Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,155,197 members, 7,825,755 topics. Date: Sunday, 12 May 2024 at 10:19 PM

The Finishing Of My House (Oluwa Champion) - Properties (10) - Nairaland

Nairaland Forum / Nairaland / General / Properties / The Finishing Of My House (Oluwa Champion) (143399 Views)

Making & Finishing Of Interior Painting/design / The Finishing Of A 6 Bedrooms Duplex At Enelka In Portharcourt / Detail Finishing Of Built Home In Abuja With Pictures Including Our Showroom (2) (3) (4)

(1) (2) (3) ... (7) (8) (9) (10) (11) (12) (13) ... (21) (Reply) (Go Down)

Re: The Finishing Of My House (Oluwa Champion) by caseymoney(m): 4:16pm On Dec 13, 2011
Picture Update please!!!!!
Re: The Finishing Of My House (Oluwa Champion) by omoloba123(m): 4:25pm On Dec 13, 2011
@Am alone, Check this Travertine tiles out, i just love it but i dont know if its expensive in naija or not.

Re: The Finishing Of My House (Oluwa Champion) by Fhemmmy: 4:27pm On Dec 13, 2011
Nice
Re: The Finishing Of My House (Oluwa Champion) by omoloba123(m): 4:31pm On Dec 13, 2011
The above tiles is 60cm x 40 cm, 40sqm cost about £800 here in Uk, but its cheaper on joblot.
Re: The Finishing Of My House (Oluwa Champion) by AmAlone: 4:55pm On Dec 13, 2011
Bros, it will be better to buy it there and ship it home
because I don't think you can get much of those around here

Peace
Re: The Finishing Of My House (Oluwa Champion) by omoloba123(m): 6:15pm On Dec 13, 2011
@ Am Alone, Thank bro, Appreciate it.
Re: The Finishing Of My House (Oluwa Champion) by TBrownAuto(m): 9:25pm On Dec 13, 2011
Am happy with some info from this thread, but we should make proper inquiry about product before buying them.

Am Alone, the truth is that you will not and never get a 1st grade spain tile from the market not possible u can only get them from company here in Nigeria
and again about the china door, most sold in the market are Nigeria market quality for the Nigeria masses that why I never patronise them cause it a must low quality product. Wooden door are better imorted or local and are good u can either use mahogany or mazonia not too expensive but has quality.

Am going crazy about my projet now the finishing is consuming more than I expected and my problem is that am doing it to my taste but it for let
I will in my next reply upload some pics and start will expense brakedown and will make available my source for material and product used.

The roof will be install from thursday but plastering start on thursday plumbering work begin today
Re: The Finishing Of My House (Oluwa Champion) by Fhemmmy: 9:41pm On Dec 13, 2011
^^^ Some pix would be appreciated
Re: The Finishing Of My House (Oluwa Champion) by spyder880(m): 10:34pm On Dec 13, 2011
^^^^ Seconded!
Re: The Finishing Of My House (Oluwa Champion) by atasteve: 8:49am On Dec 14, 2011
TBrownAuto:

Am happy with some info from this thread, but we should make proper inquiry about product before buying them.

Am Alone, the truth is that you will not and never get a 1st grade spain tile from the market not possible u can only get them from company here in Nigeria
and again about the china door, most sold in the market are Nigeria market quality for the Nigeria masses that why I never patronise them cause it a must low quality product. Wooden door are better imorted or local and are good u can either use mahogany or mazonia not too expensive but has quality.

Am going crazy about my projet now the finishing is consuming more than I expected and my problem is that am doing it to my taste but it for let
I will in my next reply upload some pics and start will expense brakedown and will make available my source for material and product used.

The roof will be install from thursday but plastering start on thursday plumbering work begin today

Waiting and watching,
Re: The Finishing Of My House (Oluwa Champion) by atasteve: 8:53am On Dec 14, 2011
Oga Am Alone, why are you torturing us like this grin

When I slept, I dreamt of your beautiful house but behold when I got to "the finishing of my house (oluwa champion)" thread grin I saw no new update or pix sad

More updates oooooooooooooooo smiley
Re: The Finishing Of My House (Oluwa Champion) by TBrownAuto(m): 9:21am On Dec 14, 2011
Hello am using my phone xan find where to upload pics
Re: The Finishing Of My House (Oluwa Champion) by atasteve: 9:32am On Dec 14, 2011
TBrownAuto:

Hello am using my phone xan find where to upload pics

The add image icon is under "interlics icon" beside "Bold icon"

Although it might be difficult locating when you are using phone, I hope it helps cos I am waiting for your beautiful pix.
Re: The Finishing Of My House (Oluwa Champion) by NL1960: 10:10am On Dec 14, 2011
TBrownAuto:

Am happy with some info from this thread, but we should make proper inquiry about product before buying them.

Am Alone, the truth is that you will not and never get a 1st grade spain tile from the market not possible u can only get them from company here in Nigeria
and again about the china door, most sold in the market are Nigeria market quality for the Nigeria masses that why I never patronise them cause it a must low quality product. Wooden door are better imorted or local and are good u can either use mahogany or mazonia not too expensive but has quality.

Am going crazy about my projet now the finishing is consuming more than I expected and my problem is that am doing it to my taste but it for let
I will in my next reply upload some pics and start will expense brakedown and will make available my source for material and product used.

The roof will be install from thursday but plastering start on thursday plumbering work begin today

How many bedroom is your project and what is the plastering costing you or how many bags of cement are you using?. Iam about to start the plastering of my house first before doing the plumbing in order to take advantage of the present static price of cement and with the removal of fuel subsidy, price of cement might increase next year.
Re: The Finishing Of My House (Oluwa Champion) by caseymoney(m): 9:52pm On Dec 14, 2011
, Lawyer, we want this thread on page one. Please, make this thread sticky. Happy belated birthday, Lawyer.
Re: The Finishing Of My House (Oluwa Champion) by TBrownAuto(m): 11:24pm On Dec 14, 2011
Finally I will be able to tell the room my expense with some pics uploaded for update

Building size 80x50, room size 12x10 and 11x10 kitchen 9x7 kitchen veranda 5x7 toilet 6x5 palour 45square meter parlour veranda 3square metter


Foundation
Iron 16mm tons 10mm 2 tons: 720,000
Wood: 400,000
sand: 15tons 3 trip: 95,000
Granite: 30tons 3trip: 360,000
Cement: 300bags @2600 each: 780000
carpenter: 60,000
excavating: 40,000
Iron bender: 70,000
Omo nile: 50,000
filling sand 9trips @28,000 252,000



German floor

Iron 8mm for mat: 1ton : 110,000
16mm for beam: 65,000
Cement: 200 bags@1800 360,000
sand 2trip 15tons: 70,000
Granite 40tons: 160,000
caster: 50,000
carpenter: 10,000
bricklayer: 8000

Setting of block 1st floor

Total block for 1st floor is 7000@155 9ich block 1085000
cement 200bags @1800 360,000 for setting of block
Bricklayer: 240,000
carpenter 70,000 for 38pillar and lintel round
caster; 80,000
cement 100bags@ 1800 180,000
iron 16mm remains from foundation plus half tons
10mm remians from foundation rigs

Decking
wood: 400,000
bamboo: 40,000
carpenter 90,000
iron 7tons: 720,000
cement 400bags@1800 : 720000
iron bender: 90,000
omonile 100,000
caster 110,000
granite 30tons 2 and half 300,000
sand 15tons 5trip: 175,000
extra iron bought 16mm 1ton 12 for mat 1ton: 260,000

Please note that this state are those I remember for nails I remember none but total cost for Decking is 4.2m and very important my cement qoute @1800
was bought direct from dangote i bought one and half truck that is 900 bags but the 1st set of cement @2600 from market then never get idea of bulk
purchase from dangote. my engineer charged me 30,000 for foundation 50,000 to roffing and 10,000 for roffing

setting of block second floor

Total block for 2nd floor is 6600@155 9ich block 1023000
6inch block 500@120 remain from fence 60,000
cement 200bags @1800 360,000 for setting of block
Bricklayer: 240,000
carpenter 65,000 for 28pillar and lintel round
caster; 75,000
cement 92bags@ 1800 165,000

roofing:

Wood 650,000
alumimuin 0.45 stepping 765 square metter
0.35 normal for facing board and celing 100 square meter
Total for aluminium is 945,000
accesories 20,000
transport 12,000
labour: 70,000

The above expense stated are does remembered but total money spent on building including miscellnus expense, coucil, and transport is 17.2m

this my building cost i will state that of finishing in my next update


Which ever expense not cleard you can ask i will provide that for you
Re: The Finishing Of My House (Oluwa Champion) by spyder880(m): 1:18am On Dec 15, 2011
^^^ very correct.
Re: The Finishing Of My House (Oluwa Champion) by caseymoney(m): 2:22am On Dec 15, 2011
In fact, stick all educative thread on page one while the ads (junks) can float around page 2 - ~. I know your a silent follower of this thread. We wanna see all educative and brainstorming thread on page one. I think Seun should start assessing fees on those Ads. Some agents are posting more than one ads a day.
Re: The Finishing Of My House (Oluwa Champion) by TBrownAuto(m): 8:46am On Dec 15, 2011
Too bad internet was disconnected and my laptop has no bluetooh to connect my bb lol my finishing cost

Obama wc and pedetal stand and basin. 8 unit @29,000 each

Plumber 80,000
Plaster ecluding where to be tile sitting room floor, sitting room venranda toilet and kitchen floor, wall between both cabinet kitchen venranda 800,000

Aluminium window 6x4 8unit 5x4 24 unit 1mx1m 8unit tiolet window 8 two 6x2 for step 2 unit total 520,000 tower

Door 3feet door 32unit mahogany @6000 each 4feet door 8unit with 10 inch frame @18000 and kitchen venranda door 8unit 3feet with 10 each frame @14000 each total 420,000

Kithen sink 8unit @4500 topazs tap 8unit @ 2500 mmart

Sitting room total square metter 350 @1650 per square metter glaze tile china maker idirris kitchen and toilet floor @950 252 square meter toilet wall and kitchen wall 100 square meter @1000

Tiler 250 per square metter

Abestors 201 pieces @950 each

Plumber material total 190,800
Buglary 1inch pipe total 160,000

That all paid for so far and where I may stop till january for electrical works
Re: The Finishing Of My House (Oluwa Champion) by TBrownAuto(m): 9:37am On Dec 15, 2011
Jusr remembered roofing carpenter 160,000 omonile 60,000 the more I remember will update for pics will do that short
Re: The Finishing Of My House (Oluwa Champion) by spyder880(m): 10:51am On Dec 15, 2011
@ Tbrownauto, please reattach your cost update, the one you posted yesterday night is not there any longer?
Re: The Finishing Of My House (Oluwa Champion) by TBrownAuto(m): 11:42am On Dec 15, 2011
Finally I will be able to tell the room my expense with some pics uploaded for update

Building size 80x50, room size 12x10 and 11x10 kitchen 9x7 kitchen veranda 5x7 toilet 6x5 palour 45square meter parlour veranda 3square metter


Foundation
Iron  16mm tons 10mm 2 tons: 720,000
Wood: 400,000
sand: 15tons 3 trip: 95,000
Granite: 30tons 3trip: 360,000
Cement: 300bags @2600 each: 780000
carpenter: 60,000
excavating: 40,000
Iron bender: 70,000
Omo nile: 50,000
filling sand 9trips @28,000  252,000



German floor

Iron 8mm for mat: 1ton : 110,000
16mm for beam:  65,000
Cement: 200 bags@1800 360,000
sand 2trip 15tons: 70,000
Granite 40tons: 160,000
caster: 50,000
carpenter: 10,000
bricklayer: 8000

Setting of block 1st floor

Total block for 1st floor is 7000@155 9ich block 1085000
cement 200bags @1800 360,000 for setting of block
Bricklayer: 240,000
carpenter 70,000 for 38pillar and lintel round
caster; 80,000
cement 100bags@ 1800 180,000
iron 16mm remains from foundation plus half tons
10mm remians from foundation rigs

Decking
wood: 400,000
bamboo: 40,000
carpenter 90,000
iron 7tons: 720,000
cement 400bags@1800  : 720000
iron bender: 90,000
omonile 100,000
caster 110,000
granite 30tons 2 and half 300,000
sand 15tons 5trip: 175,000
extra iron bought 16mm 1ton 12 for mat 1ton: 260,000

Please note that this state are those I remember for nails I remember none but total cost for Decking is 4.2m and very important my cement qoute @1800
was bought direct from dangote i bought one and half truck that is 900 bags but the 1st set of cement @2600 from market then never get idea of bulk
purchase from dangote. my engineer charged me 30,000 for foundation 50,000 to roffing and 10,000 for roffing

setting of block second floor

Total block for 2nd floor is 6600@155 9ich block 1023000
6inch block 500@120 remain from fence 60,000
cement 200bags @1800 360,000 for setting of block
Bricklayer: 240,000
carpenter 65,000 for 28pillar and lintel round
caster; 75,000
cement 92bags@ 1800 165,000

roofing:

Wood 650,000
alumimuin 0.45 stepping 765 square metter
                 0.35 normal for facing board and celing 100 square meter
Total for aluminium is 945,000
accesories 20,000
transport 12,000
labour: 70,000
Carpenter; 160.000
Omonile; 60,000

The above expense stated are does remembered but total money spent on building including miscellnus expense, coucil,  and transport is 17.2m

this my building cost i will state that of finishing in my next update


Which ever expense not cleard you can ask i will provide that for you

1 Like

Re: The Finishing Of My House (Oluwa Champion) by atasteve: 2:30pm On Dec 15, 2011
@TBrownAuto, thanks for the cost breakdown but any pix?
Re: The Finishing Of My House (Oluwa Champion) by TBrownAuto(m): 6:26pm On Dec 15, 2011
Will upload tonight.
Re: The Finishing Of My House (Oluwa Champion) by princeonx: 7:56pm On Dec 15, 2011
^^^
N4.2m is way too much for decking work or was that a mistake?
Re: The Finishing Of My House (Oluwa Champion) by AmAlone: 8:19pm On Dec 15, 2011
^^^^

Bros Have you seen the house?
How would you know??
Do you know where the house was built?
Do you know that the design of a house can make it cost more to build?

Let see some pictures first.
Again the size of the house matters as well
Re: The Finishing Of My House (Oluwa Champion) by AmAlone: 8:28pm On Dec 15, 2011
Pictures update:

Sitting room POP is plain and simple!!!!

Kitchen is complicated and organized !!!
OLUWA CHAMPION OOO!!!!

Re: The Finishing Of My House (Oluwa Champion) by AmAlone: 8:38pm On Dec 15, 2011
Kitchen 2

Re: The Finishing Of My House (Oluwa Champion) by princeonx: 8:44pm On Dec 15, 2011
Am-alone:
Its true I haven't seen the pictures of the house but he said the top part took 6,600 plus 500 blocks that's about 7,100 pcs of blocks so how big can the house be? I didn't make my comment to challenge or dispute his cost that was why I asked if it was a mistake. The top part of my own four flat project is estimated to take about 6500-7000 blocks and I know It cost me about half of his own cost to do my own decking. As per location, am not judging his cost based on that cause his labour cost are about the same amount that I paid. If we were talking about foundation or German floor then I can assume that maybe his land is water log or in a wet zone which I don't know much about but we are talking about decking and I will really want to see a break down on how his decking only cost N4.2m at least for learning sake!
Re: The Finishing Of My House (Oluwa Champion) by AmAlone: 8:52pm On Dec 15, 2011
Okay!!! Lets just wait and see!!!!
Also, note that if you are building on a water log ground,
you decking needs an extra enforcement. Mostly 16mm iron rod will be used.

Again, I am not taking sides with him or you. I believe I ill have to see the pictures before I can comment.


Peace!!!!
OLUWA CHAMPION $
Re: The Finishing Of My House (Oluwa Champion) by princeonx: 9:10pm On Dec 15, 2011
Building size 80x50, room size 12x10 and 11x10 kitchen 9x7 kitchen veranda 5x7 toilet 6x5 palour 45square meter parlour veranda 3square metter

Above are the measurement he gave. As per building on a water log, foundation and German floor is where much much attention is needed not decking. A friend of mine is building on a water log ground and his German floor alone cost morethan my deckig while his decking was just a regular decking just like mine. He even used 12mm and just few 16mm for his decking because his engineer said the less weight on top the better especially due to the wet land. All the same, we shall see and learn.
By the way, am loving your finishing touches! Good job!
Re: The Finishing Of My House (Oluwa Champion) by drills: 9:14pm On Dec 15, 2011
@ Tbrown auto and Am alone I cant beleive your engineer took that little to deliver such a great project. Please can ypu feed me with the place you bought your tiles and. The number of your tilers if they did a nice job. Kevoawani@yahoo.com

(1) (2) (3) ... (7) (8) (9) (10) (11) (12) (13) ... (21) (Reply)

Building 4 Flats In Nigeria - Planning, Cost & Execution / How Much Is Roofing Sheets In Nigeria? / Building A Luxury Block Of Flats: Day-to-day Updates (with pictures)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 54
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.