Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 9:32am On Mar 05, 2025 |
RandomForest: Experience plumbers in the house and Engineers please I need help on this.
Can a 4 inch pipe serve 4 bathrooms (and kitchens) from 4 units of 1 bedroom flat. To be clear, the plumber run all connections to the Septic tank with a 4 inch PVC pipe. But a friend that was sent to survey the work is suggesting we change the pipe that takes from the chamber (where all 4 flats have been connected) to the Septic tank ( 23m distance) into 6 inch pipe. His reason is that 4 inch pipe would block easily. Is this correct? Don’t panicked your plumber is right, just only four toilets, in most cases in a residential buildings the waste pipes are usually 4” But in my own case I do make used of 6” pipe once my toilets are more than 6-7 in a single line this will save any unwanted blockage of chambers, I adopted this system about 12years ago , the 1st building I did with this system never for once experienced blockage since that year till today same as others buildings |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 12:16pm On Mar 03, 2025 |
topsy23: The plumber got it wrong from the beginning of the pipe installation. There is normal height for WC waste pipe from the finished floor level and from the one-meter or defence level level. Close couple 160mm Basin waste 530mm Supply 600mm
Conceal Waste 280mm
Basin Waste 530mm
Supply 600mm
Some artisans like using courses as against proper measuring tapes and and this will definitely have negative effect when installing the fittings. The use of plum, one-meter level or defence height is very important ,the height of the fittings is very key in plumbing installation.
Standard operating procedures must be followed. Both Electrical, plumbibg and AC have measurement to be followed.
The best solution now is to re-run the pipes and follow the proper mounting height. ... I find difficult to upload the mounting details but will try later. It’s a serious failed job hahaha The plumber and the handler totally failed on this As you said it’s total overhauling of those waste piping system to accommodate new setup, this time around a good handler should handle it. Here is the diagram to buttress your point
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 10:03am On Mar 03, 2025 |
“The Game house” We are on the slab stage now
|
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 9:21am On Mar 03, 2025 |
The Game house is in progress
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 11:28am On Mar 02, 2025*. Modified: 11:54am On Mar 02, 2025 |
Our Ibadan 3floors shopping complex project Pics loading.
|
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 10:07am On Mar 02, 2025*. Modified: 10:32am On Mar 02, 2025 |
More
|
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 10:00pm On Mar 01, 2025*. Modified: 5:07am On Mar 02, 2025 |
Railings for the project We don’t compromise with quality materials in our firm
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 8:06am On Mar 01, 2025 |
Happy Ramadan fasting to all our esteemed Muslim clients & followers. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 9:41pm On Feb 28, 2025*. Modified: 10:06pm On Feb 28, 2025 |
When it’s comes to quality materials we are among the best, we don’t compromised, what you paid for is what you will get.
Railings for our ongoing project.
|
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 6:42pm On Feb 27, 2025 |
Pop ceiling is in progress, watch out for pics |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 3:48pm On Feb 25, 2025 |
topsy23: The client is really using quality materials. I can seee fire resistant cable for the fire alarm installation..
Also thanks for the guy jyou gave me for the water stanchion. He did a good job. My client love it soo much Thanks Engr Topsy, I do show the guy most of your DB wiring setup and he always gives you thumb up. We don’t compromised quality in all our projects Not those regular cheap installations most guys does. Am happy you and your client love the welder guy work , he does most of my water tank stanchion Thanks |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 2:58pm On Feb 25, 2025*. Modified: 8:04am On Mar 01, 2025 |
Port443: Please guys, what is the best sequence, tiling and wall screeding? My engineer is saying that wall screeding should be done before tiles. I was of the opinion that tiles should be done so that the base won't require screeding after tiling but he made mention of sandpaper and painting. Is this correct? Sorry to say this, can you be of an opinion on how best to treat you when you visit doctor ? I think you believed in your Engr capability when you gave him/ her the job to do, so let him/ her do his job , he is 100pec right with what he told you. Make nobody quote me on this I get anger issue lolz |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 2:52pm On Feb 25, 2025 |
Speaker, fire alarm, cctv camera of this project is in progress
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 1:35pm On Feb 24, 2025*. Modified: 6:34pm On Feb 24, 2025 |
@ Arbor contractor Ltd ..we care
|
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 4:32pm On Feb 23, 2025*. Modified: 8:16pm On Feb 24, 2025 |
Loading
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 4:29pm On Feb 23, 2025 |
Update
|
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 8:50pm On Feb 22, 2025 |
Pop ceiling installation loading
Some adopted designs
|
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 8:47pm On Feb 22, 2025 |
More loading |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 8:32pm On Feb 18, 2025 |
Deeegbee: Give your estimates if no issue with the nature of the Land. Prepare between 30-35m |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 3:44pm On Feb 18, 2025 |
Dijita: Good morning Rotech. I believe you also did the plumbing pipes if I am not mistaken. Adedward did windows and Money did the roofing. My problem in that axis is salt from the sea. I don't think you guys have solution for that yet  Yes sir,I also did the plumbing work . We don’t have solution to that yet may be as times goes on shaa |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 11:49am On Feb 18, 2025 |
Deeegbee: What about a storey building of 3 bed up and 3 bed down? Location and nature of the land will determine the cost Thanks sir |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 11:29am On Feb 18, 2025*. Modified: 11:48am On Feb 18, 2025 |
sommerfeltservi: l Dangote Refinery area is not waterlogged don't worry go and build there without Soil test ...Ire o Don’t say that to Old man, the Oga knows what he is saying, about 4years ago i plastered one of his property in that axis and its not water lodge, so not all area there are water lodge |
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 12:50pm On Feb 15, 2025 |
More coming soon |
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 12:49pm On Feb 15, 2025 |
More
|
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 6:40am On Feb 14, 2025 |
Geekop: Great job... Well-done sir. Thanks bro |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 8:24pm On Feb 13, 2025*. Modified: 6:38am On Feb 14, 2025 |
Pop, tiling, wiring , loading
The 4th building “ THE GAME ARENA “ now at slab stage
|
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 8:21pm On Feb 13, 2025 |
Check this out
|
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 8:19pm On Feb 13, 2025 |
More loading |
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 5:21pm On Feb 12, 2025*. Modified: 6:01pm On Feb 12, 2025 |
4th building in progress “ The Game Arena “
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 9:17am On Feb 10, 2025 |
topsy23: It is possible sir... Just tell your plumber that you want everything to be conduit system sir. Exactly |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 5:08am On Feb 10, 2025 |
Celepope: It’s a storey building. And the criminal former Engineer used 6 inches all through upstairs. Someone said he is supposed to use 9 inches in some areas. The decking isn’t cantilever. I just don’t want the pipes showing from outside all through out the house (3 areas - Masters bathroom and two rooms upstairs which aligns with the two rooms downstairs) I’m being advised that cracking the wall may weaken the wall and lead to a collapse. I detest seeing duplex with pipes outside the wall and that’s what I’m trying to avoid. Actually the Engr didn’t do bad work by using 6blk for the upper section of the building , It’s not a bad practice , infact in most area in eastern region they do construct this way but it’s just advisable to consider 9” Blk for external wall walls in upper part of such structure to accommodate pipe, burglar bars etc c easily. As it’s the conduit piping system can still be achieved but it will required some wall chiseling by a good plumber to do this, All the vent pipe will be smaller diameter pipe like 75mm size. |
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 7:22am On Feb 09, 2025 |
Follow us for more |