PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Alkanelly: 5:37am On Jan 17, 2020
Hello experts,
Good morning to you all. Can someone tell me how much is the cost to sink a borehole in Port Harcourt.
I was giving a qoute of 170k which covers drilling (120k) and submersible pump (50k). Is the quote right? Help me with you input.
PropertiesRe: Ratings Of Nairaland Contractors: The Good, The Bad And The Ugly by Alkanelly: 12:46am On Jan 04, 2020
This is interesting write up. Thank you Sir. I am currently on a similar project just as yours in port harcourt.

Any port harcourt builder in the house...drop your number here for me.

Thanks in advance
PropertiesRe: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Alkanelly: 9:03pm On Dec 30, 2019
Timtol:
Amazing savings with the mix of 1:3:4 with 45bags for a whole german(oversite concrete).
After a week delay per the road construction we resume back with speed as the German ends in less than 4hrs...men here are stronger than Lagos men lol
Hello Timtol, can you explain your 1:3:4 mix, was the sand and granite measured by wheelbarrow or headpan.

Thanks
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Alkanelly: 5:36pm On Dec 11, 2019
Rubbiish:
It won't affect the structure
Thank you for the response.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Alkanelly: 5:35am On Dec 11, 2019
Hello experts in the house, good morning to you all.
So I am building a 4 unit of 2 bedroom flats, 2 flats up and 2 flat down. The decking is completed and i am now planning to start the first floor block setting, I a bit to cut cost and not compromise quality, by engineer has requested not to do a complete lintel chaining on this first floor but I did a complete lintel chaining for the ground floor.
My question is, will not chaining all the lintel together on the first floor affect the structure or load bearing capability of the building?
Please your input will be much appreciated.

PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Alkanelly: 5:53am On Mar 23, 2019
Aventures:
If I get you right, what you are doing presently is the decking of your two flats of 2 bedroom. If that is the case, then 312 bags if cement in overall is a bit on the high side. The mix ratio he is using in a more reasonable term is 1:4:6 which is poor for decking. The common minimum standard is 1:2:4(1 headpan of cement to 2 of sand and 3 of granite) also from your statement it seems the guy is using hand mixing and lastly why is he casting in bits.
Well the possiblity of doing everything in one day is not feasible, so he did the beams first and then did the slab after a day because because of shortage of cement and granite. I am concerned if the mixture ratio is poor for the decking.
PropertiesRe: Construction Diary Of An Executive Four Flats In Enugu by Alkanelly: 7:44am On Mar 22, 2019
Dubemcapital1:
Thanks alot. Spent about #3,550,000 in an Approximately 275 sqm slab and 18" deep beams

Thanks.
Thanks for the reply. How much would you say you have spent from the foundation to the finishing of the first floor slab. I think we have almost same square meter of area.
PropertiesRe: Construction Diary Of An Executive Four Flats In Enugu by Alkanelly: 3:23am On Mar 22, 2019
Dubemcapital1:
Casting the beams and the slab
Good job brother. Could you tell me how much you spent on the decking and that's the area in square meters if you don't mind. Am also building 4 units of 2 bedrooms, 2 up and 2 down.
Thanks
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Alkanelly: 2:54am On Mar 22, 2019
Experts in the house,
Please I need help and advice here. Here is my situation. I am in diaspora building a block of 2 bedroom flats, 2 down and 2 up
So am currently on the beam and first floor slab of my 4 units of 2 bedroom flats in port Harcourt. At this point the engineer has used 226 bags of cement to do the staircase, beams and one of the two flats on the ground floor, the other flat will be done today which I think may take another 90 bags of cement, so in total I am looking at around 312 bags of cement. My worry is that is that I think so much bags of cement has gone into the slab and beam. The mix ratio he is using is 1:2:3 according to him. I bag of cement, 2 wheelbarrow of sand and 3 wheelbarrow of granite. Is this acceptable, what your advice. The area of slab is 288m2 and I have currently spent up to 3.6 million naira.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Alkanelly: 9:25pm On Feb 03, 2019
twinskenny:
I don’t know the size of your building really.. am doing a project in Awka at the moment prices of 20mm high quality pipes here is 8000naira per bundle and we have 45pieces in a bundle... 25mm goes for same price but with 40 pieces in a bundle...


And why do they want to buy dB now? Considering u just want to deck? That should be after roofing...
Thank you Twinskenny for your response. I really don't even understand why they want the DB right now, am not planning to buy it now anyways. I will do more findings on the prices in port harcourt.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Alkanelly: 4:20pm On Feb 03, 2019
twinskenny:
which location is the project?
It's in Port Harcourt
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Alkanelly: 5:57am On Feb 03, 2019
Hello experts in the house, I you guys help me scrutinize these two different electrical job quote for my decking work. Do you guys think the prices and number of materials fair or overpriced.

Thanks you for your help in advance

PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Alkanelly: 12:59am On Feb 01, 2019
Chekitaut:
location of site.
Y8 by 210pcs makes a ton
Y10 by135pcs makes a ton
Y12 by 93pcs makes a ton
Y16 by 53pcs makes a ton
thank you @Chekitaut
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Alkanelly: 10:27pm On Jan 31, 2019
bixton:
What's the perimeter of the slab and type of structure?
the perimeter is 69.32m, the building is 22.7m x 11.96m. it is a 4 units of 2 bedroom flats. two up and 2 down.

Thanks
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Alkanelly: 8:34pm On Jan 31, 2019
Chekitaut:
18-20k per ton, engage an Engineer.
thank you for the response, he wants to charge 250k but i told him 180k was the last am going to pay, now am seeing that the 180k is even too much from what you have just mentioned. he gave me a quote for the rods, 100 pieces for 16mm rod, 290 pieces for 12mm rod and 70 pieces for 8mm rod, 3 rolls of binding wire and 250k workmanship.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Alkanelly: 5:51pm On Jan 31, 2019
hello Nairalanders, what is a reasonable charge for iron bender to complete iron work for my concrete slab including beams in port harcourt.
PropertiesRe: KNOW THE COST OF YOUR BUILDING PROJECT TODAY-GET YOUR BOQ &BUILDING ESTIMATES by Alkanelly: 6:08pm On Jan 19, 2019
raymondFirstborn:
Alkanelly
i can help you with the estimate for the decking, but i would charge you a small fee for it.
raymond we have done business before, so you might as well help me in your little way. i will appreciate it. thannks
PropertiesRe: The Making Of The "Anambra 5 Bedroom Duplex" by Alkanelly: 6:03pm On Jan 19, 2019
spyder880:
What's the total size of the deck in Sqm?
The building is 22.7m x 11.96m, so it's 271sqm. thanks for your response.
PropertiesRe: The Making Of The "Anambra 5 Bedroom Duplex" by Alkanelly: 3:07am On Jan 19, 2019
Hello Spyder880, you are doing a great job and i have been following your work and admiring it. I am currently working on a 4 unit 2 bedroom flats in port harcourt. i will need your professional advice on my building which i started last year September 2018. can you help with material i will need for my decking see attached drawings. am sorry if this is too much to ask.

PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Alkanelly: 7:22pm On Jan 16, 2019
Hello Experts in the house, Can someone tell me how many iron rods, bags of cement and woods etc i would need to complete the decking/slab of my 4 units of 2 bedroom flats in port harcourt. see the attached structural drawings for the slab, beams and stair for the building. thank you very much in advance

PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Alkanelly:
Hello experts in the house, please help me scrutinize these 2 quotes I got from 2 plumbers to just start the ground floor plumbing work for 4 bathrooms 2 visitors toilet and 2 kitchens on the ground floor. I think the quantity of materials are way too many and workmanship is too much. Though an not an expert and don't know much, so I need your candid advise on this. Thanks in advance.

Guys help me please...experts in the house

PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Alkanelly: 1:48am On Nov 10, 2018
Daboomb:
What kind of talk is this?

"To YOU" it is not expensive.
"To YOU" it is normal price.

When did "YOU" become a yardstick for judging what is normal or expensive or a benchmark?

and then you negated yourself by saying some charge more, some same or some less?
What exactly are you trying to say? If you have nothing to say about a question, you can just skip it.

If you want to benchmark price, you would use the price of contractors in that field, NOT YOUR PERSONAL FEELINGS.
I am sure you ended up confusing the @Op the more.

BTW: How much a Supervisor will charge will largely depend on the extent of the project.
A Bungalow Project's foundation to german floor, is not the same as that of a two stroey building Foundation to german floor.
Also, the nature of the soil of the place is a factor because foundation in a swamp is not the same as foundation in a highland / Red soil area.
Finally size of Project (land area covered by the foundation) is also a factor.

Despite all the above, the Supervisor is to stand around and make sure things are done properly. H is not the Builder naah?
200K maximum, irrespective of above factors, should be enough for supervision of blockwork to Lintel level.
100K for Block work (assuming 2weeks)
75K to 100Kmax for Lintel and Slab
Thank you very much for making it clear to me. i really appreciate
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Alkanelly: 1:43am On Nov 10, 2018
Timtol:
If I get you well, u mean block work for ground floor and decking, right?
yes
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Alkanelly: 12:32am On Nov 09, 2018
Rubbiish:
Your question no clear...300k to first floor slab or frm foundation to german floor?
i was charged 300k from foundation to german floor, now he wants to charge another 300k from the german floor to first floor slab. isn't that too much for the next phase of the building
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Alkanelly: 4:34pm On Nov 08, 2018
Hello Engineers and contractors,
please can someone tell me how much should an engineer/architect charge for supervising my building project. my engineer is asking for 300k to supervise from ground floor block setting to first floor slab (slab included). he charged me 300k from foundation to german floor which i think was even too much. please what's the best charge for the next phase in your honest opinion.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Alkanelly: 1:54pm On Oct 12, 2018
Hajivince:
I think you need a neutral person to help checkmate what is happening on site
I have my dad who was doing the buying of materials for me and my cause is also there in the absence of my dad.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Alkanelly: 1:52pm On Oct 12, 2018
nameoh:
what kind of soil is the land .
The soil is very solid, it is not a waterlog area.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Alkanelly: 1:50pm On Oct 12, 2018
bixton:
Were you not given a bill of material/labour schedule per stage/milestone?
Is there any variation if the above was given ?
Do you need a neutral person to pay a visit to the site if need be?
I have bill of material which was around 3.5M but I find it to be inaccurate, I am the buying the materials and bring it to site. I had my dad and cousin over see the project in my absence. I am just concern with how much money the housing is taking.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Alkanelly: 8:15pm On Oct 11, 2018
Hello fellow Nairalanders, please am concerned about my building project in port harcourt, the building has swallowed almost 4M and we haven't even started the oversite concrete, the building is 21.71m X 11.58m. so far we are filling the backfilling the rooms and getting ready to start oversite concrete slab. Note: this is a 4 unit of 2 bedroom all ensuite. should the cost be upto what it has taken? i am not in the country, could it be that something is not right? please i need advice.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Alkanelly: 11:18pm On Sep 30, 2018
please friends in Port harcourt, how much tonnage is a double axle trailer carrying granite and how much is that tonnage in port hacourt
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Alkanelly: 3:22pm On Sep 28, 2018
bixton:
Beautiful.
You have a good land/terrain there.
Please which axis of PHC is that?
Thank you, the area is Elimbu axis of PHC
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Alkanelly: 3:15pm On Sep 28, 2018
Born2Breed:
1:2:4
Please explain the bolded. Thanks.
am not a civil guy but i think it means 1 bag of cement mixed with 2 head pan of sand and 4 head pan of granite