₦airaland Forum

Welcome, Guest: Register • Login • With Google • Trending • Recent • New

Stats: 3,344,289 members, 8,511,073 topics. Date: Saturday, 31 October 2026 at 06:01 PM

Toggle theme

Rotecch77's Posts

Nairaland Forum › Rotecch77's Profile › Rotecch77's Posts

1 2 3 4 5 6 7 8 ... 56 57 58 59 60 61 62 63 64 (of 332 pages)

Properties › Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 6:38pm On May 15, 2022
Installation of bathroom appliances is loading

We are using
Twyford water closet
Italian water heater
Indian and some England faucet/ shower

Properties › Re: Remodeling Of Old Duplex To Modern Type By Arbo Contractor Ltd ( Rotech77 by rotecch77(op): 6:32pm On May 15, 2022
We are done with the Fabrication of the Aluminum windows.
This new system( self contracting of the Aluminum) took us only 5days to delivered….. 34 nos of windows

Properties › Re: The Erecting journey of 2stories building of 12 flats by Arbo Contractor Ltd by rotecch77(op): 7:12am On May 15, 2022
Coming

Properties › Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 7:06am On May 15, 2022
More pics loading…
Properties › Re: Remodeling Of Old Duplex To Modern Type By Arbo Contractor Ltd ( Rotech77 by rotecch77(op): 7:06am On May 15, 2022
mufutau55:
Just go the better way that will give you peace of mind.
I have heard horror stories even with some of our aluminium window fabricators on the forum.
You must do your due deligence before getting involved with anyone.

Hajji M.
Yes rightly said sir
Properties › Re: Remodeling Of Old Duplex To Modern Type By Arbo Contractor Ltd ( Rotech77 by rotecch77(op): 6:08pm On May 14, 2022
dongc:
Fantastic....good job...
Thanks chief

Properties › Re: Remodeling Of Old Duplex To Modern Type By Arbo Contractor Ltd ( Rotech77 by rotecch77(op): 8:53am On May 14, 2022
dongc:
I totally understand you...way to go...now you have secured quality materials one problem solved...what about their work on site do they guarantee same quality?

Does doing this way put extra cost overhead? Where do you find the balance?
Good work on site is sure and you will have time to also monitor the process.
Also there is no extra cost added

Infact I’m relieved with this system.

————
I’m still battling with non supply of Aluminum widow since last year October which I contracted out fully to one Aluminum guy all in name of give out sub-contract…. You can’t believe he is well know person to me, now I need to dole out another 500k to complete the job, thanks God the project belong to family member if not
… what happened in 1477 will happed again

Properties › Re: Remodeling Of Old Duplex To Modern Type By Arbo Contractor Ltd ( Rotech77 by rotecch77(op): 3:16pm On May 13, 2022
jiday4:
A very good way to go, it will save time and your sanity
Yes, that is the way now
Properties › Re: The Erecting journey of 2stories building of 12 flats by Arbo Contractor Ltd by rotecch77(op): 9:03am On May 13, 2022
More update loading
Properties › Re: Remodeling Of Old Duplex To Modern Type By Arbo Contractor Ltd ( Rotech77 by rotecch77(op): 8:54am On May 13, 2022
dongc:
Curious ....why ?
It’s a long story about Aluminum guys, I’m just tired of there stories I.e non delivery of materials after payment, agreed on certain type of materials but immediately money change hand they will bring lower quality etc.
All these bounce back to my head as the contractor bcs I need to deliver good products to my clients
so I have changed my system of Contract with them now.
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 5:45pm On May 12, 2022
EgunMogaji2:
It's looking very sharp. Nothing beats wood doors for aesthetics.

Well done.
That is sir
When you meet with good fabricator with well seasoned wood then you stand out with good aesthetic result
Properties › Re: Remodeling Of Old Duplex To Modern Type By Arbo Contractor Ltd ( Rotech77 by rotecch77(op): 5:13pm On May 12, 2022
Aluminum window fabrication is going on at site.
———-
We have reason for this site fabrication
…you wanna know why ?
Stay tuned for more

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 4:48pm On May 12, 2022
Someone asked me some pages back to post the final pics of this project real hard wooden door we are using for the upper section entrance of this project
Here is the pics
Watch out for the final installation

https://www.nairaland.com/3092553/construction-6bd-contemporary-duplex-2bd/14#112765252

Properties › Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 4:42pm On May 12, 2022
rotecch77:
We are using best hard wood for 1st floor door frame .. full gauge size .. not those cheap hard wood you see out there.
-Well seasoned for about 3 months
-Full gauge size ..50mm *460mm thick
- No termite can play with the frame
- No wood effects can act on it

The frame only cost
Fabrication of the door leaf is going on

Properties › Re: The Erecting journey of 2stories building of 12 flats by Arbo Contractor Ltd by rotecch77(op): 4:40pm On May 12, 2022
Last floor loading

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 9:25pm On May 11, 2022
Minimalist green area sample

Properties › Re: Construction Diary Of 8units Of 2/3brds Flat Structure By ARBO CONTRACTOR LTD by rotecch77(op): 8:34pm On May 11, 2022
More update pics will be uploaded soon
Properties › Re: Remodeling Of Old Duplex To Modern Type By Arbo Contractor Ltd ( Rotech77 by rotecch77(op): 8:33pm On May 11, 2022
Aluminum Window fabrication is in progress

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 4:16pm On May 08, 2022
Minimalist burglar bar for this our ongoing project

Properties › Re: Remodeling Of Old Duplex To Modern Type By Arbo Contractor Ltd ( Rotech77 by rotecch77(op): 8:45pm On May 07, 2022
Watch out
Properties › Re: Construction Diary Of 8units Of 2/3brds Flat Structure By ARBO CONTRACTOR LTD by rotecch77(op): 8:43pm On May 07, 2022
Still on
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 8:40pm On May 07, 2022
Loading
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 2:55pm On May 07, 2022
topsy23:
If you have not seen the tank overflowing when the pump is working is because there is floating switch controlling the pump. It's automatic. When the water get to a certain level the floating switch cut off the supply to the switch to avoid over flow. And also when the level of water is low the floating switch send signal to the pump to transfer water to overhead tank.

The second question is very simple, when there is power supply definitely you will get pressure because for your pressure pump to work there must be a power supply, and when there is no power supply you will experience a low pressure in the building.
Remember pressure pump only works when there is water running either in the bathrooms, kitchen or external tap. It will only consume power when pump is working
Perfect answer..: bravo
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 11:37am On May 05, 2022
KolaShangOne:
Got quoted 60,000 for a 20-ton Mack Truck for Laterite in Ibadan today.

60,000 naira for 20-ton Laterite.

Crazy.
I beg no let me faint ……
It’s getting crazy already … this morning 30 tonnes granite to my site is 360k …12mm iron rod real tmt tiger 550k
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 11:33am On May 05, 2022
sleekender:
Hello House,

Please how can I remediate a Steel door with rotting wood panel?

Water is sipping into the house whenever it rains and I need a cost effective but permanent solution to it.
The problem here is 2 ( wet rot and water sipping into the house)
Solution
1. The door need to be replaced with real steel door or real hard wood door… all this Turkish door are not water friendly.
2. For the total elimination of the water sipping in ( their is a simple way to tile such wind direction area, this is where professional play in )
Once you read the direction of wind in rainy season n your area the best approach is to tile your entrance LOWER than the inner part of the building … actually there is a limit gauge to determine while doing this, NO amount of water can sip in when properly done in this manner.
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 10:46am On May 05, 2022
Plumbing and electrical piping work is loading
Watch out !

1 2 3 4 5 6 7 8 ... 56 57 58 59 60 61 62 63 64 (of 332 pages)