₦airaland Forum

Welcome, Guest: Register • Login • With Google • Trending • Recent • New

Stats: 3,344,274 members, 8,510,996 topics. Date: Saturday, 31 October 2026 at 03:11 PM

Toggle theme

Rotecch77's Posts

Nairaland Forum › Rotecch77's Profile › Rotecch77's Posts

1 2 3 4 5 6 7 8 ... 60 61 62 63 64 65 66 67 68 (of 332 pages)

Properties › Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 1:27pm On Apr 11, 2022
somehow:
Keep it up engineer.
Thanks so much sir, I really appreciated
Properties › Re: Remodeling Of Old Duplex To Modern Type By Arbo Contractor Ltd ( Rotech77 by rotecch77(op): 8:35am On Apr 11, 2022
Finishings with top notch handling loading
Properties › Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 8:19am On Apr 11, 2022
chairmanawe:
Following. Thank you sir for all the updates
Thanks chief.
We really appreciate your time here
Properties › Re: Construction Diary Of 8units Of 2/3brds Flat Structure By ARBO CONTRACTOR LTD by rotecch77(op): 6:44pm On Apr 10, 2022
We are contemplating which one to use out of these beautiful hand railings for this project.

-Full glass railings
-laser cut railings
Safety and durability also play a vital role here

Pics culled from internet

Properties › Re: Remodeling Of Old Duplex To Modern Type By Arbo Contractor Ltd ( Rotech77 by rotecch77(op): 6:41pm On Apr 10, 2022
More pics

Properties › Re: Remodeling Of Old Duplex To Modern Type By Arbo Contractor Ltd ( Rotech77 by rotecch77(op): 6:26pm On Apr 10, 2022
Still about it

Properties › Re: Remodeling Of Old Duplex To Modern Type By Arbo Contractor Ltd ( Rotech77 by rotecch77(op): 5:07am On Apr 10, 2022
Continuing on what we know how to do best

Properties › Re: Construction Diary Of 8units Of 2/3brds Flat Structure By ARBO CONTRACTOR LTD by rotecch77(op): 5:03am On Apr 10, 2022
450 bags of cement had already gone for this plastering, still counting
Properties › Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 4:40am On Apr 10, 2022
More update pics loading as we progresses
Properties › Re: Construction Diary Of 8units Of 2/3brds Flat Structure By ARBO CONTRACTOR LTD by rotecch77(op): 12:13pm On Apr 09, 2022
We are almost done with the Rendering
Properties › Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 6:47am On Apr 09, 2022
Ratio 2:1 for the tiling work
Properties › Re: Construction Diary Of 8units Of 2/3brds Flat Structure By ARBO CONTRACTOR LTD by rotecch77(op): 6:01pm On Apr 08, 2022
Update pics

Properties › Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op):
We care about our clients
We are making a special concrete kitchen cabinet in one of the kitchen here .

Budget ;150k
Material
6” block
Concrete slab( materials)
Packing case wood ( antic door design)

Attached pics culled from internet to back up our design

We have been doing it before but this will be a special one bcs of its features

Properties › Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 5:20pm On Apr 08, 2022
Tiling with carara wall tiles is in progress
Nigeria made tiles was approved for this project.

We are introducing wall permanent shelve on each bathroom

See attached pro-to type pics and ongoing one

Properties › Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op):
We are using best hard wood for 1st floor door frame .. full gauge size .. not those cheap hard wood you see out there.
-Well seasoned for about 3 months
-Full gauge size ..50mm *460mm thick
- No termite can play with the frame
- No wood effects can act on it

The frame only cost 25k

Properties › Re: Remodeling Of Old Duplex To Modern Type By Arbo Contractor Ltd ( Rotech77 by rotecch77(op): 12:20pm On Apr 08, 2022
More update pics continue

Properties › Re: Remodeling Of Old Duplex To Modern Type By Arbo Contractor Ltd ( Rotech77 by rotecch77(op): 7:34pm On Apr 07, 2022
More update pics

Properties › Re: Construction Diary Of 8units Of 2/3brds Flat Structure By ARBO CONTRACTOR LTD by rotecch77(op): 2:23pm On Apr 07, 2022
More pics

Properties › Re: Construction Diary Of 8units Of 2/3brds Flat Structure By ARBO CONTRACTOR LTD by rotecch77(op): 2:22pm On Apr 07, 2022
Pics only

Properties › Re: Construction Diary Of 8units Of 2/3brds Flat Structure By ARBO CONTRACTOR LTD by rotecch77(op): 2:21pm On Apr 07, 2022
Short journey about how it’s started

Properties › Re: Construction Diary Of 8units Of 2/3brds Flat Structure By ARBO CONTRACTOR LTD by rotecch77(op): 1:31pm On Apr 07, 2022
topsy23:
Good job weldone sir
Thanks chief

————
More update pics as the rendering is going on

Properties › Re: Construction Diary Of 8units Of 2/3brds Flat Structure By ARBO CONTRACTOR LTD by rotecch77(op): 9:27am On Apr 07, 2022
More pics

Properties › Re: Remodeling Of Old Duplex To Modern Type By Arbo Contractor Ltd ( Rotech77 by rotecch77(op):
More pics
We used steel panel to do the concrete facial ( popularly called parapet here)

Advantage over others method
- easier to achieve
- 98 pec perfect straight line sure to be achieved
- zero cost of plastering ( this does need plastering)
- No waste of wood , like traditional method
- It save time
- it save cost like 40pec to traditional plank method
- it save materials

Properties › Re: Remodeling Of Old Duplex To Modern Type By Arbo Contractor Ltd ( Rotech77 by rotecch77(op): 8:03pm On Apr 06, 2022
Progress update pics

Properties › Remodeling Of Old Duplex To Modern Type By Arbo Contractor Ltd ( Rotech77 by rotecch77(op): 6:47pm On Apr 06, 2022
We gives thanks to Almighty God, Our client, our followers for this new project.

Location: Lagos
Client; Nl member
Duration :30 days.
Cost:7,500 Dollars


We are remodeling this structure to modern type.
What we doing here as phase 1 of the project ( from initial stage we met it to roof covering)
1. re- design to meet client modern choice
2. Re-sizing of the rooms to become more spacious ( master bedroom to become Olympic size stadium)
3. Re-sizing of the kitchen to become 5 star hotel kitchen( burj d kalifar hotel comes to mind here)
4. Reshaping of the approach view of the building
And many more.

Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 5:21pm On Apr 05, 2022
Progress pics

Properties › Re: Construction Diary Of 8units Of 2/3brds Flat Structure By ARBO CONTRACTOR LTD by rotecch77(op): 5:20pm On Apr 05, 2022
More progress pics

Properties › Re: Construction Diary Of 8units Of 2/3brds Flat Structure By ARBO CONTRACTOR LTD by rotecch77(op): 3:27pm On Apr 05, 2022
Plastering and rendering in progress

1 2 3 4 5 6 7 8 ... 60 61 62 63 64 65 66 67 68 (of 332 pages)