Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Hum2020: 7:23pm On Dec 13, 2019 |
Timtol: |
Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Hum2020: 7:31pm On Dec 13, 2019 |
Yea timtol noted it very painful to hear this that cost of material down southeast and ph are at high price why because our people don't have tag price for goods so anybody can decided to put any price to Good and services well I congratulate you 1 Like |
Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(m): 8:07pm On Dec 13, 2019 |
Hum2020:Sigh! Thanks |
Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(m): 12:00am On Dec 14, 2019 |
Official Website; http://www.dioritestructures.com.ng/ Blog Site: http://www.dioriteplanstudio.com.ng/ |
Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(m): 12:23am On Dec 14, 2019 |
Ensure the 8Y20mm seat well not only this but all other columns.
|
Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(m): 8:46am On Dec 14, 2019 |
Substructure work starts. |
Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(m): 6:20pm On Dec 14, 2019 |
Timtol:Day 5
|
Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(m): 6:22pm On Dec 14, 2019 |
Timtol:More on block work
|
Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(m): 6:23pm On Dec 14, 2019 |
Timtol:More
|
Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by psychologist(m): 6:32pm On Dec 14, 2019 |
Timtol: Any particular reason why a whopping 8y20 was used for this column? Godspeed 1 Like |
Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(m): 7:53pm On Dec 14, 2019 |
psychologist:Checking the 3D design you discover we have 900mm cantilever at that edge meeting 1500mm drop beam cantilever both front and side, there isn't a particular column at that 90° edge carrying the roof load,note as well we have lintel with cantilever at the corner window, all loads been equally shared bring in 8y20mm taken that duty with a wider mat for easy spread as the load is been transferred into the soil. Cantilever 98% all round this building. Don't know if this answer your question sir. Thanks for following. Happy weekend.
|
Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(m): 6:32am On Dec 15, 2019 |
Visitation to site increases as people become more amazed with the accuracy of the little done so far. Here is our kitchen
|
Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(m): 9:24am On Dec 15, 2019 |
Ring sample for the plinth.
|
Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(m): 8:28pm On Dec 15, 2019 |
Timtol: |
Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(m): 12:41am On Dec 16, 2019 |
You can dash-in into our interior works as well. https://www.nairaland.com/5298499/contemporary-3d-interior-works Website; http://www.dioritestructures.com.ng/ Blog; http://www.dioriteplanstudio.com.ng/
|
Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(m): 10:14am On Dec 16, 2019 |
Getting ready as the substructure works end
|
Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(m): 8:49pm On Dec 16, 2019 |
Day 2 on substructure works. Done!
|
Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(m): 8:51pm On Dec 16, 2019 |
Putting joy on the client's heart thru expression All 30 Columns align 100%. 75bags of cement used for pad bases, blinding and substructure works.
|
Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(m): 8:27am On Dec 17, 2019 |
Number of blocks used for substructure works. 1150 blocks. |
Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(m): 12:25pm On Dec 17, 2019 |
Casting of columns and progress on the "foundation beam" simultaneously |
Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(m): 12:29pm On Dec 17, 2019 |
More update later today.
|
Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(m): 2:07pm On Dec 17, 2019 |
|
Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by gateleo(m): 2:50pm On Dec 17, 2019 |
Good job...Timtol 1 Like |
Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(m): 3:43pm On Dec 17, 2019 |
gateleo:Thanks. Appreciate you following. |
Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(m): 6:43pm On Dec 17, 2019 |
More from this side the formwork and iron works progresses simultaneously
|
Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(m): 6:45pm On Dec 17, 2019 |
Plumbing works
|
Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(m): 7:27pm On Dec 17, 2019 |
More from this side.
|
Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(m): 4:56am On Dec 18, 2019 |
Timtol:We move |
Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(m): 10:58am On Dec 18, 2019 |
First leveling and backfilling in progress as well as the continuation for the iron works as casting progresses.
|
Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(m): 6:02pm On Dec 18, 2019 |
More update shortly |
Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(m): 7:12pm On Dec 18, 2019 |
Wetting of the seemly termed first layer...compacting the soil 2 times.
|
Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(m): 5:49am On Dec 19, 2019 |
First soil compaction today, filling starts. |
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (20) (Reply)
My Landlord Sneaks Into My Apartment / How We Build Duplexes In Nigeria / Architecture: Construction Of Duplex In Lekki & Akwa-Ibom State.
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 37 |