Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 7:48pm On May 30, 2016 |
Still on Sand filling stage
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 12:19pm On May 30, 2016 |
sand filling
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 12:08pm On May 30, 2016*. Modified: 7:53pm On May 30, 2016 |
Guess how many trips of sand needed for this filling 
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 9:20pm On May 26, 2016 |
More on foundation
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 9:09pm On May 26, 2016 |
If the foundation is faulty... what shall the landlord do We intentionally took our time on this foundation to achieve our clients satisfaction. Here is the column base for the external front pillars and more...
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 9:15pm On May 24, 2016 |
Making of other walls... taking time to define the foundation practically because this is the most important aspect of building.
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 8:19pm On May 23, 2016 |
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 8:07pm On May 23, 2016 |
See more
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 7:59pm On May 23, 2016 |
Making of other partition.
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 8:11pm On May 22, 2016*. Modified: 6:08am On May 23, 2016 |
This foundation have to be very high... up to 6 coaches (block) from the concrete blind and should take a little height higher than the gate level, like 600m above. Considering that flood enters the compound from the street each time is raining. In other to achieve our purpose that is the way out. Happy weekend fellow nairalanders. Thank you for following us this far.
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 8:28am On May 22, 2016 |
The newly excavated area was not possible before because of space to dump excavated sand as we build up the walls of the other sides that are ready, we back fill and have space to dump sand of the new excavating partitions.
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 8:18am On May 22, 2016 |
spyder880: I love this, good job engineer. Thank you sir |
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 9:38pm On May 21, 2016 |
Now you have to follow carefully...
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 11:40am On May 21, 2016 |
A very good high foundation needed in here because of the sloppy nature of the land, flood control measure must be observed. Take a look at this
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 7:02pm On May 20, 2016 |
See more
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 5:36pm On May 20, 2016 |
Now the block grows
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 5:32pm On May 20, 2016 |
More pics
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 11:31am On May 20, 2016 |
Form work on going...
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 1:34am On May 20, 2016 |
Block form work stage one in view. |
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 1:34am On May 20, 2016 |
See more on elected pillars...
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 9:59pm On May 19, 2016 |
salabscholar01: I love this... My job is roofing... contact me. Thanks Thank you, it's noted. |
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 3:19pm On May 19, 2016 |
See more pictures
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 3:16pm On May 19, 2016 |
Pillars should be correct and should be done by the Engineer himself, overseeing the superstructure aspect...
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 1:33pm On May 19, 2016*. Modified: 3:07pm On May 19, 2016 |
Preparing to elect the pillars... the superstructure aspect of the building should be done carefully. Meanwhile the material needed are coming in, there are Already on ground follow me...
|
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 5:14am On May 19, 2016 |
Still on the making of scaffold...
|
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 1:48am On May 19, 2016 |
See more
|
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 10:35pm On May 18, 2016*. Modified: 12:37am On May 30, 2016 |
to add beauty to the good job the architect has done and to balance up the beauty i made a little design by the right elevation though it incurs a cost but never mind all our clients deserves the best treat from us.
|
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 8:30pm On May 18, 2016 |
In preparation for the parapet / roofing
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 8:05am On May 17, 2016 |
More Pictures on the excavation
|
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 3:30am On May 17, 2016 |
richgang: How much do you think will build the house from ground to finish Thanks, it all depend on the kind of finishing the client want. Eg. If we use POP ceiling or screeded wall finishing the amount will not be the same suppose we use PVC ceiling or a normal plastered wall therefore it depends the level of finishing. |
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 9:44pm On May 16, 2016*. Modified: 10:57pm On May 16, 2016 |
Casting the POP parapet slab
|
Properties › Re: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by dubemcapital(op): 9:13pm On May 16, 2016 |
The heat is still on... No foundation steps good job boys
|