Week 30 Updates Steel Decking, Brick House Construction, Spiral Staircase, Roof Tank Slab Waterproofing/Felt Installation and more.
|
msogunro:Well done. I dey busy at my welding site doing my best on my newly found hobby. #NowAmAWelder |
Uberness:Welcome back. |
Sad. |
Why Boreholes Fail? by AWDROP The Association of Water well Drilling Rig Owners and Practitioners (Borehole Drillers Association) consists of companies and individuals engaged in well construction, test pumping, maintenance and rehabilitation. http://awdrop.org/uploads/3/4/4/7/34476634/why_borehole_drilling__construction_projects_fail_-_nwri.pdf |
msogunro:Interesting links for further reading on Boreholes in Nigeria. Borehole Drillers Association of Nigeria website http://bodan.com.ng Code of Practice for water well construction http://bodan.com.ng/images/downloads/code%20-of-practice-for-borehole-drilling.pdf |
44chux:Haba! I was just trying to find good use for my unlimited data plan. Do I rig or do boreholes? No! But experience as they say is the best teacher in life. Maybe by luck or twist of fate, I found myself in position of authority to talk on most subjects here. This is coming from a man (Brabus) who has worked with a federal govt board whose statutory function includes construction, operation and maintainance of dams, dykes, polders, wells, boreholes, irrigation and drainage systems in Nigeria; that drills over 800 solar powered boreholes a year in south west Nigeria communities and communicate directly with the Directors and not the locals. What else does Jack need to know about borehole and dams? |
kolnel:**smiles** No comment. |
44chux:Thanks. |
Also, Watch out for scare tactics and Federal govt format - we don dey hit sinkhole, water will soon disappear now We need to stop drilling. Ask them to continue until you reach the recommended depth even if it means drilling the earth into 2. ![]() - we've gotten good water now, we need to flush. They'll pump as much water into the ground for the day of commissioning - Buy 7 blade fan submersible pump for the commissioning. It pumps faster than single blade. Change to smaller pump after commissioning. - Check pressure. This is borehole. Uninterruptible water supply should be 100% guaranteed. No one should tell me that my over half a million naira borehole is recharging when 60k borehole elsewhere is working unperturbed. - what should enter into the ground is pipe, pump, rope and nothing more. There shouldn't be any valve attached. If there is, Ojoro (cheating) don enta be dat. The valve is installed there for a reason. Hmm! There's a lot more. Just the few that came to mind. I've done 3 boreholes on 3 different hilly sites. All infos shared here are first hand experience of what usually happens and where things do go wrong. The info above is meant only for people building on hilly sites and areas where getting good water is a big issue. It's not meant for people living in Lekki and other riverine areas. |
msogunro:From experience, regardless of who the rigger is: 1. I will pay only 30% of agreed total and balance on completion. Completion means after 6 hours non-stop pumping of water from the well. 2. I'll do my survey independently with a reputable lab that the driller also approve. Ibadan has lot of labs considering the institutions around. They'll give accurate datas. Most geophysical surveys are copy and paste. #fact. If in doubt, show us the process here and the lab name. 3. I'll do my negotiation based on the agreed depth. Buy the materials required, ask for the number of days required for the job, hire the equipment (I'm sure an operator will follow the equipment) and pay the driller per day. That way if anything goes wrong (which is always the case) after drilling to recommended depth, the lab will bear the consequence of providing inaccurate data. The most important equipment for the job is the air compressor. I'll look for the best around and not the old ones (that's what most riggers like to use). In Ibadan dialect, "Engine to ba wa l'owo mu n'iyen" You may need to ask your driller the following question: - What happens if we hit stone? Because you'll always hit stone when problem wants to start and most cases owner bears the extras. - What happens if installation exceed the number of days given? Who bears the extra cost of the equipment? If the driller agrees to 1 above, there's no need for all the other wahala. I'll just mobilize and come back to site when they're done. ________ To measure the depth is very easy, the rope used to drop the pumping machine is what you need to use. You'll definitely know when the rope is tight; mark it and measure the length. The cost of doing borehole in some terrain requires more attention than what's required for the main building itself. If you miss it once, you might end up not having water on your site because of the initial cost outlay and the risks involved. Many atimes, incorrect survey result messes up the whole job. |
gbadexy:If it'll take more than 3 years for weeds to sprout in a not-to-busy driveway, I think I already have a good solution. 3 years maintenance-free compound like Peugeot saloon cars. Good job all the way bro. Let me go back and read your post on Dulux vs Regal. |
I was at the welding shop again today. What was welded...? https://www.youtube.com/watch?v=OV7gJUZ-Pcg Goodbye to the traditional wood/iron/concrete deck. Welcome Steel/Board decking More updates on NextHomeBuilds
|
gbadexy:Good to know. For me, concrete floor using stone dust and sand or ceramic/brick driveway tiles will do. The ones put to test 40 months ago have never had any issue since installed. No weeding, no maintenance or repairs.
|
@ Gbadexy, any side effects (ground water contamination etc). |
allCopacetic:**smiles** The problem with Internet speed in Nigeria is the "Last Mile" design. Even if you're connected wrongly to a fibre optics network, you'll still complain. The Mainone "Feel The Impact" promo was setup to allow users have a real feel of broadband using a well designed network at The Palms. Most internet service providers have issues reaching their end users so Mainone setup the promo to show that the speed is there. Just get you freak on. The email sent to me is enough to pick up a fight if I get a restricted service from Smile. You know SLA was signed during the time i was getting the device and as a result they must deliver as promised. Baba, this is not they told me to tell you. I've managed backends before so I know what to expect (the thoroughputs) and how to get the right speed with the right equipment. It's still unlimited if it get the job done as at when needed without any tweak. |
@ allCopacetic, In 2011, this happened... Unlimited Broadband. 1.4TB was downloaded in just 20 days. For some of us, it's unlimited or nothing. Read it up here http://techbaron.com/free-super-broadband-the-palms-lekki/
|
allCopacetic:
|
msogunro:Just in case you might need this. The estimate for N11,500/m is from Davezo Nigeria Ltd. You can visit their website for more info http://davezonigltd.com |
msogunro:**smiles** This is one area I feel we are not doing it right here in Nigeria. Why must you be the only one to sink such a well while knowing the challenges and attend in cost of drilling in rocky sites? And more importantly, the risk. The country of many whys? Why must we buy antenna and dishes for every flat in our multi-dwell units? Why must we dig septic tanks in every house on the block even though we are well aware of central sewage system? Why must all flat have PHCN meter, generating set and even water heater? What happened to submetering which can work for all electricity sources? My recommendation to you will be to get someone who has done a working borehole in that axis before. This is one part of the build you cannot really afford to miss. Well done. |
How to do 1080p in Nigeria? 1. Netflix account 2. Smile Unlimited Data (N19,800) 3. Apple TV (3rd or 4th Gen). It's more fun with 4th Generation 4. A good high definition TV @ allCopacetic, there's little or no difference between 1080p and 1080i. The resolution is the same but your TV and the source will determine the difference. I don't really like to say this but the era of traditional TVs is fast coming to an end and this is not new at all. It has been with us for some time now. Any standard hotel runs IPTV/DTT solution. 99.9% of mixed use developments that I took part in Ikoyi runs the same. I know some are comfortable with the usual tradition though but things have changed over time since Mainone, Nigcomsat, and Glo1 came into the broadband market. I'll be looking at that in mixed use and multi-dwelling projects though. Remembering the days of Triple play service. Tenants don't have to buy anything, the contents (video, voice, Internet) are provided on demand to tenants in most of my projects back then. "Eleanora Gardens, Osborne", a good reference site. |
twinskenny:I think he's talking about HDMI over IP. One can extend good signal over 100m with such setup. This will be one of the cheapest way of getting 1080p without breaking bank. An all HDMI setup is very expensive. |
44chux:Can you share this with me? I'm presently looking at doing HDMI over Cat6 for 18 TVs over 40m length. Trying to change an AV multimedia system to HDMI for use with ProPresenter on my Mac system. It doesn't have to be here to avoid derailing the thread. You can share links to such interesting setup if you have. By the way, this can be integrated into smarthome network so I don't think you're derailing the thread if shared in details here. Thanks. |
msogunro:Based on the peculiarity of your site as seen on pics though, I'll suggest you speak to a reputable drilling company to carry out pre-drilling geophysical survey to establish groundwater level and depth to aquifer point. This will help determine the type of drilling and your final cost. The cost I received some years ago from a Pro-Driller is N11,500/m for drilling using percussion equipment, piping and other installation as required. _________ Pre-drilling geophysical survey result
|
Demainman1:All will be well. Sometimes, you won't really care much about the rip off but the recurring expenses spent on repairs. |
Demainman1:Was a good job delivered eventually? You really need to ascertain that. |
danowena:First set of pic is MDF while the last set of materials made to achieve a natural wood finish (moisture and weather friendly) |
Imported Wooden Doors
|
Parts of a wooden door.
|
The Locally made wooden door with wooden frame.
|
Great thread! Good discussion on doors. Well done @ WeldHome. Following with keen interest. Meanwhile, here are few doors from my archive. Subframes and installation pics
|
ice4u999:Don't know block rate. Daily pay is 3,500 for a bricklayer and 2,000 for labour. |