Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by alstacs(m): 3:34am On Dec 13, 2017 |
Timtol: wow! oga nla u r wlc really appreciated oo...you've seen d approach of d 5bedroom mansion? coming are two proposed building...will update there not here a million tnx boss I have been hearing the word Mansion on properties session and I may be able to get an answer. Please, what is a mansion? |
Properties › Re: Architectural Plans,structural And Mep Design In General. by alstacs(m): 4:42am On Dec 10, 2017 |
Timtol: 4BEDROOM DUPLEX HALF PLOT 60FT BY 60FT EXTERNAL DIMENSION: 13.425M BY 10.8M
GROUND FLOOR
SIT-OUT, ANTEROOM, VISITOR WC, MAIN LOUNGE, LARGE DINING, KITCHEN/BAL, LARGE PANTRY, BEDROOM 1 ENSUIT, STAIRWAY.
FIRST FLOOR
UPPER LOUNGE, GALLERY, LAUNDRY, LARGE MASTER BEDROOM WITH WIC/WC, BEDROOM 2 ENSUIT, BEDROOM 3 ENSUIT, UPPER SIT-OUT.
...D SMALLEST ROOM WITH IT'S SIZE 12FT BY 12FT WITH LARGE ENOUGH TOILET....
For more info contact d chp ceo on whatsapp or mail...08100452977 mail....obed.toluwase@gmail.com
open d link below to view d 3d
https://www.nairaland.com/do_share?redirect=%2F3916073%2Fcornerstone-contemporary-design%2F7%2363109012&post=63109012&session=EA7BEF37FE5176369E3C3D63683C75FC5B8C53A2F170B864B0E1DA1CEFEE86FC Same issue here as well, the link keeps going to the home page |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by alstacs(m): 4:38am On Dec 10, 2017 |
Timtol: https://www.nairaland.com/do_unshare?redirect=%2F3916073%2Fcornerstone-contemporary-design%2F7%2363109012&post=63109012&session=EA7BEF37FE5176369E3C3D63683C75FC5B8C53A2F170B864B0E1DA1CEFEE86FC Bros.. This keeps taking us back to Nairaland home page ni fa |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by alstacs(m): 9:02pm On Dec 06, 2017 |
segzy14: Chai! Penny wise Pound foolish they say. Pay me professional fee, you no gree. Now you have lost all that money to bricklayers posing as Architects / Structural / civil engineers. Construction is not all about measurements and block arrangements. Make God deliver us from disaster. This is a great loss. A different perspective from me actually, 1. Poorly built cos baba Lati handled the project and he talked about how he is so experienced by working with Lord Smith since 1946. 2. Handled by a greedy professional contractor who diverted funds and underutilised the owners materials. 3. The owner didn't settled village people and they pointed fingers at the building in their sleep. In all the situations, make God save us from disaster |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by alstacs(m): 8:56pm On Dec 06, 2017 |
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by alstacs(m): 9:49pm On Dec 01, 2017 |
gbadexy: let me help hajji out here. screeding is done after plastering the building. cement screeding is smoother and better in my opinion. I used to have pictures of cement screeding of different projects but i don't have them anymore. However, I will post pictures of a painted project that cement screeding was used. just for the record, I don't get involved in any form of screeding, I'm just giving my personal opinion. I've seen countless of pop screeding on sites and I've seen cement screeding and I only speak from my observation. On a professional level, cement screeding doesn't set fast and won't waste materials. it's smoother because it has longer open time to work it and has free lime to make it flexible when working before it sets. water doesn't affect it, and water in paints also combine with the cement to further hydrate it. The water won't evaporate from the wall but would rather be soaked in by the cement to further hydrate it and make it stronger. The paint would therefore be chemically linked with the wall. it's won't peal off easily unlike pop screeding. There is no cement/sand plaster that can give the level of smoothness as screeding. no matter how many times the sands are sifted. you only need to compare the aggregate of both. The aggregate in pop emulsion paint used as the aggregate is calcium carbonate powder. you are basically comparing plaster sand to calcium carbonate powder in smoothness. I've seen very well plastered walls that doesn't require screeding for matte emulsion to be applied on it, however it would still need to be screeded for satin to be applied on it. satin is thin and light and the tiny pores on cement plaster would be obvious and won't give that perfect smooth finish.
modified to include cement screeding This is a very detailed write up. More grease to your elbow boss. I'm better informed now and I would seek to get this done. Knowing all these advantages, ( I would want to assume materials are also cheaper...) why don't people go for this option cement screeding? One last question, who does cement screeding? POP guys or masons? |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by alstacs(m): 3:50pm On Dec 01, 2017 |
mufutau55: Yes. Yiu can use cement screeding anywhere. That is what I used on my present project for internal and external. Yiu can use any cement, it depends on who do your screeding. My unqualified opinion.
Hajji M. Alhaji, I have two questions, 1. this cement screeding is a process after normal plastering I presume? Or is it done during the normal plastering? 2.what does it look like? I sincerely am not comfortable with POP screeding outside, so this will be a good option for me. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by alstacs(m): 12:04pm On Dec 01, 2017 |
Ciga22: Hello Guru's in the house, please i have a plot of Land in Enugu measuring 90x60, i will want to know how much it will cost me to put a tiny duplex of 4 bedrooms so as to maximize enuff space for a 3 storey building(2 bedroom flat) inside the same compound as the case maybe. I will be glad to receive some sample drawings of the duplex..(if possible no dining included and no upstairs parlor) (sigaadera@gmail.com)
Sounds like you want a duplex of 4 bedrooms fully detached, then you want another 3 storey building on the same plot. What will the 3 storey building contain?
I want to start building asap. thanx |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by alstacs(m): 8:42am On Dec 01, 2017 |
Truthinlife: Hello everyone, I’ve seen how beautiful cement screeding looks on external wall. Can cement be used in screeding internal walls also (Rooms,Living rooms etc).Is there a particular brand of cement recommended for screeding. A beg wetin be cement screeding? . I look at POP screeding on must external walls and they way they flake off easily and the whole house looks disgusting afterwards. Maybe this cement screeding go withstand our harsh tropical weather. I would like to know more about it... |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by alstacs(m): 2:11am On Nov 30, 2017 |
rotecch77: They said we are fighting for contract. Truth is bitter, I jejely seal my mouth as I don't know anything. Seat down look naa hm better now Nor be so Oga mi. Your guys nor de try. Person ask simple question for 3 days no human reply am, person wey come reply became a victim or bashing and percussions... All professionals . The person that asked the question too became an object to be poached on with... contact me on whatsapp,... Send me a private email etc. I was tempted to look at the topic of thread again and I knew this thread has been very educative and supportive. However these days, e be like say things don de change. I hope I could post pix of my building projects someday.... I was focused, got better deals, knew what I was doing... All because of the information and support I got from this thread and the good people (not necessarily professionals) who were willing to share their experiences and knowledge. We need to keep that going here. You can save a life! |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by alstacs(m): 1:23am On Nov 29, 2017 |
tevanso: Bros, where will labour collect 40k for excavation of fence for 4 plots . So what do you think, oga? You think it is too much or it is too small? |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by alstacs(m): 1:20am On Nov 29, 2017 |
DECORCOLOR: Call us for your stamp concrete, Epoxy and 3D What is the rough estimate per square metre for this stamp thing... How enduring is this to our tropical weather? |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by alstacs(m): 1:17am On Nov 29, 2017 |
johnson232: For those of us that have been here, it is only natural to omit certain info when posting on here. We have seen it several times. It is now left for the individual concerned to ask questions. No one is paying anybody here for the info they dish out, so those who take out their time to post sth should be appreciated, because left for some of u, no one will get any info here without paying for it. Just completed fencing a plot of land with a similar quote posted by someone recently. So info as such are very much useful to us.... God bless you sir |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by alstacs(m): 1:16am On Nov 29, 2017 |
skimanski: No one said visit the land. You only ask certain Questions before giving information. So that you dont give wrong/incorrect information. Anyway I see how you love to Benefit from Wrong Information! Nice one!!! nor be so. The response wasn't supposed to be a professional quote which should be subjected to a magnifying glass scrutiny.... A rough guide it was... He was also detailed enough to say things may change depending on location, topography etc... Make una free the man jare... Even if he's not accurate, we like am like that. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by alstacs(m): 1:13am On Nov 29, 2017 |
johnson232: Oga park well... What about all the quotes we have be seeing on this very thread? Which alot of us has benefited from.... Do they visit the land before coming up with those quotes? Pls lets not disuade pple from sharing info here The thread is already dwindling knowledge wise.... Thank you jare... Bro, God bless your muscles. It is not as if the OP will not hand the work over to an expert before. After getting this rough guidance here, he will be better informed or better guided when he negotiates with some hawks of professionals outside. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by alstacs(m): 1:09am On Nov 29, 2017 |
Rubbiish: U should have asked the no of coach U guys don't need to start gathering meeting on my post What i did was only a guide & i see absolutely nothing wrong in that If u have sth better post it. I m not here to drag contract with anyone I clearly stated the figures are subject to change depending on location
Oga calculate the number of blocks for a 10coach fencing & post the number of blocks for pillars here @bold. Abi oh... Lol |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by alstacs(m): 1:09am On Nov 29, 2017 |
Rubbiish: U should have first of all asked about my location & number of course which i proposed for the fencing before studiously & subtly condemning my post. He gave 100ft by 200ft land size. U do the calculation, using 3blocks as columns for 10 course fencing @ a spacing of 3m & see the no of blocks u will get for fencing. I clearly stated the figures are subject to change regarding location & i was never expecting the op to use it as his final post, but to serve as a guide. If u have got something better & closer to his post, u should have posted it. I swear, I respect you more on this even if the figures are not what the "Oga professionals" them want. Why would your figures even make sense when people feel... No, the OP should pay for the info. What I dislike is the way everybody came in condemning your post without giving alternative suggestions or to state what is actually wrong with your figures. Some were even outrightly sarcastic. Kí ló de? The other I don't understand is the rapid sharing of phone numbers for professional advice.... By the time person schuk head inside that one... Story for the gods go begin... |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by alstacs(m): 9:03pm On Nov 25, 2017 |
AZUH: Who else knows how to modify chicken legs pillars ? I've been hearing chicken leg pillars here... Seeing this picture, I couldn't help but laugh out loud alone... It is well |
Properties › Re: After Roofing A House, What's The Next Thing To Do? by alstacs(m): 5:38am On Nov 24, 2017 |
Henrick007: giving price when you don't know the number and sizes of Windows on the building Those are signs of highly spiritual end time contractors na... Lol. |
Properties › Re: Installation Of Stonecoated Tiles In Port Harcourt by alstacs(m): 5:22am On Nov 24, 2017 |
My oga, great pix here. Kudos. I wish you also talk more about the style or design of roofing tiles or aluminum chosen, why your client preferred that, the surface area, the roof design abi na style etc... Well done sir. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by alstacs(m): 9:06am On Nov 18, 2017 |
twinskenny: To avoid damage cable before pop God bless your muscles, bro. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by alstacs(m): 4:27am On Nov 18, 2017 |
chidexy: I am currently on POP, so will give you an idea on the likely cost estimation. I have 120 m² concluded already and a further 100 m² ongoing. I bought the materials quoted by the guys handling the project. For their workmanship, I paid 1k per m². The cost of materials would likely be significantly cheaper in Lagos than in Ebonyi state. For the materials and how much I paid for them, you'll find the info on page 809 onwards on this thread. I had previously posted them HI bro. I notifed you used 40 bags of cement and 40kg of fibre for 120sqm, may I assume that it is generally 1 bag of cement and 1kg of fibre for 3 sqm of POP ceiling? Or are there other factors that determine this? In addition, what would you advise? To run electric cables before POP ceiling or cables could be run later? I noticed price of cables nor de smile now oh... |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by alstacs(m): 10:27pm On Nov 11, 2017 |
mank1234: You've been looking for this company? Where? You registered on 23rd September and your only post is to recommend an entity.
If I were a client, I'll be suspecting that you're linked to the company. You can clear doubts by posting evidence of your previous dealings with the company. Seconded!  |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by alstacs(m): 9:23pm On Nov 06, 2017 |
mufutau55: That is what my Electrician recommended. One for downstairs and one for upstairs, I guess to separate the load.. It's a big duplex, so I agreed to it. I don't know much about electricity in Naija o.
Hajji M. My electrician is using 3 DBs for my own duplex . One each for the ground, first and pent floor. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by alstacs(m): 4:53am On Nov 06, 2017 |
true2home: I read this article and think its useful here....
What The New Lagos Tenancy Law Says:
The new Lagos State Tenancy law has been generating a lot of debate since it was enacted by the Lagos State House of Assembly last Friday from today, we begin the serialization of the entire law:
For a law to regulate rights and obligations under tenancy agreements and the relationship between the Landlord and the tenant including the procedure for the recovery of premises and for other connected purposes in Lagos State
The Lagos State House of Assembly enacts as follows:
General Application 1. Application of Law
2. (1) This Law shall apply to all premises within Lagos State, including business and residential premises unless otherwise specified (2) This Law shall not apply to : (a) residential premises owned or operated by an educational institution for its staff and students; (b) residential premises provided for emergency shelter; (c ) Residential premises (i) in a care or hospice facility; (ii) in a public or private hospital or a mental health facility; and (d) that is made available in the course of providing rehabilitative or therapeutic treatment.
2. Jurisdiction of the Courts (1) A Court shall have jurisdiction on application made to it by a landlord or tenant or any interested person to determine matters in respect of the tenancy of any premises let before or after the commencement of this Law. (2) The jurisdiction of a Court shall not be ousted by the defendant or respondent setting up the title of any other party. (3) Proceedings may be brought under this Law at the High Court or at the Magistrates Court in the division or the Magisterial District in which the subject matter giving rise to the proceedings is located. (4) Subject to the provision of this Law, a Court shall be bound by the practice and procedure in civil matters in the Magistrates Court or the High Court of Lagos State.
3. Tenancy Agreement For the purposes of this Law, a tenancy agreement shall be deemed to exist where premises are granted by the landlord to a person for value whether or not it is (a) express or implied; (b) oral or in writing or partly oral or partly written; or (c) for a fixed period.
4. Advance Rent (1) It shall be unlawful for a landlord or his agent to demand or receive from a sitting tenant rent in excess of three (3) months in respect of any premises. (2) It shall be unlawful for a sitting tenant to offer or pay rent in excess of three (3) months in respect of any premises. (3) Any person who receives or pay rent in excess of what is prescribed in this section shall be guilty of an offence and shall be liable to a fine of one hundred thousand naira (N100,000.00) or to three (3) months imprisonment or any other non-custodial disposition.
5. Rent payment receipt (1) As from the commencement of this Law, all landlords of premises shall upon payment of rent by the tenants, be obliged to issue a rent payment receipt to their tenants in respect of such payments. (2) The receipt shall state the (a) Date of which rent was received; (b) Name of the landlord and the tenant; (c) Location of premises in respect of which the rent is paid (d) Amount of rent paid; and (e) Period to which the payment relates. (4) Any landlord who fails to issue a rent payment receipt to his tenant as prescribed under this Section, shall be liable to a fine of ten thousand Naira (N10,000.00) payable to the Court.
RIGHTS AND OBLICATIONS OF LANDLORD AND TENANT 6. Rights of the parties (1) The tenants entitlement to quiet and peaceable enjoyment includes the right to: (a) reasonable privacy; (b) freedom from unreasonable disturbance; (c) Exclusive possession of the premises, subject to the landlords restricted right of inspection and (d) the use of common areas for reasonable and lawful purposes. (2) Where a tenant with the previous consent in writing of the landlord, effects improvements on the premises and the landlord determines the tenancy, such a tenancy shall be entitled to claim compensation for the effect improvements on quitting the premises.
6. Obligations of the Tenant Subject to any provision to the contrary in the agreement between the parties, the tenant shall be obliged to do the following: (1) Pay the rents at the times and in the manner stated. (2) Pay all existing and future rates and charges not applicable to the landlord by law. (3) Keep the premises in good and tenantable repair, reasonable wear and tear excepted. (4) Permit the landlord and his agents during the tenancy at all reasonable hours in the day time by written notice, to view the condition of the premises and to effect repairs in necessary parts of the building. (5) Not to make any alterations or additions to the premises without the written consent of the landlord. (6) Not to assign or sublet any part of the premises without the written consent of the landlord. (7) Notify the landlord where structural or substantial damage has occurred to any part of the premises as soon as practicable.
7. Obligations of the Landlord
8. Subject to any provision to the contrary in the agreement between the parties, the landlord shall be obliged to do the following: (1) Not to disturb the tenants quiet and peaceable enjoyment of the premises. (2) Pay all rates and charges as stipulated by law. (3) Keep the premises insured against loss or damage. (4) Not to terminate or restrict a common facility or service for the use of the premises. (5) Not to seize or interfere with the tenants access to his personal property. (6) Effect repairs and maintain the external and common parts of the premises.
9. Obligations of landlord regarding business premises only Subject to any provision to the contrary in the agreement between the parties, a business premises agreement shall be taken to provide that where the landlord (a) inhibits the access of the tenant to the premises in any substantial manner; (b) takes any action that would substantially alter or inhibit the flow of the customers, clients or other persons using the tenants business premises; (c) causes or fails to make reasonable efforts to prevent or remove any disruption to trading or use within the business premises which results in loss of profits to the tenant; (d) fails to have rectify as soon as practicable, any breakdown of plant or equipment under his care and maintenance which results in loss of profits to the tenant; or (e) fails to maintain or repaint the exterior or the common parts of the building or buildings of which the premises is comprised and after being given notice in writing by the tenant requiring him to rectify the matter, does not do so within such time as is reasonably practicable, the landlord, is liable to pay to the tenant such reasonable compensation as shall be determined by the Court, where the tenant effects the repairs or maintenance.
10. Service Charge, Facilities and Security Deposits In any case where the landlord or his agent may in addition to rent require the tenant or licensee to pay: (a) a security deposit to cover damage and repairs to the premises; (b) for services and facilities for the premises; or (c) service charges in flats or units that retain common parts on the premises, the landlord or his agent shall issue a separate receipt to the tenant for payments received the such tenant shall be entitled to a written account at least every six (6) months from the landlord of how moneys paid were disbursed.
11. Provision for re-entry Subject to (a) any provision to the contrary in the agreement between the parties; and (b) the service of process in accordance with the relevant provisions of the Law, upon the breach or non-observance of any of the conditions or covenants in respect of the premises, the landlord shall have the right to institute proceedings for an order to re-enter and determine the tenancy.
12. Length of Notice (1) Where there is no stipulation as to the notice to be given by either party to determine the tenancy, the following shall apply (a) a weeks notice for a tenant at will; (b) one (1) months notice for a monthly tenant; (c ) three (3) months notice for a quarterly tenant; (d) three (3) months notice for a half-yearly tenant; and (e) six (6) months notice for a yearly tenant. (2) In the case of monthly tenant, where he is in arrears of rent for three (3) months, the tenancy shall be determined and the Court shall make an order for possession and arrears of rent upon proof of the arrears by the landlord. (3) In the case of a quarterly or half-yearly tenant, where he is in arrears of rent for six (6) months, the tenancy shall be determined and the Court shall make an order for possession and arrears of rent upon proof of the arrears by the landlord. (4) Notice of tenants under subsection (1) ( ), (d) and (e) of this Section need not terminate on the anniversary of the tenancy but may terminate on or after the date of expiration of the tenancy. (5) In the case of a tenancy for a fixed term, no notice to quit shall be required once the tenancy has been determined by effluxion of time and where the landlord intends to proceed to Court to recover possession, he shall serve a seven (7) days written notice of his intention to apply to recover possession as in Form “TL4†in the Schedule of this Law. (6) The nature of a tenancy shall, in the absence of any evidence to the contrary, be determined by reference to the time when the rent is paid or demanded.
13. Notice to Licensee Where a person is a licensee and upon the expiration or withdrawal of his license, he refuses or neglects to give up possession he shall be entitled to service of a seven (7) days notice of the owners intention to apply to recover possession as in Form “TL4†in the Schedule to this Law.
14. Notice required for abandoned premises (1) A premises will be deemed to be abandoned where the (a) tenancy has expired; and (b) tenant has not occupied the premises since the tenancy expired and has not given up lawful possession of the premises. (2) Following subsection (1) above, the landlord shall (a) issue a seven (7) days notice of the landlords intention to recover possession as prescribed in Form “TL4â€, which shall be served by pasting the notice on the abandoned premises; and (b) apply to the court for an order for possession and an order to force open the premises.
15. Tenant refusing or neglecting to give up possession As soon as the term or interest of any premises has been determined by a written notice to quit as in Form “TL2†or “TL3â€, in the Schedule this his Law and the tenant neglects or refuses to quit and deliver up possession of the premises or any part of it, the Landlord or his agent may cause the tenant to be served with written notice as in Form “TL4â€, signed by the Landlord or his agent, of the landlords intention to proceed to recover possession, stating the grounds and particulars of the claim, on a date not less than seven (7) days from the date of the notice.
16. Service of Notices (1) Notices referred to under Sections 12-15 of this Law shall be by proper service as prescribed under Section 17 and 18. (2) Proper service shall be service in such a manner that it can be established to the satisfaction of the court that the person to be served will have knowledge of any of the notices.
17. Service of Notices for Residential Premises Proper service on a tenant of residential premises shall be personal service, which includes but is not limited to the following (a) service on the tenant in person (b) delivery to any adult residing at the premises to be recovered (c) by courier where the tenant cannot be found, by delivering same at the premises sought to be recovered and the courier shall provide proof of delivery; or (d) affixing the notice on a prominent part of the premises to be recovered and providing corroborative proof of service.
18. Service of Notices for Business Premises Proper service on a tenant of a business premises shall be by (a) delivery to a person at the business premises sought to be recovered; or (b) affixing the notice on a prominent part of the premises to be recovered and providing corroborative proof of service.
19. Duty to notify other persons in occupation Where the tenant is a person other than an individual (including a corporate entity), the landlord shall ensure proper service of all notices required under this Law on the tenant: Provided that the failure of the tenant to notify any other person in occupation shall not affect the proceedings to recover possession.
20. Persons in unlawful occupation Where a person claims possession of premises which he alleges is occupied solely by a person in unlawful occupation, the proceedings for recovery of the premises shall be by the summary procedure contained in the Civil Procedure Rules of the relevant court.
21. Service of process Service of any summons, warrant or other process shall be effected in accordance with the provisions of the law for the time being in force relating to the service of the civil process of Magistrates Court or the High Court of Lagos State.
22. Use of Forms Subject to the provisions of this Law, the forms contained in the Schedule to this Law, may be used in the cases to which they apply and when so used, shall be sufficient in Law. 23. Institution of proceedings to recover possession
Upon the expiration of the time stated in the notice as in Form if the tenant neglects or refuses to quit and deliver up possession, the landlord may file a claim by way of summons as in Form for recovery of possession, either against the tenant or against such person so neglecting or refusing, in the Magisterial District or High Court Division where the premises is situated.
24. Grounds for Possession
(1) Unless the agreement expressly stipulates otherwise, the Court shall have power to make an order for possession upon proof of any of the following grounds –
(a) arrears of rent;
(b) breach of any covenant or agreement;
(c) where the premises is reasonably required by the landlord for personal use; and
(d) where the premises requires substantial repair.
(2) Notwithstanding any agreement between the parties, the Court shall have power to make an order for possession upon proof of any of the following grounds:
(a) the premises is being used for immoral or illegal purposes;
(b) the premises has been abandoned;
(c) the premises is unsafe and unsound as to constitute a danger to human life or property; or
(d) the tenant or any person residing or lodging with him or being his sub-tenant constitutes by conduct, an act of intolerable nuisance or induces a breach of a tenancy agreement.
25. Recovery of possession for a fixed term certain
Where –
(a) a tenancy is proved to be for a fixed term certain;
(b) the period of the tenancy has expired by effluxion of time; and (c) Form has been served in accordance with Section 12(5) of this Law, the landlord shall be entitled to recovery of the premises.
26. Trial
(1) In any matter under this Law, relating to any fact required to be proved at the trial of any action, evidence may be by written deposition or oral examination of witnesses in open court.
(2) All agreed documents or other exhibits shall be tendered from the bar or by the party where he is not represented by a legal practitioner.
(3) The oral examination of a witness during his evidence-in-chief may be limited to confirming his written deposition and tendering in evidence all disputed documents or other exhibits.
(4) Where the tenant does not enter any defense and the landlord can prove-
(a) that the defendant is still neglecting or refusing to deliver up the premises;
(b) the annual rental value of the premises;
(c) the nature of the tenancy or holding;
(d) the expiration or other determination of the tenancy within the time and manner stipulated by law;
(e) the title of the landlord, if such has accrued since the letting of the premises; and
(f) the service of the summons or writ if the defendant does not appear,
the court may make an order as in Form for possession of the premises mentioned either immediately or on or before such time as the Court may direct, subject however, to a limit of six (6) months after the date the order is made.
(5) Subject to the provisions of Section 12 (2) and (3), the court shall, in making an order for possession of premises, have regard to all circumstances of the case including where appropriate, the question as to whether other premises are available for the landlord or the tenant.
(6) If the claimant named in the summons or writ fails to obtain an order under subsection (1) of this Section, the defendant may be awarded such costs as the Court may direct.
or enquiries contact aiskworld on : :07080318032. or chat us on whatsapp on the following numbers:08100868608,08101351208,08101353450. or visit our office at no.1, Obadiah Street off Community Road Akoka, Lagos, Nigeria. or visit our website on aiskworld.com.
or more details and real estate articles, please click the link below: http://kingsleyubujekwu..com.ng/2017/10/the-new-lagos-tenancy-lawwho-does-it.html
(Quote) (Report) 1 Like (Unlike) 1 Share (Un-Share) This is very good. I wish specific subsections could be discussed and digested cos we take many uninformed decisions as tenants and landlords. What about the national tenancy law? |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by alstacs(m): 9:59pm On Nov 05, 2017 |
mufutau55: That is ridiculous as a professional... he should at least give you estimate for the materials. Then you guys go to market with him and buy the materials for the actual cost. He can later tell you to pay him for anything you feel for the Labor since he is a relative.
One of my project, for example: Duplex of 7 Bedrooms all ensuite, 2 big Livingrooms, anteroom, 2 balconies, Kitchen,Visitors Toilet, Security Guard House. Materials was around N280k because I got 3 DB Boxes (2 3Phase for each Duplex floor and 1 Single Phase for Security House). Labor for the pipings work was N70k. Please note this is only pipings and nothing more. Hope this helps.
Hajji M. He actually buys the materials with me. Your contribution is very helpful, I can give him something reasonable from an informed point of view now. E seun a dúpẹ́ sah. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by alstacs(m): 9:50pm On Nov 05, 2017 |
twinskenny: 80k should do sir.. I'm grateful boss. God bless you. Thank you for being there always. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by alstacs(m): 7:59pm On Nov 05, 2017 |
twinskenny: depending on the type of db should be between 250k 300k materials labour inclusive Thank you very much sir and for you input Hajj Mufutau. He makes me buy all the materials, I need to have an idea how much to pay him for workmanship only. He's trying to mix family with business, he need the pay but he feels he can't charge me... Lol. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by alstacs(m): 4:43pm On Nov 05, 2017 |
Hello house what would sound like a fair price for an electrician laying pipes before plastering of walls? I dint have any quotations, he wouldn't give me; he's relative and he's good. It's a 3 bedroom flat with a 2 bedroom pent floor making 5 rooms, 2 sitting rooms 6 bathrooms. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by alstacs(m): 11:31pm On Oct 31, 2017 |
Daboomb: Dont be too concerned about how much the Contractor quoted (I am not saying you should not be worried if given an unreasonable quote). What l think you should pay more attention to, is that the job is well done and your Parrapet wont start falling-off after a few years, l have seen such happen.
To be sure you are not wasting money or being coned, get involved in your building. Negotiate labour alone while you buy and supply the needed Cement, Sand, Iron and wood to do the form-work. keep a close eye on what is being done and ensure they stick to "good standards".
You may agree to even #200,000 and the Contractor then spacse the hanging irons at distances that are too far apart to give effective support or fills the Parapet with a very weak mix of concrete (in your absence) and you will never know, until a few years down the line. 
I would say you read through this thread and other threads where Parapet has been done so you can familiarise yourself with the knowledge because it is not a big deal at all (if you read and have the knowledge o).
A good build is not just about how much (High or Low) is charged or paid, it is more of KNOWLEDGE and CORRECT SUPERVISION
Goodluck. Thank you very much, boss. I really appreciate your guidance and I just tell you that I've enjoyed this support for almost 2 years now. I must apologise I misled you, the quotation is actually for water collection system round the edge of the roof and not parapet. Pls find the quotation attached
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by alstacs(m): 7:16pm On Oct 30, 2017*. Modified: 12:46am On Oct 31, 2017 |
KolaShangOne: Its quite much for your building footprint. Your house is just 17m x 14m approx. I just finished installing (some days ago) for a house of about 24m x 16m and total cost was about 300,000 although we used a cost saving method.
But if you're using PVC for the gutter and downpipes, you will spend 350k or thereabouts.
If you need more details, contact me on +2347038935532. I got a quotation of 290k for parapet dimensions of 17m x 13m. Would that be appropriate or fair? |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by alstacs(m): 11:20pm On Oct 29, 2017 |
mufutau55: Thank you Sir. (Of course I learnt/learning from you all, the Masters here)
I like this order: 1a. Turkey/Chinese/Local Iron/Steel doors before tilings so all the braces underneath can be leveled/tiled. 1b. Also if this is bathroom or kitchen with tiles all around the doors... makes it look better and rounded.
2. If Wooden doors with or without architraves, install the frames or sub-frames first and all around well plastered.
3. Install the actual Wooden doors after the tilings. Sorry.. if I have missed anything. And I stand corrected.
Hajji M. This is quite elucidating. Thanks a lot boss |