Mount by chinchum(m): 8:09am On Sep 24, 2015
989900:


You are right, though the cost will always be inflated as per the 'sad norm' with previous administrations (these are some of the things we expect the new admin to reduce), but we can argue 'compensations' too and 'yada yada yada' . . .

However, the sad part in my opinion is, the time frame!
Why does everything have to cost more, and take longer to deliver in Nigeria?!

Well, it could also take more time to build those overheads, and i recalled the FG in early 2014 refused to assent to the state getting a tranche of the loan, these could also be argued for the delay. There would be no excuse if at the end of this current administration in 2019, the project is not delivered.
Re: Addis Ababa Beats Lagos To Light Rail As Construction Delays Mount by chinchum(m): 8:17am On Sep 24, 2015
hinwazaka:

Get your facts right, COWARD, the funding was partly PDP, as they were the central government at the time . The FG contributed about 50%. And also, if you must know, there is a light rail also being developed in ABUJA. This was done by the PDP. What about RIVERS, before that dog called Amaechi joined the APC, he was already developing a monorail.
By the way quit the sympathetic, fake neutral man approach. You are APC all the way. Or is it that you can't shake off your father's cowardly genes in you. Be a MAN for once in your life, COWARD.

Before huffing and puffing!, can you state any reasonable document where it was stated FG contributed about 50% to Lagos blue light rail project. Facts are sacred, and it seems you love facts.

I am certain you pulled that out from your asss.

2 Likes

Re: Addis Ababa Beats Lagos To Light Rail As Construction Delays Mount by Otherique: 8:37am On Sep 24, 2015
If it were to be the 2nd Niger Bridge,
pseudo-intellects would have been all over the place comparing it with the longest Bridge in China.


Right now, they are hypocritically avoiding this thread.

1 Like

Re: Addis Ababa Beats Lagos To Light Rail As Construction Delays Mount by hinwazaka: 9:35am On Sep 24, 2015
chinchum:


Before huffing and puffing!, can you state any reasonable document where it was stated FG contributed about 50% to Lagos blue light rail project. Facts are sacred, and it seems you love facts.

I am certain you pulled that out from your asss.
FOOL, GO AND ASK GOOGLE. YOU WILL SEE ALL THE INFORMATION YOU NEED TO CORRECT YOUR BRAIN is THERE.
Re: Addis Ababa Beats Lagos To Light Rail As Construction Delays Mount by chinchum(m): 9:53am On Sep 24, 2015
hinwazaka:

FOOL, GO AND ASK GOOGLE. YOU WILL SEE ALL THE INFORMATION YOU NEED TO CORRECT YOUR BRAIN is THERE.

Oh, so you can no longer present the fact here for all to see ! shocked shocked shocked

Dont dig your hole further searching for more treasure of stupidity. Your bold stupidity is daring enough.
Re: Addis Ababa Beats Lagos To Light Rail As Construction Delays Mount by kennyman2000(m): 10:04am On Sep 24, 2015
Hmmm.. All these our politicians are just scamming us sha..
Re: Addis Ababa Beats Lagos To Light Rail As Construction Delays Mount by neocortex: 10:23am On Sep 24, 2015
Well , just ask Tinubu/Fashola for the full details.
Re: Addis Ababa Beats Lagos To Light Rail As Construction Delays Mount by aresa: 11:06am On Sep 24, 2015
Re: Addis Ababa Beats Lagos To Light Rail As Construction Delays Mount by ayokellany: 4:59am On Sep 25, 2015
hinwazaka:

Get your facts right, COWARD, the funding was partly PDP, as they were the central government at the time . The FG contributed about 50%. And also, if you must know, there is a light rail also being developed in ABUJA. This was done by the PDP. What about RIVERS, before that dog called Amaechi joined the APC, he was already developing a monorail.
By the way quit the sympathetic, fake neutral man approach. You are APC all the way. Or is it that you can't shake off your father's cowardly genes in you. Be a MAN for once in your life, COWARD.

Of what use is arguing bogus lies. If FG/PDP contributed 50% where is the project now ? Do both APC/PDP not get to share the failure of the uncompleted rail which was started before that of Ethiopia at nearly 10 times the cost yet Ethiopia as completed theirs while yours is still in limbo. What century will the Abuja light rail be completed ? Kudos to Rivers. Amechi jumping the ship only buttress my claim as far as I am concerned. I will take the APC over the PDP in my constituency any time any day though they are under performing. Like I said

Ajumobi over Akala will always be a YES
Amosun over Daniel is a YES too
Fayemi over Fayose resounding YES
Aregbe over Omisore YES

When PDP is ready is ready to offer the SW an Akpabi or a Chime then and only then would you understand not everyone supporting APC is as gullible as you wailers. The closest they ever came was Agbaje n he had to rig his way to secure the ticket that is how bad the PDP is Nearly offering a disaster like Obanikoro it's ticket. Like I argued with wailers like you cowardice is not a crime under the constitution of Nigeria. When the push comes to shove we all know those that flee to Côte d’Ivoire. Quit the sorrow you plung your soul into daily over party politics n live a more fruitful purposeful life. It is well with you.
Re: Addis Ababa Beats Lagos To Light Rail As Construction Delays Mount by Volksfuhrer(m): 6:09am On Sep 25, 2015
Both GEJ's government and Lagos State Government should be blamed for this farce.
Re: Addis Ababa Beats Lagos To Light Rail As Construction Delays Mount by Volksfuhrer(m): 6:20am On Sep 25, 2015
Otherique:
If it were to be the 2nd Niger Bridge,
pseudo-intellects would have been all over the place comparing it with the longest Bridge in China.


Right now, they are hypocritically avoiding this thread.

Stop whining, the cost of that bridge was inflated! It's also the case with this one. And guess what? PDP was involved in both cases! grin
Re: Addis Ababa Beats Lagos To Light Rail As Construction Delays Mount by plaindealer: 7:55am On Aug 08, 2022
SB2020:
Interesting facts about Addis Ababa and Lagos light rail projects.

Addis Ababa / Lagos
Cost == $475Million / $1.2Billion
Length == 34km / 27km
Time to Complete == 4years / 7years (projected)
Year Awarded == 2011 / 2008 (Construction began 2010)
Contractor == China Railway Eng. Corp (CREC) /Chinese Civil Eng. Constr. Coy (CCECC)
Population == 5Million / 20Million
GDP == $50Billion (Ethiopia) / $100Billion (Est.) (Nigeria - $535B)


Ethiopia has managed to deliver Sub-Saharan Africa’s first modern light rail project which opened in the capital Addis Ababa on Sunday, and in the process, beat Lagos whose own rail project remains four years behind schedule.

Ethiopia’s rail project was delivered on time, despite its being longer than the Lagos – Badagry rail line currently under construction.

Addis Ababa’s two line 34-kilometre system was built by the China Railway Engineering Corporation (CREC) and cost $475m, 85 percent of which has been covered by China’s Exim bank. The Lagos Light Rail Project or Blue on Badagry Expressway, was to have 13 stations from Okokomaiko to Marina via Iddo for a total of 27 kilometres.

The contract was awarded to the Chinese Civil Engineering Construction Company (CCECC) at the cost of $1.2 billion in 2008, and was to be delivered in 2011. Survey work took one year between August 2009 and August 2010 while construction began July 2010.

The work is being implemented using the public and private partnership (PPP) model, whereby the state builds the infrastructure and the private sector provides the rolling stock and management. However, the project has not worked out according to the plan.
The 2011 deadline was missed, even though the State government got a loan to fund the project.

Source
http://businessdayonline.com/2015/09/addis-ababa-beats-lagos-to-light-rail-as-construction-delays-mount/

1. There's nothing to compare regarding Lagos Metro Rail and the ones in other countries.

2. The requirements and specifications are not the same.

3. Lagos states Metro Rail is part of a 10 lane freeway with BRT access

4. Lagos constructed a Metro Bridge over the Lagos Lagoon into the Marina which takes time and comes with extra cost, Ethiopia did not build any bridge over any lagoon.

5. Lagos state built Real Metro stations and overhead bridges which takes time and comes with extra cost, Ethiopia built sheds.

6. Lagos is a state withing Nigeria, not a country like Ethiopia, Lagos is doing what many sovereign nations can not do or even afford to do.


Your comparisons are off base, illogical and grossly unintelligent, no offense, just being factual.

Re: Addis Ababa Beats Lagos To Light Rail As Construction Delays Mount by Christistruth00: 9:48am On Aug 20, 2022
SB2020:
Interesting facts about Addis Ababa and Lagos light rail projects.

Addis Ababa / Lagos
Cost == $475Million / $1.2Billion
Length == 34km / 27km
Time to Complete == 4years / 7years (projected)
Year Awarded == 2011 / 2008 (Construction began 2010)
Contractor == China Railway Eng. Corp (CREC) /Chinese Civil Eng. Constr. Coy (CCECC)
Population == 5Million / 20Million
GDP == $50Billion (Ethiopia) / $100Billion (Est.) (Nigeria - $535B)


Ethiopia has managed to deliver Sub-Saharan Africa’s first modern light rail project which opened in the capital Addis Ababa on Sunday, and in the process, beat Lagos whose own rail project remains four years behind schedule.

Ethiopia’s rail project was delivered on time, despite its being longer than the Lagos – Badagry rail line currently under construction.

Addis Ababa’s two line 34-kilometre system was built by the China Railway Engineering Corporation (CREC) and cost $475m, 85 percent of which has been covered by China’s Exim bank. The Lagos Light Rail Project or Blue on Badagry Expressway, was to have 13 stations from Okokomaiko to Marina via Iddo for a total of 27 kilometres.

The contract was awarded to the Chinese Civil Engineering Construction Company (CCECC) at the cost of $1.2 billion in 2008, and was to be delivered in 2011. Survey work took one year between August 2009 and August 2010 while construction began July 2010.

The work is being implemented using the public and private partnership (PPP) model, whereby the state builds the infrastructure and the private sector provides the rolling stock and management. However, the project has not worked out according to the plan.
The 2011 deadline was missed, even though the State government got a loan to fund the project.

Source
http://businessdayonline.com/2015/09/addis-ababa-beats-lagos-to-light-rail-as-construction-delays-mount/




It costs more to build because Lagos is a Waterlogged Marsh Area , Addis Ababa ba is not

There are many bridges that need to be built in addition to filling the waterlogged areas with Water Resistant Rocks and Concrete that will form a Solid foundation and cost more than the laying of the Train Tracks itself


Look at this Railway Bridge along the line on the Lagoon for example,
it is expensive to build

Re: Addis Ababa Beats Lagos To Light Rail As Construction Delays Mount by ono(m): 6:27pm On Dec 16, 2022
SB2020:
Interesting facts about Addis Ababa and Lagos light rail projects.

Addis Ababa / Lagos
Cost == $475Million / $1.2Billion
Length == 34km / 27km
Time to Complete == 4years / 7years (projected)
Year Awarded == 2011 / 2008 (Construction began 2010)
Contractor == China Railway Eng. Corp (CREC) /Chinese Civil Eng. Constr. Coy (CCECC)
Population == 5Million / 20Million
GDP == $50Billion (Ethiopia) / $100Billion (Est.) (Nigeria - $535B)


Ethiopia has managed to deliver Sub-Saharan Africa’s first modern light rail project which opened in the capital Addis Ababa on Sunday, and in the process, beat Lagos whose own rail project remains four years behind schedule.

Ethiopia’s rail project was delivered on time, despite its being longer than the Lagos – Badagry rail line currently under construction.

Addis Ababa’s two line 34-kilometre system was built by the China Railway Engineering Corporation (CREC) and cost $475m, 85 percent of which has been covered by China’s Exim bank. The Lagos Light Rail Project or Blue on Badagry Expressway, was to have 13 stations from Okokomaiko to Marina via Iddo for a total of 27 kilometres.

The contract was awarded to the Chinese Civil Engineering Construction Company (CCECC) at the cost of $1.2 billion in 2008, and was to be delivered in 2011. Survey work took one year between August 2009 and August 2010 while construction began July 2010.

The work is being implemented using the public and private partnership (PPP) model, whereby the state builds the infrastructure and the private sector provides the rolling stock and management. However, the project has not worked out according to the plan.
The 2011 deadline was missed, even though the State government got a loan to fund the project.

Source
http://businessdayonline.com/2015/09/addis-ababa-beats-lagos-to-light-rail-as-construction-delays-mount/

I smell corruption and backdoor dealings!

(1) (2) (Reply)

FLASH: Evacuation Of Nigeria Oil Workers Continue-sahara Reporters. / Breaking News: Mushroom Party Uses Nnamdi Kanu Pics For Campaign In Anambra / Do You Know Port Harcourt Was Named After A Sex Predator?

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 64
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.