Properties › Re: From House To Home: Our Home Finish Diaries. by dubemcapital(m): 2:49pm On Nov 04, 2015 |
spyder880: We have bought another 1000 blocks and more cement to be used for the fence, all workers are active here,
POP ceiling Wall screeding Tilers Bricklayers for fence walls Plumber for outside pipe laying Welders for gates, burglary proof and tank stand Laborers for clearing the new lands
Work goes on.
Good job sir. |
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 12:47pm On Nov 02, 2015 |
Stiil on it
|
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 5:05am On Oct 28, 2015*. Modified: 11:34pm On Oct 28, 2015 |
20 men attack  to achieve 1day cast. we used granites (chippings) for the pillars and beams all through and local washed gravel and 1/2" stone for the the slab. ...Follow me pls
|
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 4:57am On Oct 28, 2015 |
First floor slab is done, block form work starts 48 hours after... particularly concerned about the mixture. Still counting...
|
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 6:02pm On Oct 26, 2015 |
twinskenny: this is a big job engr. weldone thank you, twinskenny |
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 11:09am On Oct 26, 2015 |
twinskenny: this is a big job engr. weldone Thank you, twinskenny |
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 10:36pm On Oct 25, 2015 |
shaibu123: @dubemcapital I send you an email no reply Thank you shaibu 123 I have replied you now. Sorry for the delay |
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 1:01pm On Oct 24, 2015 |
princechigzy: Learning From the masters is always a rare priveledge. Keep up the good work and God's speed on this project.
I am keenly following.
In-between, when I was involved in the construction works at the Lake-View estate behind Nike Lake Hotel, the Land wasn't water-logged as the case is in your site which is some meters away from Nike lake its self.
Thanks Thank you, I think is because that side is the hilly side of the environment but across the road before Nike lake hotels entrance is almost swamp |
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 5:23pm On Oct 23, 2015 |
Well done guys, we are through with the beams and pillars. By tomorrow God willing the slab will be done for the next stage. Our materials has gone way down, but trucks are on their way for more supply...
|
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 2:54pm On Oct 23, 2015*. Modified: 4:58pm On Oct 23, 2015 |
I dislike unnecessary expenses, as a matter of fact I refused to build an external step (man waka) for laborers to climb for the slab concrete cast (decken) Is better, safer and more liable to climb through the original planed stairs of the house. So we cast it instead of wood made external step (man waka) after which we faced the beam and pillars... follow me
|
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 2:26pm On Oct 23, 2015 |
spyder880: Safe and solid, very good work. Yes, for posterity sake... one hundred years guarantee at least Thank you oga spyder |
Properties › Re: From House To Home: Our Home Finish Diaries. by dubemcapital(m): 8:10am On Oct 20, 2015 |
Oga spyder GOOD JOB there, I love your taste |
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 7:40am On Oct 20, 2015 |
Yes, my men are here putting a touch to power. Electrical wiring is for professional only else "one may run like man and stop like a woman" My carpenter is as good as pregnant woman two days delay means a lot, his name is already out of my list. Let's carry the good smart head along.... Follow me!
|
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 4:17am On Oct 18, 2015 |
Workers must observe safety precautions... Site manager take note.
Mixing machine, romance or poker machine already ready for action as the structural iron fitter rounds off.
Electrical work won't be a problem I have experts that will do justice to the work in less than 48 hour.
|
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 4:29pm On Oct 16, 2015*. Modified: 4:48pm On Oct 16, 2015 |
update on the progress...
|
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 3:58pm On Oct 16, 2015 |
KolaShangOne: Good progress.. But having a 6 weeks target from foundation to finishing this house is a very very short time. It won't give you time to pay attention to details. I'm following keenly. As a matter of fact you are right, but i have crew that help in running the site to achieve our goal. eg. i have with me here my supervisor, site manager, foreman and my humble self together i believe we will get it done in the absence of financial delay. |
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 6:25am On Oct 14, 2015 |
First floor slab... plumber is done for this stage, woodwork preparation, iron fitter on duty... electrical installation technician arrives today from Lagos.
|
Properties › Re: From House To Home: Our Home Finish Diaries. by dubemcapital(m): 6:08am On Oct 13, 2015 |
spyder880: Updates on external designs and fixtures. ..... Hmmmm That's lovely Oga spyder good job! You have good wokers too, the cement pop is awesome |
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 7:55pm On Oct 09, 2015 |
Leveling in progress
|
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 7:38pm On Oct 09, 2015 |
Leveling... in progress
|
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 7:26pm On Oct 09, 2015 |
spyder880: Lovely, simply lovely. I just love the way you are making use of latest technology there. Good work. Thank you sir |
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 12:12pm On Oct 09, 2015 |
dubemcapital: In Enugu urban it is rear because of coal but places like 9th mile, Oji river, Udi, some part of Amechi and Akegbe ugwu. Places like 9th mile, Oji River, Udi, some part of Amaechi, Akegbe ugwu, nsukka, etc. It is achievable. But in Enugu city the possibility is lightly slim because of the coal deposit in many part of Enugu. {sorry, the previous answer was incomplete} |
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 7:51am On Oct 09, 2015 |
We need to move faster than this... Leveling loading.... I will import more faster and professional brick layers for the leveling. By 6pm today God willing, we maybe getting ready for first floor wood work for Concrete cast
|
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 11:03pm On Oct 07, 2015 |
bigfizh: Dubemcapital ,
sent to your mail box Capitalshelters@yahoo.com |
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 10:37pm On Oct 07, 2015 |
Lintel /pillar cast work loading...
|
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 10:16pm On Oct 07, 2015 |
bigfizh: Dubemcapital, thank you.
i will also like to know the following,
1, cost of laying foundation with German floor 2, cost of laying foundation, German floor, and raising blocks up to lintel level of the proposed 4 nos of 2 bed room flats ensuite storey building.
i will appreciate a breakdown summary of the cost from laying foundation, German flooring upto lintel level.
regards. Thank you sir, can you write me @ capitalshelters@yahoo.com |
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 10:12pm On Oct 07, 2015 |
KolaShangOne: Oga Spyder, don't mind Oga EgunMogaji.. He likes me and he likes to call me out.. I'm sure he's waiting for my next construction diary to come n bash me.
We were talking about his own house and expectations we had based on the bashings Egun has meted out to us in general. No one said its wrong to carry headpan o..
As we can see from d pic, he has basic equipments (concrete mixer, vibrator, level instrument etc) and that's all I expected (if not more) from the Egun himself.
Basically, according to building codes, we should remove vegetable matter and excavate top soil to about 100-150mm before building to avoid settling after vegetable matter has decomposed.
From the site pics, its just 1 or 2 grasses with shallow roots not like the one on Egun's site. I wish U a successful one @dubemcapital Thank you my bro, I think Oga Egun's is just catching fun Nevertheless, the vegetable is completely out of the proposed area of building. But they have an excavated work done earlier before I came. So that area is not inclusive in my foundation  |
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 12:30am On Oct 07, 2015 |
eyeview: Can someone please tell me if there's any where in enugu city where residents have access to water by borehole In Enugu urban it is rear because of coal but places like 9th mile, Oji river, Udi, some part of Amechi and Akegbe ugwu. |
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 12:25am On Oct 07, 2015 |
bigfizh: Dubemcapital pls wats the estimated cost of laying a foundation of a 4 flat storey building, 2 bed room each, (2 flat up and 2 down), nature of the land is okay(not damp) Regards. 1,158,000 will handle it with ease depending on the contractor or engineer you choose to use and his work pattern. Thank you |
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 10:14pm On Oct 06, 2015 |
Because of the kind of sharp sand in Enugu, I mix my mortar with mixing machine for result and accuracy. The iron structural fitters are already on ground getting lintel beem ready. The wood work materials needed for the 22 pillars and lintels has been ordered. Am sure by next tomorrow we must have conclude d the cast work.
|
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 9:04pm On Oct 06, 2015 |
Pchinak: Thanks. I sent you a mail on the email address I saw on your signature, you no reply. Sorry, I will do that right away |
Properties › Re: Building A 6bedroom Duplex In A Half Plot (waterlogged) @enugu by dubemcapital(op): 4:08pm On Oct 06, 2015 |
EgunMogaji: Good decision.
Doing the same but mine is to eek out the last possible space. That is inclusive  |