₦airaland Forum

Welcome, Guest: Register • Login • With Google • Trending • Recent • New

Stats: 3,344,381 members, 8,511,584 topics. Date: Monday, 02 November 2026 at 12:16 AM

Toggle theme

Rotecch77's Posts

Nairaland Forum › Rotecch77's Profile › Rotecch77's Posts

1 2 3 4 5 6 7 8 ... 88 89 90 91 92 93 94 95 96 (of 332 pages)

Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 9:01am On Sep 22, 2021
We are here for your ;
* construction work
* Drawing
* finishings work
*renovation work
*plumbing/ electrical work
*Water treatment plant setup

Arbo contractor Ltd
Rotech building concept

08066619493
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 8:58am On Sep 22, 2021
Another Eatery construction loading..
E choke u ….
Watch out
Properties › Re: The Erecting journey of 2stories building of 12 flats by Arbo Contractor Ltd by rotecch77(op): 8:56am On Sep 22, 2021
Live update

Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 8:52am On Sep 22, 2021
We pegged down 30m for this building.
We are now at the final stages of the project .. painting and external work.
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 8:36am On Sep 22, 2021
Greenarrow01:
You are the best sir
Thank you so much for this analysis
No problem bro.
You are welcome sir
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 8:35am On Sep 22, 2021
DFAMEGUY11S:
thank you brother, although i did not answer him because i know their no reason for that, the person i explain to understand me clear
Don’t worry / stress your self much bro ,your explanation with price is well clear
Happy sell jaree
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 9:36pm On Sep 21, 2021
Greenarrow01:
@n3xt
This question is specifically for you.
And a one who can help answer it.
Lands in epe axis for agriculture cost between 1.5m or so per acre.
This is around at Augustine university.
But most factories and farmers choose to go to Ogun state, some places as far as 3 hours drive to Lagos.
Lands there cost 300k to 500k per acre.

Pls I will will to ask why people take that decision
Knowing fully well that cost of transportation to Lagos will tell
Actually it’s depends on individual and type of factory and the type of product to be produced.
I believed they might have
1 .check the sum of money to be invested in such project ( factory)
2, cumulative return in year(s)
And used such to determine there PAYBACK PERIOD
* A R R ( average rate of return )method
*p p ( peak profit ) method
With these method they will know the best deal either far ogun state land or Epe axis land to choose from.

But to me I will choose that Augustine university area.
The road that link IGBO NLA in ILARA back to IBOWON and OTEDOLA town area over FAR ogun state land
Bcs those area mentioned above in Epe axis will soon turn to new ogun/Lagos mega town/ village
That your land of 1.5m will become 10m per acre in few years
The far ogun state land like,
Ijebus area
Idowa
Emuren
Ijebu water side ( Abigi, Ibiade, iwopin)
Omu
Ilese
Imushin
Etc
We remains like that for years before it will grow

Pls don’t ask me if am from ogun state bcs sleep de worry me now I wan go to bed.
Check time
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 8:18am On Sep 19, 2021
More

Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 8:17am On Sep 19, 2021
Painting still in progress

Properties › Re: The Erecting journey of 2stories building of 12 flats by Arbo Contractor Ltd by rotecch77(op): 5:51am On Sep 19, 2021
watch out for more pics update
Properties › Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(op): 3:25pm On Sep 17, 2021
Arbo contractor ltd
Rotech building concept
both are legitimately registered with cac

we care about our esteemed clients
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 3:22pm On Sep 17, 2021
check here for more update
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 11:19am On Sep 17, 2021
[quote author=Blessedsunny2 post=105896645][/quote]I will advise you to go for Italian Ariston heater
They have been in existence for years
More so there part i.e element, thermostats, non- return valve are easier to get and replace.

My take on central heater to individual small heater in each toilets is that

Central heater
-to get replacement part for central heater is hard.
-it only require expert to take repair or replacement of part on it.
- ones it’s develop fault all rooms will experience shortage of hot water at the same time.
- cost effective
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 11:18am On Sep 17, 2021
[quote author=Blessedsunny2 post=105896645][/quote]I will advise you to go for Italian Ariston heater
They have been in existence for years
More so there part i.e element, thermostats, non- return valve are easier to get and replace.

My take on central heater to individual small heater in each toilets is that

Central heater
-to get replacement part for central heater is hard.
-it only require expert to take repair or replacement of part on it.
- ones it’s develop fault all rooms will experience shortage of hot water at the same time.
- cost effective
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 9:56am On Sep 17, 2021
1st coat painting done, round 2 ( final coat) is loading
With others touches to bring the final finishing outlook

Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 9:49pm On Sep 16, 2021
update loading
Properties › Re: The Erecting journey of 2stories building of 12 flats by Arbo Contractor Ltd by rotecch77(op): 5:14pm On Sep 16, 2021
Arbo contractor ltd
rotech building concept
we care
Properties › Re: Handlings Of Anambra Edifice By Rotech77 by rotecch77(op): 11:20am On Sep 16, 2021
Arbo contractor Ltd
Rotech building concept

Both own by Rotech77
But are registered with Cac

Your hard earn money is save with us
Properties › Re: The Erecting journey of 2stories building of 12 flats by Arbo Contractor Ltd by rotecch77(op): 11:18am On Sep 16, 2021
More update pics

1*12 here cost 1700-1800
2*3 cost 600
Bamboo 550

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 11:09am On Sep 16, 2021
Yansham:
In some cases, it is rip off. Contractors doing something far less than what was quoted when they sense the client isn't knowledgeable about the job at hand.

*For instance, a contractor quoted marineboard for the foundation of a fence to be done at once and was paid for that.*

What happened in reality? He bought few marineboard and was using,removing, and reusing.
The 2nd and last paragraph. You are right.
But who does that always is a newbie or non professional in the build industry.

Bcs when you calculated the time and money he will spend while doing all this it will equivalent or more than to do it once.
At time you can do it to save cost if cleint payment doesn’t come once or if you have lesser workforce but at the end of the day it’s you contractor will suffer for it.

- time wastage
- stress
- little materials wastage (nails, binding wire, few planks
-additional labour payment ( concr you supposed to cast with 10 unskilled Labour and 2 skilled Labour for a day and paid once will be elongated to 3 days.

Simple calculation for a concr work per day for example

Unskilled Labour 10*3500=35,000
Skilled Labour 2*4000=8,000
Supervisor 7,000
Capenter 15,000
Total N65,0000

Example 3 days remover and reused
Day 1
Unskilled Labour 4*3,500=14,000
Skilled Labour 1*4000=4,000
Supervisor 7,000
Capenter 5,000
Total N30,000
* The last day which is 2 ( the money will be put on cost of plank remover, wastage of nails, binding wire etc)
FOR 3 TIMES 30,000*3=90,000

3 times 90,000 ( with a lot of stress ) with work delay

Once N65,000 ( a day stress) fast progress

You short your self N25,000 as a contractor here.
Your cleint make the gain.

Lobatan- sefini
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 10:07pm On Sep 15, 2021
Ibk2020:
Yes.
Surface and submersible.
Which is good in term of durability?
Both serve different purpose.

Submersible it’s for bore hole
While surface pump is used to Transfer water and also used for very shallow WELL and Shallow bore hole
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 9:53pm On Sep 15, 2021
Ibk2020:
Pls is there any different between submersible pumps and regular pumps?
Nothing like regular pump .
( if I understand you is like you are talking about surface pump)
If so there is difference btw the 2
Properties › Re: The Erecting journey of 2stories building of 12 flats by Arbo Contractor Ltd by rotecch77(op): 8:55pm On Sep 15, 2021
ArcToyin:
Keep on the good work.

What is the lenght of the building?
Thanks chief
The length is 20m
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 8:53pm On Sep 15, 2021
Ibk2020:
Pls what HP and brand of pumping machine is recommended for a 80m depths borehole, thanks
3/4 or 1hp is ok for you .
Based on experience in the field
Just buy any pump that comes with real copper coil.

…Lobatan…
Properties › Re: The Erecting journey of 2stories building of 12 flats by Arbo Contractor Ltd by rotecch77(op): 7:09pm On Sep 15, 2021
Current update
6nos of able men work here today

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 12:51pm On Sep 15, 2021
JohnasI:
Is there anyone who has gone through full house renovation? I have an old detached house which I want to make look better. I was advised to check the gold standard decorator company but it's just I never dealt with them. What do you think of them? Or maybe you could advise me something else?
I renovated this old building to Modern type few years back.
See the link and some pics
https://www.nairaland.com/2633699/re-modeling-7bedroom-old-house-ogun/8#64428713

Properties › Re: The Erecting journey of 2stories building of 12 flats by Arbo Contractor Ltd by rotecch77(op):
Slab formwork still in progress

Clean working environment

Properties › Re: The Erecting journey of 2stories building of 12 flats by Arbo Contractor Ltd by rotecch77(op):
More

Properties › Re: The Erecting journey of 2stories building of 12 flats by Arbo Contractor Ltd by rotecch77(op): 4:39pm On Sep 14, 2021
BMathew:
Great job Engr. keep it the good work going.
Thanks so much sir.

Current update pic loading

Properties › Re: How Fast Can A 5 Bedroom Duplex Be Built In Nigeria? by rotecch77(m): 1:16pm On Sep 14, 2021
NotKnown:
Okay then. I'll get in touch with you.

Hope the number you posted on one of your posts is still valid?
Yes still valid

08066619493 call/ whatzap
Properties › Re: Handlings Of Anambra Edifice By Rotech77 by rotecch77(op): 10:19am On Sep 14, 2021
More coming
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 9:02am On Sep 14, 2021
Corona22:
Following
Thanks so much

1 2 3 4 5 6 7 8 ... 88 89 90 91 92 93 94 95 96 (of 332 pages)