Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,152,902 members, 7,817,672 topics. Date: Saturday, 04 May 2024 at 04:54 PM

The Real Cost Of Building A 6 Bedroom Duplex (reloaded) - Properties (93) - Nairaland

Nairaland Forum / Nairaland / General / Properties / The Real Cost Of Building A 6 Bedroom Duplex (reloaded) (293522 Views)

How Can I Build A 6 Bedroom Duplex With 6.5m Naira / Construction Of A 6 Bedroom Duplex At Owerri / The Real Cost Of Building A Six Bedroom Duplex (2) (3) (4)

(1) (2) (3) ... (90) (91) (92) (93) (Reply) (Go Down)

Re: The Real Cost Of Building A 6 Bedroom Duplex (reloaded) by spyder880(m): 8:17am On Feb 20, 2018
kachesky:
Please i just want to know how much it will cost me to build a 6 bedroom duplex with all rooms ensuite and also will it be possible on a plot of land

Which state Sir? We can give you a guess of what it might coat but you will get a close figure if you can draw a building plan so we can count the actual size and give you a better estimate.
Re: The Real Cost Of Building A 6 Bedroom Duplex (reloaded) by Donchy(m): 3:11pm On Apr 07, 2018
spyder880:


Which state Sir? We can give you a guess of what it might coat but you will get a close figure if you can draw a building plan so we can count the actual size and give you a better estimate.

I have a similar question. The state is Enugu and the land size is 600sqm..

and can you recommend architect that can draw good building plan
Re: The Real Cost Of Building A 6 Bedroom Duplex (reloaded) by spyder880(m): 11:38pm On Apr 07, 2018
Donchy:


I have a similar question. The state is Enugu and the land size is 600sqm..

and can you recommend architect that can draw good building plan


Please send me a whatsapp chat to 0803 335 0750, I will send you the number of the architect. Thanks.
Re: The Real Cost Of Building A 6 Bedroom Duplex (reloaded) by Bimpsyyyyy: 8:08am On Jun 17, 2018
For your construction

Re: The Real Cost Of Building A 6 Bedroom Duplex (reloaded) by Timtol(m): 1:39am On Jul 11, 2018
Bimpsyyyyy:
For your construction
3Bedroom Duplex
EXTERNAL DIM: 12.525m by 11.1m

Estimated cost is 16m pending on your land(plot) being dry,waterlogged or rocky land


FEATURES



Ground Floor


Open-Decked Garage,
Entrance point,
Anteroom,
Visitor Toilet,
Large main lounge,
Dogleg stairway(in the living room),
Sit-out,
Dining,
Kitchen,
Pantry,
Veranda.


First Floor


Gallery,
Bedroom 1 ensuit,
Bedroom 2 ensuit,
Master room ensuit,
Large terrance.


For more info: 081-0045-2977(whatsapp) or 08127167275 or obed.toluwase@gmail.com

Re: The Real Cost Of Building A 6 Bedroom Duplex (reloaded) by Norrah(f): 2:34pm On Jun 21, 2019
Luxury finished 4 Bedroom Semi Detached Duplex with BQ in Eli Court Lekki. Pay and Pack In

Are you looking for Brand new duplex with bigger sitting room and bigger rooms in a serene location where the upper class live? Don't worry we have got your covered with Eli Court.

*Luxury finished
* Brand New
*All rooms ensuite
*1 Sitting room and 1 Family Lounge
*Dinning area
*4 Bedroom 
*BQ
*6 Toilets/Bath
*Parking Space for 2 or 3 cars per duplex
*POP ceiling 
*Fitted kitchen
*Gas cooker
*Oven
*Smoke Extractor
*Security
*Electricity
*Water treatment borehole
*Security Guards 
*Fully interlocked compound 
*Tarred and interlocked road from the expressway.

*Location: Chevron Alternative Drive, Lekki, Lagos State.* 

~Normal Price: N67m~ 
*Special Promo Price:* N58m Outright

*4 Months flexible payments plan:* Minimum Initial deposit N20m and spread balance within 3 months. Total N59m.

No other fees. 

*Offer is subject to duplex units availability.*

*For Inspection and Purchase, contact; 09019115282

Re: The Real Cost Of Building A 6 Bedroom Duplex (reloaded) by Chekitaut: 5:26am On Jul 13, 2019
Get 30tons Granite
Island, Ikoyi, V.I, Lekki-Ajah for just N168,000

Hurry while stock last
08055545355, 08032887233
Re: The Real Cost Of Building A 6 Bedroom Duplex (reloaded) by otunzzy(m): 5:36am On Aug 02, 2019
bekee72:
can 1 million five hundred thausand naira secure foundation and german floor of 2 wing 3 bedroom flat in a lavel dry land.the plan is 4 flat upstair.gono be gratefull to hear from you.[color=#006600][/color]



i needed a building ideal,but no body responded.anyway,about my 2 wing of 2 flat down and 2 flat up.i took a risk to start the project without being their because i live abroad,no chance for me to be present because of my work,my brother is the one taking car
the foundation and german floor has been completed last week,the builder extimated 1.8 million for it but it took me about 2.3 million.not easy.
can ancan any oné tell mě any ideál for decking 4 flat which is oné 3 bedroom and oné 2 bedroom.all ensuit.thanks.yone update me on what and how much it going to take me to the level before decking?gono apreciate it,thanks.
am a prefessional i handle differrent type of building the one at my profile i also biult it and i deliverd in time check my profile and see the biulding


i am building a storey building of one 3 bedroom flat and 2 bedroom flat down and up,all ensuit.i have now finish the german floor.can any one educate me on how many iron rod of kinds needed and cement, granits, sand,wooods and blocks and other to 2 block after lintel.it has 32 pillers.
notice,altogether four flat.thanks.

Re: The Real Cost Of Building A 6 Bedroom Duplex (reloaded) by otunzzy(m): 5:45am On Aug 02, 2019
bekee72:
can 1 million five hundred thausand naira secure foundation and german floor of 2 wing 3 bedroom flat in a lavel dry land.the plan is 4 flat upstair.gono be gratefull to hear from you.[color=#006600][/color]
otunzzy post=80854897:
no it can't be enough for the foundation and german floor

i needed a building ideal,but no body responded.anyway,about my 2 wing of 2 flat down and 2 flat up.i took a risk to start the project without being their because i live abroad,no chance for me to be present because of my work,my brother is the one taking care.
the foundation and german floor has been completed last week,the builder extimated 1.8 million for it but it took me about 2.3 million.not easy.
can ancan any oné tell mě any ideál for decking 4 flat which is oné 3 bedroom and oné 2 bedroom.all ensuit.thanks.yone update me on what and how much it going to take me to the level before decking?gono apreciate it,thanks.


i am building a storey building of one 3 bedroom flat and 2 bedroom flat down and up,all ensuit.i have now finish the german floor.can any one educate me on how many iron rod of kinds needed and cement, granits, sand,wooods and blocks and other to 2 block after lintel.it has 32 pillers.
notice,altogether four flat.thanks.

if you really need that and you want perfect quotation can we chat on whatsapp
Re: The Real Cost Of Building A 6 Bedroom Duplex (reloaded) by otunzzy(m): 6:07am On Aug 02, 2019
ananne:
Secondly there is an old one room and parlour on the land. Someone said i should renovate and add more rooms to build. Do you think it will be cheaper? Or should i demolish and start afresh with regards to me earlier comments? Thanks.
otunzzy:
[/left] ;Di am a professional i biul for people outside the country and i delivered on time perfect job please can we chat on whatsapp so i can scetch out some plan for u to choose and so we can plan on how it will go understand
did you have plan for your biulding[left]
grin
Milady2012:
Hi Guys. Very interesting tread this is. I am ready to start a new house project in Abuja ( a four/five bedroom bungalow) all en suite or at least three bathrooms.Can anyone give me an idea how much this could cost? I know it all depends on a lot of factors but just a rough estimate of a standard house with good/tasteful finishing will do. My kids will riot if I made them stay in anything less smiley [font=Lucida Sans Unicode][/font]

I have no definite building plan in place although I am exploring several ideas so im very much open to suggestions. I intend to have this house ready for occupation by december this year as we intend to vacation in naija this christmas and will be staying in this house. Furnishing for this house (beleive it or nt has been purchased and awaiting shipping)!!! I would not mind hearing from an architect and a QS. i need to move very fast with this.

Many thanks kiss
i am a professional i biul for people outside the country and i delivered on time perfect job please can we chat on whatsapp so i can scetch out some plan for u to choose and so we can plan on how it will go understand
Re: The Real Cost Of Building A 6 Bedroom Duplex (reloaded) by otunzzy(m): 6:09am On Aug 02, 2019
otunzzy:
[left][/left] ;Di am a professional i biul for people outside the country and i delivered on time perfect job please can we chat on whatsapp so i can scetch out some plan for u to choose and so we can plan on how it will go understand
check this out

Re: The Real Cost Of Building A 6 Bedroom Duplex (reloaded) by m2cad: 8:28am On Jul 22, 2020
Babe, I got involved in this.

*MASONARY BLOCKS FOR SALE*

Come in for good quality Sandcrete (sand:cement) blocks for your partition walls, structural load-bearing walls, sub-structure bearing walls.

Also available are paving (interlocking) stones and road kerbs

These will be produced to suit different needs of our booming clientelle base.

Try us today. You sure be satisfied

Email - multicadtechnologies@yahoo.co.uk
08033158603

otunzzy:
did you have plan for your biulding[left][/left] ;Di am a professional i biul for people outside the country and i delivered on time perfect job please can we chat on whatsapp so i can scetch out some plan for u to choose and so we can plan on how it will go understand

1 Like

Re: The Real Cost Of Building A 6 Bedroom Duplex (reloaded) by Cowbell521: 6:14pm On Feb 09
wolesamson:
@Spyder880,

Pls can you give me a breakdown estimate on how much will cost me to mould 6000 of 9 inches block for a 3 plots of land (60 by 120) for fencing? the cost of sand suitable for this project and how many tonns plus how many cement can be enough for the project.

Also, i will like to know how much of cement plus sand will be enough for building the fence after the block making. Av got a client who offered me the below;

BLOCK ESTIMATE
S/N MATERIALS PRICEPER ONE (#) QUANTITY AMOUNT (#)
1 20 TRNS OF SAND 75,000 5 375,000
2 CEMENT 1,900 + TRANSPORT 125 237,500
3 BLK MOULDER’S WKMSHIP 600 125 75,000
5 WATER FETCHER/DRUM 3BAG/DRUM 600 25,200
6 MISCELLANOUS 5,000
7 TOTAL TOTAL TOTAL #717,700


ROUGH ESTIMATE FOR THE FENCE CONSTRUCTION

S/N MATERIALS PRICE PER ONE QUANTITY AMOUNT
1 SAND 75,000 2 150,000
2 CEMENT 1,900 + TRAN 80 BAGS 152,000
3 GRAVEL 70,000 1 OF 20 TRNS 70,000
4 BRICKLAYER’S WORKMANSHIP FOR THE FENCE 320,000
5 TOTAL TOTAL TOTAL #692,000

COST OF THE BLOCK = #717,700
COST OF FENCE ERECTION = #692,000
MISCELLANOUS = #20,000
TOTAL = 1,429,700
Approximately= 1,500,000. (1.5 MILLION NAIRA)
PERSONAL CHARGES FOR THE WORK= #100,000.
TOTAL = #1.6 MILLION NAIRA.


pls help me to check if this is a good price.

thanks,
How soon can you deliver?
Re: The Real Cost Of Building A 6 Bedroom Duplex (reloaded) by Cowbell521: 6:23pm On Feb 09
DCGUY:
@all the Gurus; I hailooo!!!!! My ppl, here are some quotes that i received from a builder. Pls let me know what u think of it- I beg una.

1. Granite-3 trips @N150 each=N450k
2. Filling Sand-20 trips @N25k each=N500k
3.Sharp Sand-30 trips@ N15k each=N450k
4.Cement-400 bags @ N2000 each=N800k
5.Wood 12x12-400pc @N750 each=N300k
6.wood 200@ N250 each=N50k
7.Iron 16mm-3tons @N120k each=N360k
8.Iron 12mm-1 ton @=N120k
9. Iron 10mm 1 1/2 @ N126 each=N189k
Material total=N3,219.000
10. Labour=N1.5m

Grand total=N4,719,000

I beg make una help me put mouth for this quote. Its for Raft foundation and German floor of a six bedrm duplex.
Wow. I need some
Re: The Real Cost Of Building A 6 Bedroom Duplex (reloaded) by Cowbell521: 6:26pm On Feb 09
spyder880:
Cost updates

Since the last time I showed updates of my spending in this building, I have done these;

Bought 45 bags of cement @N1570 (average)  N70,650
4 Trips of sand (some still visible in post nr 547  N24,000
paid block maker for 33 bags made @ N500  = N16,500
bought 500 blocks @ N100 = N50,000
paid bricklayers  N29,000
paid serving mason N9,600
bought iron rods (visible in post 547)  N1380 x 80 = N110,400
Transports/loading/offloading   N14,000
water  N3500
paid my engineer  N30,000
paid iron benders N23,000 (to bend and hang all the iron for upper pillars and lintels)
paid boys to carry 1200 blocks upstairs N5 X 1200 = N 6,000

(If I remember more, I will update again)

This total N386,650.00

The last total was N2,037,450.00

Add these two and we have a new total of N2,424,100.00
Take me to where you dey buy am. I need

(1) (2) (3) ... (90) (91) (92) (93) (Reply)

Buy Original Stamped Concrete Materials. / Fences And Gates In Pictures And Prices / Cost Of Building A House In Nigeria

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 45
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.