The standard and volume of the septic tank is often determined by the Architect. This is a function of the proposed/expected number of the occupant of the building in question. Not even all that claimed to be architect are architect indeed most of them are draughstman an they lack the science behind building design. Meanwhile baffle wall is often condemn by most untrained builder since they do not know the function. The baffle wall serves a purpose of ensuring that fresh faeces does not flow to the soak away tank. it also ensures that only water flows to the soak away. The technology behind thebaffle wall is that it partitions the septic tank into two leaving some spaces underneath and above. When the waste come in fresh it floats on the entry side of the tank and the baffle wall does not allow it to flow to the other side where it can gain access to the soak away. The fresh waste will be there untill it decomposes. when it decomposes it becomes heavier and it settles down at the bottom of the tank, then the water without any fresh or decompose particle flows into the soak away. Another advantage of the baffle wall is that the tank can stay several yrs without before getting filled up.Attached here is a rough sketch of septic tank with baffle wall arangement. for further assistance kindly contact abidoyventures@gmail.com |
![]() |
great day |
wacthout for power point of building a 4 flat from the scratch, cost and challenges highlighted backed up wt pictures. |
Blessed be the Lord |
I know not much abt what u re asking but let me yarn some nonsense may be it can make some sense. Buy off plan simply means buying into a dream or a vision of an estate developer it could be a house or a servicecable plot in an estate. Hw does this work? An estate developer will acquire a large expanse of land go thru all omoonile whahala(pay them off outrightly and tie their hand well in black and white, so that no coming back to ask for fdn, decking or roofing money). The developer do the survey, ractification (if need be) and get a global CofO for the entire land mass and also engage a registered Townplannig consultant to prepare the approvable estate layout (not every layout are approvable)in other to get town planning approval. When the first huddle previously mentioned is sorted out then the services of Sound architect,QS, Engineers with estate planningg and managemnet knowlege to designs house, roads, drains, recreation centre, service area and other luxury amenities as you will want (this design stage is important because the name of the estate and the design must correlate for instance a typical example of a Garden Estate is VGC while there are so may estate this days XYZ garden estate and is far from what a garden estate shld be).When the design stage is completed, then the next stage is costing. At this stage the developer engages a cost consultant to put up a cost for facillity development such as road,fence, drains,electrification, water supply, seweage system, beautification, gate house, security post etc. Now what does the developer does wt the cost?. He adds the cost of land and documentation + facility development + profit/nos of plots available for sale= selling price. How does he sells he prepares a rendered, colourful, and attractive 3-D view of the proposed estate, produce flyers showing this estate looking as if already available, raaaddio gingles , use of marketing officers to get people to buy. Buyers beware for more info contact abidoyventures@gmail.com |
Great day[quote author=Aventures][/quote]Great day |
Still available for your service |
![]() |
Happy New Month, Happy new services |
Great service |
Great services awaits you as u patronise us |
![]() |
still at ur service |
![]() |
Great Kudos to Governor Fash! this is wonderfull as a matter of fact i was at this site about a year ago tto take a level for theroad to be constructed from the link rd btw Imota and Gberigbe in Ijede Area to the main entrance of this industry Gate, the only structure standing was just fence running across some perimeter of the land and the rest was a thick forest, and this is so surprising to see a wonderful transformation within a yr. Meanwhile this was an abandon project by the federal govt since's 70's. FASHOLA FOR PRESIDENT!!! |
At ur service |
cheers |
@ ASSOG. pls kindly review your estimate. I am sorry to say this it is not just professional and besides you cant even get 1 ton of 8mm for 110,000 not to talk of 12mm. a ton of 12 mm now is within 148,000 to 150,000. also you want to use 3000 blocks for 5 b/rm duplex! Moreover the finishing cos of a duplex is 5M+? Infact a moderate and reasonable 3 B/rm bungalow will cost as much as that. Let's be professional and not be greedy. This kind of estimate is like a bait to unsuspecting client who will think he has got a good deal and will find himself to blame along the line. This guy is at planning stage and he is seeking for advice, if at this point he gets a true pictures of what he is going to spend then he would be able to take a reasonable decision either to go on or change his plan. |
![]() |
still available |
Good Day to you all |
![]() |
Great services at your disposal. |
Trial will convinve U |
![]() |
Good day |
still on |
Happy Sunday |
![]() |
We are still at ur service. |
Awaiting ur kind patronage |
1 2 3 4 5 6 7 8 ... 36 37 38 39 40 41 42 43 44 (of 60 pages)