Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 5:35am On Jun 12, 2016 |
The materials needed for the parapet cast has arrived, roofing wood is already here waiting... and the operator is getting ready for the final cast.
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 5:15am On Jun 12, 2016 |
More pictures...
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 10:22pm On Jun 11, 2016 |
Iron fitters... rounding off
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 9:11pm On Jun 09, 2016 |
Rod fitters doing a touch...
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 9:45pm On Jun 08, 2016 |
Lintels 
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 9:40pm On Jun 08, 2016*. Modified: 7:14am On Jun 10, 2016 |
Rounding off the block work.
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 9:25pm On Jun 08, 2016 |
spyder880: Very good and neat work. Keep it up. Thank you sir |
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 1:26am On Jun 08, 2016 |
More...
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 1:17am On Jun 08, 2016 |
Block work ongoing...
|
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 2:24am On Jun 06, 2016 |
More...
|
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 11:22pm On Jun 05, 2016 |
Fixing parapet slabs on going...
|
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 11:12pm On Jun 05, 2016 |
Thank God so far, almost done...
|
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 9:26pm On Jun 05, 2016 |
Having prepared the supporting beams we have to kick off...
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 5:39am On Jun 05, 2016*. Modified: 2:11am On Jun 06, 2016 |
I will like to state the Materials used to achieve every stage, starting with this stage and the workers pay. However, my service and hired Woking tools will not be inclusive here.
1)Blocks : 1300 pcs of 9" holed 2)Cement: 163 bags of cement 3) 16mm rod: 27lenghts 4) 12mm rod : 25 lgt 5) 8mm : 15 lgt 6) 1 roll of binding wire. (still remaining) 7) 1/2" Hardcore stone: 2 trips 8 ) Gravel : 5 trips 9) Sharp sand : 22 trips 10) Planks : 29 pcs 11) Poline : 30 pcs 12) 1/2 bag of nail and 4P/weight(still remaining) 13) Thick Nylon: 2roll of 7kg & a roll of 10kg 14) 4" blue pipe 4lgt, 2"- 4lgt, 3" 4lgt.
Workers pay: #325,473.00 only. (excluding Engineer's & plumber's )
Thank you for following... please follow us as the 1st form block work after dpc kicks off on Monday, thank you. Do Have peaceful weekend. (Questions are expected)
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 4:57am On Jun 05, 2016*. Modified: 9:06pm On Jun 05, 2016 |
I suppose many would like to know how much that was spent and the materials used for the project at the very stage.
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 7:51pm On Jun 04, 2016 |
Here
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 5:41pm On Jun 04, 2016 |
DPC couldn't wait!
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 10:13pm On Jun 02, 2016 |
Damp control measure now built without lump stone due to height...
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 9:53pm On Jun 02, 2016 |
Sand Re-filling and Compacting manually... already concluded
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 2:33pm On Jun 01, 2016 |
Candour: what an ambitious project!!
Another good place to come receive inspiration and morale
weldone engineer  welcome sir |
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 9:14pm On May 31, 2016*. Modified: 11:09pm On Jun 01, 2016 |
The concrete in there for the blinding is a mixture of moderate standard 8 pans of sharp sand, 8pans of neat gravel and 4 pans of 1/2" stone (hard core) to make a bed for the 4" spaced 12mm basket... hereafter comes a straight pillar made of 16mm rod with ring size of 8mm rod 10" intermediate spacing. Then concrete cast comes on the basket up to 1foot 3" thickness. The block forming usually takes more time because there is no much space in there.
The centre hole where the pillar is elected have to filled with a good watery concrete.... See pics
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 8:44pm On May 31, 2016*. Modified: 9:41pm On May 31, 2016 |
Here is the Making of the front external pillars in details.
Depth : 1.21m
Breadth : 1m squared
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 7:39pm On May 31, 2016*. Modified: 9:39pm On May 31, 2016 |
Managed 2 tanker load for the exercise
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 7:30pm On May 31, 2016 |
It's effect
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 5:10pm On May 31, 2016 |
More on watering the foundation / settling the soil of the foundation
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 5:05pm On May 31, 2016 |
Good job boys we are done with sand filling, levelling and watering same time ... It took 130 tons of sharp sand.
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 4:54pm On May 31, 2016 |
johnson232: okay sir pls do update me when u complete the filling. alright sir that will be very soon |
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 3:52pm On May 31, 2016*. Modified: 4:31pm On May 31, 2016 |
EgunMogaji: Yes, there's a structural drawing. Ok, then Follow its details, the alphabetical and numerical details are highly important to achieve the foundation brace stud which is also important because without it sudden intense pressure will burst open the the foundation wall that is affected. Very important* |
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 12:12pm On May 31, 2016*. Modified: 4:07am On Jul 10, 2016 |
EgunMogaji: Mine took 460 tons of laterite. Well, I paid for 460 tons of laterite anyways 
I was lambasted for not introducing a middle brace on mine. I see that you didn't also, is there a reason?
You have a good looking foundation there, shows artisans with a good eye for detail. If they go to this level on below ground stuff, I can't wait to see what they'll do above ground. Thank you sir, Sorry to ask if you have structural drawing of the building? that would have been a guide for the foundation and it's brace panels. Anyway Yes this foundation has brace panels stud as the structural drawing implys |
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 9:44am On May 31, 2016 |
johnson232: neat job i must say sir... how many trips or tons did u use for the sand filling? Thank you sir, 10tons X 10 times but ordered for more because is not enough. I will total the tons when am done filling. |
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 8:05pm On May 30, 2016 |
Hey! Move it! No time!!!
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 7:50pm On May 30, 2016 |
Still on sand work/ damp control
|