Properties › Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 7:49pm On Apr 17, 2022 |
mufutau55: Very nice ongoing finishing work as usual, Oga mi. Keep up the good work sir.
Hajji M. I really appreciated baba. We are pushing it sir |
Properties › Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 2:15pm On Apr 17, 2022 |
Very solid burglar bars
|
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 10:14pm On Apr 16, 2022 |
We are here to handle your construction project |
Properties › Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 7:27pm On Apr 16, 2022 |
All are Nigerian made quality tiles
|
Properties › Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 7:26pm On Apr 16, 2022 |
Tiling still in progress
|
Properties › Re: The Erecting journey of 2stories building of 12 flats by Arbo Contractor Ltd by rotecch77(op): 5:27pm On Apr 16, 2022 |
Arysexy: Can this enter in 100x50 land with parking Space?
Why are you using 12mm for this or you use it only for the slab? It will enter but you will not have enough space for parking We used 16mm for the columns and slab beams while 12mm for others works Thanks for your time here |
Properties › Re: The Erecting journey of 2stories building of 12 flats by Arbo Contractor Ltd by rotecch77(op): 5:25pm On Apr 16, 2022 |
Kongaone: Nice work. Please what is the size of the building area.
And what is the estimated cost of raising the building to the carcass level? The size is 120*60ft Cost 45m now |
Properties › Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 12:03pm On Apr 16, 2022 |
Arrival of burglar bar
|
Properties › Re: The Erecting journey of 2stories building of 12 flats by Arbo Contractor Ltd by rotecch77(op): 11:14am On Apr 16, 2022 |
Last floor loading loading
|
Properties › Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 11:12am On Apr 16, 2022 |
Tiling still in progress |
|
Properties › Re: Construction Diary Of 8units Of 2/3brds Flat Structure By ARBO CONTRACTOR LTD by rotecch77(op): 11:10am On Apr 16, 2022 |
Tiling, railing etc loading |
Properties › Re: Construction Diary Of 8units Of 2/3brds Flat Structure By ARBO CONTRACTOR LTD by rotecch77(op): 2:03pm On Apr 15, 2022 |
More pics Loading |
Properties › Re: Remodeling Of Old Duplex To Modern Type By Arbo Contractor Ltd ( Rotech77 by rotecch77(op): 2:02pm On Apr 15, 2022 |
Finishing loading …,, |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 3:52pm On Apr 14, 2022 |
n3xt: This is extreme! You’re a master in this game.
Well done. Thanks baba |
Properties › Re: Remodeling Of Old Duplex To Modern Type By Arbo Contractor Ltd ( Rotech77 by rotecch77(op): 10:49am On Apr 14, 2022 |
[quote author=mufutau55 post=111925779]I love the parapet design. Nicely done.
Hajji M.
Thanks so much sir |
Properties › Re: Finishings Of Portharcourt Gigantic House. by rotecch77(op): 9:38pm On Apr 13, 2022 |
We are here to handle your project |
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 9:35pm On Apr 13, 2022 |
More coming |
Properties › Re: Post your mechanical(plumbing)problem here and get quick solution to it . by rotecch77(op): 9:33pm On Apr 13, 2022 |
We are here to solve your plumbing issue |
Properties › Re: Remodeling Of Old Duplex To Modern Type By Arbo Contractor Ltd ( Rotech77 by rotecch77(op): 8:25pm On Apr 13, 2022 |
folmus: Welldone!! Thanks so much Chief |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 7:32pm On Apr 13, 2022 |
Aventures: Very sharp precast parapet. Weldone. Hope the integrity of this old structure was thoroughly checked before further loading. Longest time chief … o tii pee gan ni o Actually it’s cast-in-situ parapet but we use steel panel for it and the guy is good ( this reduce waste of wood, no plastering of the parapet after casting, it save time etc ) Yes the building was built about 9!year ago or so and all columns and beams are intact. Thanks so much sir. Here is another pics of the parapet just concluded in another project yesterday. Here we have Big modern bakery 14 lockup shop 5 units of mini flat ( 1 bdr 1 sittingroom , kit, toilet ) All in 30-120ft land
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 4:16pm On Apr 13, 2022 |
More
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 4:15pm On Apr 13, 2022 |
|
|
Properties › Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 7:47am On Apr 13, 2022 |
LordofNaija: This is the thread I he been looking for Thanks you are highly welcome here Thanks to those of you that cherished our work |
Properties › Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 7:06pm On Apr 12, 2022 |
Tiling still in progress
|
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 6:58pm On Apr 12, 2022 |
The main project of this thread is now at roofing stage Check the pics out
|
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 6:55pm On Apr 12, 2022 |
Watch out for more
|
Properties › Re: Remodeling Of Old Duplex To Modern Type By Arbo Contractor Ltd ( Rotech77 by rotecch77(op): 6:53pm On Apr 12, 2022 |
Electrical Mechanical ( plumbing) Aluminum window Roof gutter Plastering/ rendering Burglar bars Etc Loading….,,
Budget (Lagos island finishings grade ) I.e v. Island , lekki, ikoyi etc |
|
Properties › Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 10:53am On Apr 12, 2022 |
Temi1: Well done on this project so far. Its been an interesting journey. Please can you share more pics of the doors you are using. Here is the toilet door sample, we did this about 4year ago. It’s here on this thread ( for the back apartment) Now 60k, The entrance one is 300k I will post the pics once done.
|
Properties › Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 9:48pm On Apr 11, 2022 |
We are using this same door for the toilet, each door cost 60k minus installation It comes with -Door leave -Door key ( Turkish made) -Fame If you need cheap door don’t think of this
Pics of the door frame thickness
|