Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rubbiish(m): 5:36pm On Feb 03, 2018 |
rabcnesbit: Good day house. So my quest for a septic tank and soak-away continues. Size of septic tank is (10ft x 8ft x 10ft) and soak-away is (7ft x 7ft x 6ft). Location is Sango Ota, Ogun State.
Digging – already done for N70k after hard bargaining.
Quote from bricklayer work: 1 lorry (20 tons) of sharp sand = N65k. 400 pcs of 9” blocks at N190/pc = N76k. Labour (includes setting blocks, plastering and casting) = N80k. Total = N221,000.
Quote from Welder: 12lengths (39ft) of 16mm N3,500/length = N42,000. 17 lengths (39ft) of 12mm at N2,000/length = N34,000. 7 lengths of 10mm N1,500/length = N10,500, binding wire = N2,000 labour = N8,000. Total = N96,500
Quote from Carpenter: 2 x 3 plank of 11 pcs at N500/pc = N5,500. Somi-wood 23 pcs at N1300/pc = N29,900. Nails 2 inches = N3000, 3 inches = N3000. Labour = N18, 000. Total = N59,400
Grand Total = (70k + 221k + 96.5k + 59.4k) = N446,900 Is this a reasonable amount for constructing a ST and SA of the aforementioned size! Cement, soft sand and granite not included as I have some of these already. Thank you I didn't check others but this digging & sharp sand is kind of scary...Na rock them wan dig? |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rubbiish(m): 2:35pm On Feb 03, 2018 |
diordaves: The rule is never sand fill your compound above the DPC as you may breach the DPC. Same with interlocking and concrete flooring. Always below the DPC. About one coarse below the DPC won't harm your foundation. Okay thanks |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rubbiish(m): 2:19pm On Feb 03, 2018 |
diordaves: Backfilling and compound filling are the same thing eventually. You can't backfill your foundation and not levelling it with the compound. So for example you did a four coarse foundation, best practice is to backfill to the height of just below the DPC level and it is this level you should use to fill the compound.
Unless you're building on top of a hill, lands are seldom higher than roads. I know sand filling the compound is one expense homeowners shy away from, but the truth is if you did a proper high foundation like four coarse, you should back fill the foundation and eventually the compound. Only so can you truly enjoy the benefit of a high foundation as rain water will not settle in your compound but wash away to the adopted road and gutters. Thanks for the explanation sir How close should the filling be to dpc, like one foot? If the compound is not interlock or cast with concrete, Is there no disadvantage to it? |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rubbiish(m): 12:12pm On Feb 03, 2018 |
diordaves: Of course the back-filling of a compound depends on the height of the foundation. Go back to page 845 to see AZUH's project with respect to the pic I've attached and ask yourself if that foundation needs back-filling. The foundation is as low as a snake's belly so no back filling needed. But with a four course foundation, you need to back fill not only to ensure stability and integrity but to ensure your compound is higher than the adopted road so water flows out away from your compound and not the other way round. The bold was my understanding of the need for compound filling, but in a case where the land is above the road level, do one still need this filling? Do pardon my ignorance, is backfilling & compound filling actually the samething? |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rubbiish(m): 11:21am On Feb 03, 2018 |
bereiweris: I still ve a single hassle tipper of sand & few 3/8 remaining Then the price is on the high side |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rubbiish(m): 11:19am On Feb 03, 2018 |
bereiweris: Tnx sir this idea sounds nice. Bt won't d dug area collapse? As long as u can set ur block before the rain set in proper, u have nothing to worry about. Just cover the pit & barricade it with blocks But if u aren't sure of when to set, then forget abt it... |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rubbiish(m): 11:17am On Feb 03, 2018 |
diordaves: You don't have to do a soakaway pit at the start of the project. One, it's a health and safety risk as work is going on. Two it will fill up with water during the rainy seasons and stand the risk of collapse.
The problem seem what to do with the laterite from the soakaway if you did the soakaway later on right? Use it to fill the compound, you did four courses high foundation so you will fill the compound one way or another. You will not save much if you are relying on the laterite to fill your foundation and any cost savings may be wiped out by maintenance costs of the soakaway until the project is finished. I don't really think the filling of compound depends on foundation height. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rubbiish(m): 11:10am On Feb 03, 2018 |
bixton: The op is yet to say what manner of soakaway is to be done and the size. True |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rubbiish(m): 9:53am On Feb 03, 2018 |
bixton: Even with that the op will not spend that amount. E fit reach bros depending on his location |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rubbiish(m): 8:58am On Feb 03, 2018 |
bixton: Okay. The amount you quoted as having to do a soakaway is way over board even if you want to do 2 of it and you're not likely to do the reinforced concrete sinking type since your terrain does not need it. Check your pocket, re-strategize, plan ahead and proceed with the good works. Good luck. U need to first find out if op have granite & sand left on ground? |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rubbiish(m): 8:55am On Feb 03, 2018 |
bixton: There will be no need to dig the pit if he does not intend to set the blocks immediately. He cannot exceed 500 blocks for such purpose which is even high even if he wants to do the type with 3 partitions. Why? It isn't rainy yet & i have done it before Pit can be covered with discarded planks |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rubbiish(m): 8:22am On Feb 03, 2018 |
bereiweris: Tnx for ur contribution. I ve a borehole already. We did 4 coach for d foundation & yes d ground is a solid ground. He said he used 4 coaches cuz of d road nearby which has not been done yet It is a common practice to dig soakaway & use d sand for filling Since u will eventually dig soakway What u should do is to ask ur builder to break the 300k quote for d soakaway, do only the digging first & use the sand to fill. Thereafter u can start talking about setting of blocks. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rubbiish(m): 8:29pm On Feb 02, 2018 |
bereiweris: I’m building my house in parallel with another friend and I know the extent of the savings I had. Tnx so much for this idea. Bt d major problem here is in d filling.he is also saying I should do a soakaway 1st with a quotation of 300k so that would go a long way in helping with d filling Is the 300k for only digging of soakaway? |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rubbiish(m): 6:23pm On Feb 02, 2018 |
spyder880: 1. Choosing the best of sand, cement, and water 2. Ensuring a very level ground for placing the blocks 3. The mix is the most important aspect of block making. Even if you make only 20 blocks per bag and the mix is poor, the blocks will still be as brittle as biscuits. 4. Supervision. Someone must be present to see that workers don't remove some cement and then manage the rest to achieve a predetermined number. Good points... |
Properties › Re: My 3bedroom Allcensuite Drawing by Rubbiish(m): 10:23am On Feb 02, 2018 |
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rubbiish(m): 10:21am On Feb 02, 2018 |
|
Properties › Re: My 3bedroom Allcensuite Drawing by Rubbiish(m): 9:30am On Feb 02, 2018 |
Dembuk2009: Thanks to everyone for the input... @Rubbish, tuale 
@ saydfact, u are a man of ur words and what I have learnt from u is how to keep to time and never put money first!!?  May almighty God open more doors for u as u have made dis project seem simple U are welcome sir... |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rubbiish(m): 9:25am On Feb 02, 2018 |
Waladade4luv: Thanks so much for ur response i think d only disadvantage with vibrated block is d fact that those block indulsries dont use adequate propotion of cement cos of dia gains but dia blocks are neater and d vibration is also an advantage but i donno if the risk is worth taking Oga use hand mould blocks if u can't afford to rent the machine for personal use to be sure of d cement mix ratio Vibration is good, but not as important as the mix ratio. Vibrating blocks of 70 blocks per bag of cement will never be as solid as 30 blocks per bag of cement hand mould blocks. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rubbiish(m): 4:25pm On Feb 01, 2018 |
Chekitaut: Dangote suspended production of 42.5R cement. What you see more in circulation is 42.5N, If you want a rapid curing Portland Cement consider Lafarge Portland Cement "Supaset". Seems the demand for 42.5R is low... |
Properties › Re: Building A Fence On A Plot Of Land In Rural Enugu State: Costs And Challenges by Rubbiish(m): 10:52am On Feb 01, 2018 |
spyder880: That is what we did, one pair straight and the next one on top cut and joined. Okay sir... |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rubbiish(m): 10:07pm On Jan 31, 2018 |
gbadexy: I highly doubt it sir. its not going to be effective against constant contact with water. Assuming the water is able to drain off quickly, it may work, but decking are flat and level. Besides, the soakaway is sealed and there is no way to see if the water is totally repelled @bold very true sir But i honestlty think tiling such area will do the magic. Though bitumen is what is mostly use for such purpose |
Celebrities › Re: Oluwatobiloba Falana And Olajumoke Orisaguna In Wedding Photoshoot by Rubbiish(m): 10:04pm On Jan 31, 2018 |
ekems2017: Wow!!!! So lovely. God pls give him just one contract that will make him hit millions for his family. U dey forbid to hit millions?? U no go pray your own...
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rubbiish(m): 9:47pm On Jan 31, 2018 |
true2home: Honestly, why don't people just tile the deck and incorporate a drain pipe to drain the overflow off the deck asap. The water will not have time to percolate through the tiled surface. I will be doing one soon for my old man's hangout deck U are so on point sir Tiling is very effective when it comes to preventing water from going through |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rubbiish(m): 9:45pm On Jan 31, 2018 |
gbadexy: you would need a bitumen based coat. I don't have an idea of any brand but I'm sure there would be some around. No paint can entirely prevent a decking against constant exposure to water. Epoxy based paint could have worked but it weakens eventually on exposure to sunlight (ultraviolet rays). What about these water proof cement we use on slab for soakaway, can it prevent such? |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rubbiish(m): 9:41pm On Jan 31, 2018 |
Nbg4real: Good morning house, please some one should recommends good waterproof material for my tank area (deck), price and where to buy it. the concrete has already been done but the tank is yet to be install Is the deck attached to your building? U ought to have use water proof mixture during casting of the concrete U can use felt since u have already cast the deck. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rubbiish(m): 9:37pm On Jan 31, 2018 |
Melahou: I have been given an estimate but I feel it's way too high so I need a second opinion so as to make a decision... A rough estimate is not a bad idea Contact this builder segzy14 He may be of help He has couple of informative threads on estimate |
Properties › Re: Building A Fence On A Plot Of Land In Rural Enugu State: Costs And Challenges by Rubbiish(m): 9:33pm On Jan 31, 2018 |
spyder880: The practice is to lay one pair straight, then cut the next in halves and lay them on the pillars. Ehen! this is d one i know of, but what i m seeing from d pics seems laying all pair straight... |
Properties › Re: Building A Fence On A Plot Of Land In Rural Enugu State: Costs And Challenges by Rubbiish(m): 11:44pm On Jan 30, 2018*. Modified: 6:46am On Jan 31, 2018 |
spyder880: Then we started laying blocks on the concrete blinding...... Sir is there no disadvantage in placing blocks on top d other in straight form for the fence pliiars? Won't this make d motar attaching the fencing blocks meeting the pillars a straight line, which can make it loose easily?
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rubbiish(m): 8:21pm On Jan 30, 2018 |
Melahou: I have the drawers Good...If u intend to build soon, i will advise u to engage someone who is likely to execute the job to give u an estimate, it will be more accurate or close. I don't think anyone will take d stress to do that here. But if what u need is just a guess estimate, for 4bedroom & 2 detached single rooms, u can budget something around 8m(na guess ooo)....for raft like u said it will likely cost more... |
Jobs/Vacancies › Re: Do You Want To Secure A Good Job In Nigeria? Top 5 Factors You Should Consider by Rubbiish(m): 8:10pm On Jan 30, 2018 |
manikspears: So na so it be o ,when trump called Nigeria a shit hole country I didn't argue. The land is richly blessed but the people occupying it are cursed. True... |
Properties › Re: Building A Fence On A Plot Of Land In Rural Enugu State: Costs And Challenges by Rubbiish(m): 6:29pm On Jan 30, 2018 |
spyder880: We bought the solid blocks, but my client preferred the hollow blocks of same 6, so had I had to go back and buy them...... What is the size of d plot sir? It looks quite big But i would prefer 6" solid to 6" hollow for fence, apart from sound breakage, i see solid to be stronger. |