PropertiesRe: A Fenced Plot Of Land @ Omitoro, Off Ijede Rd Ikorodu. 4 Sale. by Aventures(op): 7:49am On Sep 11, 2012
call now
PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 7:33am On Sep 11, 2012
@Farm+: Precast parapet is Cheaper and quite limited in design. But in_situ parapet is far expensive but stronger and flexible i design.
PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 9:01pm On Sep 10, 2012
closer shot of the parapet

PropertiesRe: A Fenced Plot Of Land @ Omitoro, Off Ijede Rd Ikorodu. 4 Sale. by Aventures(op): 8:36pm On Sep 10, 2012
call now for a good deal.
PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 1:49pm On Sep 10, 2012
ANOTHER PICS OF PARAPET WE JUST DID. SORRY THIS IS NOT A CLOSER SHOT BUT HOPE TO GET ANOTHER SON

PropertiesA Fenced Plot Of Land @ Omitoro, Off Ijede Rd Ikorodu. 4 Sale. by Aventures(op): 1:12pm On Sep 10, 2012
A FULL PLOT OF LAND 120 X 60FT FOR SALE AT OMITORO AREA OFF IJEDE ROAD IKORODU.
LOCATION: FULLY DEVELOPED AREA
DESCRIPTION: FENCED AND VERY NEAR TO THE MAIN ROAD
DOCUMENT: PURCHASE RECEIPT,SURVEY, LAND INFORMATION CERTIFICATE (DESIGNATED AS RESIDENTIAL AREA)
ADVANTAGES: WELL DELINEATED LOCATION, GOOD LAYOUT, NEARNESS TO MAJOR ROAD, PROCESSING OF C OF O WOUT HASSTLES, NEW AND MODERN HOUSES ARROUND,ELECTRICITY,LIVEABLE AREA WITH GOOD SECURITY ARRANGEMENT.
ASKING PRICE: 4 MILLION
CONTACT 08023142108,08183776023, 07058351027,07065198562 OR EMAIL ABIDOYVENTURES@GMAIL.COM
PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 12:33pm On Sep 10, 2012
bran1: I'm impressed with your work. Can one achieve 4 terrace flats with the sitting room and dining, kitchen-store and visitors toilet downstairs and 3bedroom upstairs with 1 room ensuit I.e 2toilet 2baths upstairs. The house will have a double gate. Diff entrance for each of the 2 flats with parking space by d side. Can this be achieved on a plot of land and what will be the estimate assuming we you this ur same design.
A plot of land on a corner piece or a plot of land with its longer lenght facing the access road can best achieve your brief, but our own design in this case is 4 flats of 3-bedrms it can not be adopted for 4 unit of terrace duplex, but possibly the facades and the exterior view may be adopted. In order to come up with cost drawings are very important and also knowing the location. Thanks for your intrest.
PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 8:39pm On Sep 09, 2012
bajugbajug: @aventures. Pls where does d parapet projection sits on? Directly on beam or column? Pls educate me more or better stil let's av d pix of d parapet casting
I will try and get some pics of the production if i can cos i lost some pictures. This type of parapet is precast with majorly with pure cement and some fine and sharp sand.In the process of casting 10mm reinforceent is used to reinforced it. It is usually produce at lenght of 6ft, so about 6 holes thatcan allow 10mm rod to go thru is bored durind casting for the purpose of hanging. Then the pre cast is allowed to get dried for like 3 days before hanging. The bottom line is set along the roof beam, and short piece of 2 x 3 wood is nailed round in other to support the parapet. The parapet is paced on the wood piece and fastened with binding wire, when this is done the proper setting and pluming is done. There after 10mm short piece of is driven thru the holes on the parapet into the roof beam or roof blocks filled solid, after this a very cement rich mortar is poured btw the parapet and the roof beam. Finaly, the joints are closed with pure cement dressing and the angles too are formed same way. i will post a pix of another 2 bldgs we just did.
PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 11:44pm On Sep 08, 2012
You are welcome sir. Hoping to hearing from you.
PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 2:23pm On Sep 08, 2012
We do not av a regular shape here the land is somehow skewed in shape and the dimension is 32.4m x 21m. But this structure will fit in perfectly also into a regular full plot of 36.6 x 18. 3 m .
PropertiesRe: Structural Designs,project Management And Building/Civil Construction by Aventures(op): 8:33pm On Sep 06, 2012
euromilion: @Venture

Thnx bro 4 all d good work u re doin here,I will renegotiate as u said.bros is there any negative effect if we mix gravel and granite together for pillars and lintel.my engineer is suggesting that we mix them to cut cost.what do u think?ur opinion is highly valued.cheers
'
Segcymore has given us a good idea here. just to butress his point. If your engr is going to use beams adequately in your decking then use grave for your lintels and to even further save cost he should not do a ring lintel i:e lintel will not connect each other and pillars it will only span accros the windows or doors only. cheers.
PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 8:25pm On Sep 06, 2012
greenlilly: Aventures pls i want to know if the house u are constructing is 3bedroom 4 flat and also what is the dimension of the house? To the whole house pls i want to know the current price of 4*6, 4*4 sub frame casement window.Thank you all and God bless.
THis house is 3 bedroom four flats. The overall dimension is 25m x 15m. As per the price of sub frame i will ask my aluminium fabricator and get back to you.
PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 7:34pm On Sep 05, 2012
POP work ongoing internally. pix below shows the material on site for the job.

PropertiesRe: Structural Designs,project Management And Building/Civil Construction by Aventures(op): 7:14pm On Sep 05, 2012
euromilion: @house

please guys Kindly advice me on cost of labour my project is now upto lintel,am about to cast 40 pillars and linted round,
my engineer is charging me 150k,capenter 120k,iron bender 60k,in ikotun lagos.I think these prices are expensive,pls advice
on what is reasonable needed.am buying all materials.

cheers
The volume of work here could not be ascertained, except for the pillars u said 40 in nrs. Well i am sure u can still get a better deal if u intensify on negotiating down. Casting labour= 80K, Canpentry 80K, iron bender for 60K is Ok.
PropertiesRe: Structural Designs,project Management And Building/Civil Construction by Aventures(op): 8:40pm On Sep 03, 2012
smiley
PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 12:56pm On Sep 03, 2012
@KKonsult, segcymore and mannimood. Tanx i am so grateful
PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 8:11pm On Sep 02, 2012
sir in all ways granite is far better than gravel. Washed gravel is better but granite is still d best because it gives your concrete good snd desirable crush strength required for you structural members such as beam, pillars and slabs. The earth particles in the gravel attacks the reinforcement and corrodes it, but gravel can be used in some cases such as blinding, german floor, lean concrete (to fill the hollow of blocks) compound flooring etc. Washed gravel can as well give us a desireable strength but the truth is that it is not economical, the process is tedious and cumbersome. No company producess washed grave this day you processed by your self. first and foremost you will buy the gravel prepare a surface concrete tank fill it with water then get a sieve load it with gravel lower it into d water and start shaking it so that the water can washed away the earth attached to the gravel stones away. To get a 30 Tons of washed gravel you may need to buy 4 to 5 trips of 10 tons gravel ( in my area now 10 tons grave cost 40,000) so buying 4 of 10 tons of gravel will cost 160k less labour to wash it. While you can get a 30 tons load of granite for 135K or less. So the choice is yours. Granite or gravel?
PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 8:26pm On Sep 01, 2012
smiley
PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 3:25pm On Aug 31, 2012
plastering pix

PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 6:05pm On Aug 30, 2012
More pix of plastering to come.
PropertiesRe: Building A Luxury Block Of Flats: Day-to-day Updates (with pictures) by Aventures(m): 7:43pm On Aug 29, 2012
I am sure i am going to be attacked by some people for be blunt whenever i see things not comforming to engineering standard. The builder/engineer in charge of this project is taking a great chance which is absolutely not acceptable this day because of incesant collapse now are partly due to chances some people took years back. Now my observation as an a trained structural engineer on this project is that the engineer/builder/contractor as the case may be is using a wall load bearing method in building a storey building, the implication in this case is the building load is majorly borne by the block wall, meanwhile the blocks we have this days do not pass the strenght test of blocks we can use for such a method. another implication in this case is that the columns are directly protuding into the slab this can result in what we called a punching shear. Though this method is cheaper but to reduce the chances, the builder here should have introduce some beams at some critical point and also engage well qualified iron bender and fixers cos waht i saw is far from a good job. I am not really out to criticise but please let learnt hw to enlightened our clients, if there budget can build bungalow let them build it and have rst of mind rather than trying to save cost at the expense of structural stability and safety.
PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 7:04pm On Aug 29, 2012
Due to the typographycal erro in the cost breakdown i posted previously,i deemed it fit to correct the error and repost.
COST BREAK DOWN FROM FOUNDATION TO DATE
FOUNDATION 2,800,000.00
GROUND FLOOR COLUMNS 450,000.00
FIRST FLOOR SLAB (Decking) 3,400,000.00
FIRST FLOOR COLUMN 265,000.00
BLOCK WORK (GRD & UPPER FLOOR) 2,650,000.00
LINTEL, ROOF BEAMS, ROOF TANK SLAB 760,000.00
PARAPET/CONCRETE FASCIAL (PRECAST) 450,000.00
BAMBOO DOUBLE LEG SCAFOLD 150,000.00
ROOF WOOD & NOGGINS 850,000.00
ALUMINIUM ROOF COVERING (TOWER PRODUCT) 1,193,000.00
ELECTRICAL FIRST FIX & DISTRIBUTION BOARDS 550,000.00
PLUMBING FIRST FIX 450,000.00
AC CONDUITS AND GAS PIPE CONDUITS 325,000.00
ALUMINIUM WINDOWS 1,150,000.00
FENCE, PILLARS, COPING & GATE HOUSE 1,100,000.00
IRON GATES (2 NRS) 300,000.00
BURGLARY 450,000.00
ARTWORK AND DESIGNS 350,000.00
BUILDING AND FENCE PLASTERING 1,950,000.00
SEPTIC TANK AND SOAK AWAY (2NRS) 850,000.00
SUM TO DATE 20,443,000

[
PropertiesRe: 3 Bedroom Bungalow fenced with gates For Sale! with Pics by Aventures(op): 3:32pm On Aug 29, 2012
Still on
PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 9:53am On Aug 28, 2012
U are welcome!
PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 10:35pm On Aug 27, 2012
I really appreciate u all 4 dis wonderfull observation. It was a typographical error, the 265K was meant for the first floor columns. While d decking actually gulp 3.4m. I will correct the post by 2moro. @ segcy more tanx 4 pulling my legs LOL as a matter of fact u assisted me in vetting dis decking wrk in question and u we were also 2gether on d casting and so u kno d fact abt dis figure tanx so much any way.
PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 7:01pm On Aug 27, 2012
pics of some plastered area in the interior

PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 11:37am On Aug 27, 2012
08053383877 Mr Sunday. Just tell him frm Engr. Niyi.
PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 9:46pm On Aug 26, 2012
@MANINMOOD I AM GIVING THIS EXPENDITURE UP TO DATE BASE ON UR REQUEST. THIS EXPENDITURE IS INCLUSIVE OF MATERIAL, LABOUR & LOGISTIC BUT IS EXCLUSIVE OF OMO ONILE'S PAYMENTS ESTATE DUES AND CHARGES AND SUPERVISION FEES. TO WHOM IT MAY CONCERN I WILL APPRECIATE A CONSTRUCTIVE CRITICISM. I AM NOT IMPOSING THIS COST ON ANY BODY NEITHER AM I ESTABLISHING THAT THIS IS WHAT YOU MUST ALSO INCURE ON UR OWN PROJECT AS WE KNOW THAT SEVERAL FACTORS MAY AFFECT PROJECT COST SUCH AS CLIENT TASTE OF QUALITY, LOCATION, SOIL CONDITION, AVAILABILITY OF MATERIAL, ETC. AS A MATTER OF FACT MY CLIENT IN THIS CASE REQUIRE A VERY HIGH INTEGRITY BUILDING AND CLASSY FINISHING AND THAT IS WHY WE EMBARK ON FRAMED STRUCTURE METHOD.
FIND BELOW:
COST BREAK DOWN FROM FOUNDATION TO DATE
FOUNDATION 2,800,000.00
GROUND FLOOR COLUMNS 450,000.00
FIRST FLOOR SLAB (Decking) 265,000.00
BLOCK WORK (GRD & UPPER FLOOR) 2,650,000.00
LINTEL, ROOF BEAMS, ROOF TANK SLAB 760,000.00
PARAPET/CONCRETE FASCIAL (PRECAST) 450,000.00
BAMBOO DOUBLE LEG SCAFOLD 150,000.00
ROOF WOOD & NOGGINS 850,000.00
ALUMINIUM ROOF COVERING (TOWER PRODUCT) 1,193,000.00
ELECTRICAL FIRST FIX & DISTRIBUTION BOARDS 550,000.00
PLUMBING FIRST FIX 450,000.00
AC CONDUITS AND GAS PIPE CONDUITS 325,000.00
ALUMINIUM WINDOWS 1,150,000.00
FENCE, PILLARS, COPING & GATE HOUSE 1,100,000.00
IRON GATES (2 NRS) 300,000.00
BURGLARY 450,000.00
ARTWORK AND DESIGNS 350,000.00
BUILDING AND FENCE PLASTERING 1,950,000.00
SEPTIC TANK AND SOAK AWAY (2NRS) 850,000.00
SUM TO DATE 17,043,000.00.
PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 1:54pm On Aug 26, 2012
Yes thereis mosquito nettings, and it comes along with the fabricated aluminium casement window. The window was instaled before plastering while the burglary was insatalled after plastering. The pix below shows some window with d window and moosquito net and d burglary fixed.

PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 5:18am On Aug 26, 2012
The buglary will be fixed inside, i will post the pics in my next picture posting.
PropertiesRe: Building A 5 Bedroom Duplex In Ebonyi State by Aventures(m): 10:15pm On Aug 25, 2012
@Jussi, i am sorry if my response seems confrontational. The topic in question is my area of intrest and it is calld engrg science. So i just tot i shld share my knowledge for purpose of learning. No man is island of knowledge, i am also learning frm spyder880 most especially in d area of cost mgt wout compromising standard. @spyder880 and cultured tanx for understanding.
PropertiesRe: Building A 5 Bedroom Duplex In Ebonyi State by Aventures(m): 6:59pm On Aug 25, 2012
When iron is hard to cut doesnt make it imported or a good iron because such iron lacks melleability and elasticity property. Such iron is brittle and have been attributed to sudden collapse. The essence of reinforcement in concrete is to give it some elasticity nature and resist tensional stress. The no 1 option of knowing a quality iron is by conducting a lab test d strenght of imported iron is up to 460KN while some local may be up to 400KN. Meanwhile 4 physical identificatn we check d lenght, diameter, producer's mark, melleability. Imported iron are slighly brownish in colour, 12m in lenght, accurate diameter, easy to bend, the faces often painted to protect them from rusting while on sea and finally d twist on it are finer and regular