Pic Update
|
Demain_man: ^^^^@Brabus, Thanks. Can you help me with the second question on the parapet pls?. I have been thinking that there should be a cheaper way of achieving that same look instead of using concrete as is currently done. I think the extra load that the concrete puts on the house is quite unnecessary.What's the question again |
Casting of the ground beam completed. Lets go filling |
Demain_man: Another question please, How many bags of cement would you estimate for a 6-rooms duplex? Just a very rough estimate will do.700 bags of cement will do the shell. |
Happening Now!
|
Demain_man: Hi Brabus, is the 600 bags of cement just for casting of the founddation or for building the whole house? Thanks in advance for your reply.It's for the whole project. We'll get more as the need arises. |
Jamesqu: I like the touch of professionalism with the coveralls and safety gears, well done.__________ Size of the proposed building The built-up area is occupying 17 x 17.2m. We had to scale down the house to meet statutory limit. We have 6m setback to the drainage in the front, 3m to the back, 6.2m to the building on the right and 5.3m to the building on the left. __________ Contract Sum/Expected Completion Date The contract sum for this project is N16m (Foundation - Roofing). And the expected completion date is May 1st, 2013. __________ Rough-in Plumbing The rough-in plumbing work is akin to raft when you decide to go conduit. It is the installation of water/waste/vent prior to the concreting or closure of walls. |
Your house is coming out very nice! Good job. |
Eurolux - quality door, good price!
|
Re-branding NextHome The current economic climate is tough for many businesses in the construction industry. Achieving growth and acquiring new business opportunities is increasingly challenging, as the industry is becoming more competitive. In order to stand out, we thought it right to focus on our brand and remind prospects and clients why we're ‘the right man for the job.’
|
What We Achieved In 8 days
|
Now the day is OVER! We're cleared for casting. 600 bags of Cement (Dangote) were delivered today for this project. The plumber has also completed the rough-in works Final checks and inspection has been concluded. We'll be casting the ground beam tomorrow. |
Filling the void
|
Ready for casting! We've completed the assembly of the reinforcement which was done on top of the Formwork and it has been lowered into its final position inside the Formwork. Due to the pressure of the concrete, the carpenters are bracing the formwork in order to prevent opening of the formwork. On Monday 4th, we'll be doing the rough-in pipe works and conducting final checks/inspection. No picture update today. |
Reinforcement
|
Today in picture
|
Limitless_13: Hello Brabus,Thanks for your time on this thread and we sincerely appreciate your call. ___________ Typical Cost of Architectural Drawing A typical architectural drawing should for the proposed design should be around N120,000 - N150,000 You can speak to our guys at MastersTouch Studio (Phillips - 08024282676) ___________ Cost of Raft Foundation I'll need your drawings (Structural and Architectural). A physical assessment of the site would also be required. ___________ Do's 1. Do it right the first time! Take note of the things that's should be quality upfront. Don'ts 1. Do not assume! Speak to the professionals. ____________ Project Cost (Guess-timate) A typical block of flat in Awoyaya area cost around N18,000,000 (Basic Finish). |
And this
|
Filling Works
|
segcy.moor:Hmm |
Building up the excitement! As expected, construction site generates a lot of curiosity. Neighbors, friends and estate managers want to know about the new house coming up on the street, we too wanted to promote our business with appealing construction site signage.
|
Today's Weather according to Yahoo!
|
We're Building Again! If you've been following this thread closely, you're likely aware of our progress at Diamond Estate, off NTDA road, Sangotedo, Lagos - New CONSTRUCTION signs keep popping up and we are under construction again! I'm happy to report that our newest project broke ground last week and the shell will be ready for delivery on May Day. Keep up with our progresses on this project. Follow us here.
|
Formwork
|
From the Construction Site
|
oakhill: Where is the land located?The land is located at Diamond Estate, along NTDA road, Sangotedo, Lekki/Epe Expressway, Lagos. |
Setting Out Today officially mark the commencement of construction activities at the site after we've tidied up approvals and other issues with the Estate Management. Earlier today, we setup the position of the building to be constructed and confirm the setback/clearances of the building to the boundary lines. |
The Land
|
3D Rendering from MTS
|
We're Building Again! Once again, we are proud to announce we are building a house! This time ~ it is a multi-family home (4 bedroom semi-detached duplex) Project Detail Main Contractor/Builder: NextHome Builders Design/Architecture: MastersTouch Studios When we began our small construction business, we had no idea just how much it would grow over the next decade. Through continued education in the construction industry, a phenomenal team and the support of family and friends (especially Nairalanders), we have moved on!Pics: As built pics
|
It has been a while since my last update on this thread the project is moving according to schedule and a lot have happened lately. We've poured the ground beam and right now we are sand filling the foundation. Pictures to be updated soon. |