Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,153,081 members, 7,818,236 topics. Date: Sunday, 05 May 2024 at 10:53 AM |
Nairaland Forum / Nairaland / General / Politics / Power Sector Records Four System Collapses In Four Weeks (729 Views)
Section Of Senator Wamakko's Building Collapses In Sokoto. Photos / Power Failure: Fashola Gets 30-day Ultimatum To Revive Power Sector Or Resign / Governor Udom Escapes Death As Church Building Collapses In Akwa Ibom (2) (3) (4)
Power Sector Records Four System Collapses In Four Weeks by simtosul: 2:50am On May 04, 2016 |
• Electricity generation drops to 3,167MW The nation’s power sector is apparently characterised with numerous challenges that have continued to halt power evacuation and supply to the yearning consumers. Indeed, the transmission grid has recorded no fewer than four system collapses in four weeks. The Minister of power, Works and Housing, Babatunde Fashola, has however blamed the low generation on shortage of gas supply to the thermal plants. A document obtained from the Transmission Company of Nigeria (TCN) showed that the national grid experienced total outage on March 31, April 9, April 23, and April 25 simultaneously. The lowest in the record was on April 23 when it generated a paltry 25.2Mega Watts (MW) of electricity, having fell from 2,749MW generated the previous day. As at yesterday, electricity generation dropped to 3,167 MW from 3,351MW on Monday, a far cry from the 12,800MW peak demand estimated by the Federal Ministry of Power. Meanwhile, Eko Electricity Distribution Company has announced that beginning from Tuesday, the 3rd of May, there will be power rationing in Lekki, Ikoyi, Victoria Island and some parts of Ajah, all in Lagos Island. The General Manager, Corporate Communications of the company, Godwin Idemudia, said in a statement that the power rationing is to enable the Transmission Company of Nigeria (TCN) to upgrade both Line 1 and Line 2 of Ajah-Alagbon transmission line from 132kv to 330kv. According to him, during the upgrade operation which will last between three and four weeks, the Lekki Transmission injection sub-station from which most of the areas to be affected by the power rationing are fed would be completely shut down. Idemudia however said that to ensure that the areas are not completely out of supply for the duration of the upgrade operation, alternative power supply arrangement would be made through back-feeding operation to the areas from Alagbon Transmission injection sub-station via Ijora. While appealing to customers to show understanding and bear with the situation during the period of the facility upgrade exercise, he further stated that all efforts would be made to ensure equitable distribution of available power to all customers. He assured customers that by the time the upgrade work is completed, it will result in tremendous improvement in power supply to all customers in the area. Already, scores of electricity consumers are presently groaning under incessant outages, as they continued to lament high electricity tariff that does not commensurate with supply. A community leader in Sango, Ogun State, Mrs Olushola Agbedeyi said the power supply in the area is worrisome and tantamount to waste of resources as they continued to pay for facility not enjoyed. In Mushin, a consumer and entrepreneur, Isa Alausa said the poor power supply has grounded business activities in the area, with more businesses relying on independent power generators.With the lingering fuel scarcity, he said the situation is becoming worse as black markets indiscriminately shoot up the cost of production. He therefore appealed to the Federal Government to urgently find lasting solution to the power supply crisis in the country.Fashola had explained that the country suffered a terrible power outage in the month of March and April due to low gas supply to the power plants.The minister explained that out of the 78 gas turbines in the country, only 50 were working due to shortage of gas to power the facility. According to him, “The power being generated comes from about 78 out of 140 turbines and they are largely fired by gas. Now the power has gone down because we have gas outage in one of the gas pipelines. “We have an installed capacity of 12,000 Mega Watts (MW). We have about 140 turbines installed. But the available capacity today is about 8,000MW both installed and available and this simply means that some turbines are down, some projects haven’t been fully completed,” he said. General Manager (Public Affairs), TCN, Seun Olagunju, said the partial collapse of the system on April 23 was specifically caused by a sudden loss of 200MW of generation due to technical reasons. She therefore linked others to shortage of gas supply.Olagunju added that the problem was quickly resolved by the company’s engineers, and immediately restored full power transmission to the grid. “It would be recalled that low generation has been experienced in the country for the last few weeks sequel to gas inadequacy to the thermal power plants, following the vandalism of gas pipelines,” she added. According to the statement, “The grid has since been restored and available generation is being evacuated from all running power plants and transmitted by TCN to the networks of the Discos for onward delivery to the customers”. She further reiterated its commitment to continually work at improving power transmission service in the sector. Although, there were insinuations that the frequent system collapse may not be unconnected with the recent rift between the workers and the management of the Ministry of Power. Olagunju said the lockdown of the TCN headquarters in Abuja, does not affect technical operations as TCN staff in its regional offices nationwide, who are responsible for the actual wheeling of bulk electricity, are at their duty posts, ensuring that electricity generated by power generating stations is seamlessly transmitted to distribution load centres nationwide. www.guardian.ng/business-services/business/power-sector-records-four-system-collapses-in-four-weeks/ |
Re: Power Sector Records Four System Collapses In Four Weeks by greatgod2012(f): 3:17am On May 04, 2016 |
But Fashola, when he was a governor said generation of power is not a rocket science! Why are they now finding it difficult now that they're in power! 7 Likes |
Re: Power Sector Records Four System Collapses In Four Weeks by onatisi(m): 3:35am On May 04, 2016 |
When fashola was running his mouth like a loose water running pipe claiming that any serious government can fix Nigeria energy problem in 6 months,probably his brains didn't tell him then that fixing Nigeria energy problem isnt rocket science https://www.nairaland.com/3000405/serious-government-fix-power-problem 2 Likes |
Re: Power Sector Records Four System Collapses In Four Weeks by Ratello: 3:55am On May 04, 2016 |
This shows that in the history of power generation in Nigeria, this is the first time we are experiencing ludicrous power generation under the leadership of the rabble-rouser himself who enjoys giving lectures instead of getting to work, he is no other than Mr Power Generation is No Rocket Science but now he can now tell us soon that it is Space Ship Science funny looking scammer. He will soon demand for more funds from his maga, Buhari that he wants to deliver 20,000 MegaWatts and not 10,000 MegaWatts by 2019! Just watch the clown speak soon in his forth coming inaugural lectures (respect to tomakint). Ole jatijati 2 Likes |
Re: Power Sector Records Four System Collapses In Four Weeks by M4gunners: 4:08am On May 04, 2016 |
Fashola have no idea on the position they put him.One thing is for sure, God has a way of paying people back for their words. 3 Likes |
Re: Power Sector Records Four System Collapses In Four Weeks by onatisi(m): 4:13am On May 04, 2016 |
Actually,I blame buhari . And this is what happens when u have a Fulani cattle reader as a ruling president. How can any sensible president appoint a lawyer to head and control an energy portfolio? What is the relationship between law and energy technology 4 Likes |
Re: Power Sector Records Four System Collapses In Four Weeks by freeze001(f): 4:16am On May 04, 2016 |
Any responsible government can fix power within 6 months; governance is not rocket science! Well, I am not surprised, even the lead dumbo has acknowledged their ineptitude enough to liken them to dogs that go back to lick their vomit. 2 Likes |
Re: Power Sector Records Four System Collapses In Four Weeks by freeze001(f): 4:23am On May 04, 2016 |
onatisi: Hey! Please that's a 'Super Minister' with superhuman powers you are referring to! He can do all things because 'in Baba they trust'! When we say mind the leaders u choose, dem say na CHANGE! That's the change o! Afterall '16 years of rot by PDP cannot be cleared in one year'. This is the kind of nonsense we have to contend with now. In fact Buhari should just travel as Paul Biya leaves. Maybe he'll be cool enough to get real with the APC populated NASS and friggin sign the damned budget! 2 Likes |
Re: Power Sector Records Four System Collapses In Four Weeks by LadyExcellency: 6:05am On May 04, 2016 |
This is a learning process for our system Engineers but for how long? Some excuses are permissible, not all. 1 Like 1 Share |
Re: Power Sector Records Four System Collapses In Four Weeks by TPAND(f): 6:05am On May 04, 2016 |
Haaaaa... Don't worry guys. Fashola the rocket scientist got this. It seems our power problems have suddenly become Alien Technology 1 Like |
Re: Power Sector Records Four System Collapses In Four Weeks by Amitex(m): 6:54am On May 04, 2016 |
This government self! Fashola is working!!! Power sector has gone nuclear and space science with zero M/Watts Buhari is Budgeting to and fro!!! Lai Mohammed is masquerading!! Ngige is blaming!! Osinbajo is campaigning in office!!! Amaechi is masturbating with Coastal rall when he could not finish 3km monorail in Rivers. Meanwhile no fuel, no light, no food, no forex, inflation has hit double digits, Fulani herdsmen are killing and maiming. kidnappers are having field day, Boko Haram are arm bushing soldiers, states are owing salaries, etc The masses are suffering and smiling!!! Welcome to Nigeria 3 Likes |
Re: Power Sector Records Four System Collapses In Four Weeks by dgr8truth(m): 7:24am On May 04, 2016 |
Re: Power Sector Records Four System Collapses In Four Weeks by Pangea: 7:34am On May 04, 2016 |
This is either a sabotage or incompetence! Let Fashola throw engineers and troubleshooters at the problem. Import seasoned power engineers and let them do both technology and knowledge transfer to our local engineers. Industries should be built around the power effort. It will create even more jobs. By now we are supposed to be manufacturing our own transformers, solar cells , inverters , deep cycle batteries and turbines. This is not rocket science! |
Re: Power Sector Records Four System Collapses In Four Weeks by olafum1(m): 7:36am On May 04, 2016 |
Fashola himself too should collapse jo |
Re: Power Sector Records Four System Collapses In Four Weeks by iflywithbuhari(f): 7:46am On May 04, 2016 |
And one funny pastor told us that he will make the sun shine for 24hrs in 18months time. That man ehn, even if things are bad, he will still say that God will bless you. Pastor, oya, turn water into wine. |
(1) (Reply)
Kachikwu: FG To Privatise Refineries In 12 Months / I Collected N700m For Ex-katsina Gov Ibrahim Shema - Sada / Federal Government Witness Proves That Saraki Declared Assets On Cross-examinati
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 29 |