₦airaland Forum

Welcome, Guest: RegisterLoginWith GoogleTrendingRecentNew

Stats: 3,331,299 members, 8,449,622 topics. Date: Wednesday, 22 July 2026 at 06:59 AM

Toggle theme

Aventures's Posts

Nairaland ForumAventures's ProfileAventures's Posts

1 2 3 4 5 6 7 8 ... 34 35 36 37 38 39 40 41 42 (of 60 pages)

PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 1:41pm On Aug 25, 2012
Plastering ongoing internally
PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 9:28pm On Aug 24, 2012
Meanwhile prior to commencement of plastering, windows, burglary fabrication commenced earlier and were delivered at the right time.
we have 54 windows of various sizes in this building (1.5m x 1.5m, 1.5m x 1.4m, 0.9m x 1m, 0.6m x 0.9 etc)

PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 9:08pm On Aug 24, 2012
B4 commencing plastering we set the gauge using Good plum and range, broken tiles, builder's square.

PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 2:38pm On Aug 24, 2012
Thanks! D project is in one of d estate within Arepo along lagos-ibadan exp.
PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 5:51pm On Aug 23, 2012
Well after completion of the building's carcass. We proceeded to plastering stage, though we had run all necessary conduit pipes with good caution for electrical and plumbing. Well, i will like to point out the procedure we follow in other to achieve an excellent plastering stage:
1. I took time to outsource for good masons that can plaster wt guage at an agreed rate.
2. i carefully select material i:e quality plaster sand with less dirts, fine sharp sand and sound cement.
3. thourough supervision of the guage setting,right mixing of cement and sand, ensuring adequate set time b4 robbing.

what are the advantages of this precauitons:
1. Plastering with gauge will take care of all iregullarities in block setting, it will ensure a paerfect angle and it will give ur spaces a perfect shape for instance if ur room is 3.6m x 3.6m and posibily during block seeting their is a little variation u can use the gauge to take care of this. The beauty of this is seen on ceiling and tilles as they will both come out with perfect shape.
2. using a dirt free plaster sand or a seived plaster sand will ensure ur building doesnt av holr=es in nearest future (Ajah plaster sand is of advantage in this area cos they are very dirt free.
3. Mixing a fine sharp sand with soft sand for plastering ensure good strenght, quick dry time, and prevent surface crack.
subsequently the pics will speak little more.
PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 7:49pm On Aug 22, 2012
maninmood: I guess you are showing us the house pictures to see how beautiful they are; not to have a relevant knowledge of what you are trying to put forth. Including respective expenses on each stage of your project is a good plus. Borrow d leaf from spyder, brabus,et al. Cheers
I guess u didnt read the tread from the start, i was previously giving the detail of material breakdown and cost but some pros in da house call me to order wc i quite agree with them. so i av intention of giving comprehensive work stages cost (lump sump) later. Meanwhile as per knowledge abt this project, i wish to inform you that the entire concept from scracth to this stage was absolutely mine (architectural and structural design,3D, costing and construction). so ask whatsoever u wish to know abt this project i am here to give u answer. cheers
PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 8:41pm On Aug 20, 2012
more pics

PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 1:21pm On Aug 20, 2012
Thanks, more pics to come.
PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 1:10pm On Aug 19, 2012
Theroof covering pics

PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 8:33pm On Aug 18, 2012
After roof Beam the precast beam were fixed, followed by roof carcass

PropertiesRe: 3 Bedroom Bungalow fenced with gates For Sale! with Pics by Aventures(op): 4:19pm On Aug 17, 2012
smiley
PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 4:19pm On Aug 17, 2012
Final block work at finishin level and the roof beam , lintel all completed. house ready for roofing.

PropertiesRe: Land 4sale In Acres & Plots At Iyana Iyesi Behind Cannaan Land. 4.5m/800k C Of O by Aventures(op): 4:15pm On Aug 17, 2012
still on board
PropertiesRe: A Beautiful Mansion To Let In Forestry Hill Estate In Jericho At 4.5m by Aventures(m): 8:11pm On Aug 16, 2012
D total package is it for 10 yrs
PropertiesLand 4sale In Acres & Plots At Iyana Iyesi Behind Cannaan Land. 4.5m/800k C Of O by Aventures(op): 3:28pm On Aug 16, 2012
We have for sale Large expanse of Land for sale in a good and fast developing location in Iyana Iyesi Ota. Directly behind Cannaan Land.

Title : C of O and approved layout

Topography: Dry,and flat terrain.

Price: Acre=4.5M, Plot= 800K.

Contact Abidoy Ventures 0n 08023142108 or abidoyventures@gmail.com
PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 3:10pm On Aug 16, 2012
more pics

PropertiesRe: 3 Bedroom Bungalow fenced with gates For Sale! with Pics by Aventures(op): 3:07pm On Aug 16, 2012
check it out
PropertiesRe: A 3 Bedroom+2bedroom Bungalow For Sale @magboro by Aventures(m): 7:45pm On Aug 14, 2012
If u are serious abt selling upload pics and put price or else u may not get any response
PropertiesRe: 3 Bedroom Bungalow fenced with gates For Sale! with Pics by Aventures(op): 7:37pm On Aug 14, 2012
Still waiting 4 u
PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 7:23pm On Aug 14, 2012
More pics

PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 8:38pm On Aug 12, 2012
Pix

PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 12:57pm On Aug 08, 2012
More

PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 11:34am On Aug 08, 2012
More pix

PropertiesRe: Portfolio Of Seasoned Builder/engineer by Aventures(op): 6:41pm On Aug 06, 2012
cry
PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 4:59pm On Aug 06, 2012
Pics

PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 7:14am On Aug 06, 2012
Having putting up d first floor columns, then d skeleton is 85 per cent complete. At this stage we have d option of completing d frame/skeleton by adding the roof beam and parapet/cladding or laying of blocks starting from d upper floor (adding of flesh) while d slab is still being supported by d bamboos props till after 28 days of curation period. In this case we opted for d option of laying of blocks. Pics thereafter illustrate more.
PropertiesRe: Building A 5 Bedroom Duplex In Ebonyi State by Aventures(m): 3:22pm On Aug 05, 2012
I am happy dat u understand u av a tight budget, at least once u consider cost mngt frm onset it will help a lot. Best of luck.
PropertiesRe: Building A 5 Bedroom Duplex In Ebonyi State by Aventures(m): 8:28pm On Aug 04, 2012
Good one! But i av a little reservation abt ur budget 12.2m to completion!! I will love to c dis possible without compromising standard. Moreover like oliver twist can u share d budget break down in phases pls.
PropertiesRe: A Building 4 Sale @allen by Aventures(m): 9:38pm On Aug 03, 2012
What is ur net price?
PropertiesRe: Construction Process Of A Wing Duplex+flat At Ajah by Aventures(m): 9:30pm On Aug 03, 2012
Oga we re waiting o o
PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 6:33pm On Aug 01, 2012
cry
PropertiesRe: Construction Process Of A Wing Duplex+flat At Ajah by Aventures(m): 9:27am On Aug 01, 2012
Bros, no buga us, we kno that at most u will use stone coated metro tiles otherwise known as shingles. The type of roof covering has noting to do wt class it is a matter of choice, if i like i fit use asbestos LOL. Well we kip our finger cross hoping to c!!!

1 2 3 4 5 6 7 8 ... 34 35 36 37 38 39 40 41 42 (of 60 pages)