somehow:I understand, Lagos rainy season is always very wet. Well done Sir, God will provide for all of us to speed up our different projects. |
somehow:Oga mi, hows your project going, hope it's getting to completion now. |
somehow:They are expensive, and a little hard to find. |
somehow:Work is ongoing with it........
|
Time to go.......
|
Chriswazo:We've done all those things, tiles, rubber glazing, smooth plastering, slanted tops, everything. |
The compound is filling up............
|
3 satellite dishes, many air conditioners ![]() We are leaving this site before we start being a nuisance to the tenants who paid to enjoy this building. Just a few things to fix today, and a very few complaints to address. My workers are around for the final bits before we relocate to a new site........
|
JOACHINpedro:Thank you Sir. |
Chriswazo:My brother, its a long story. Using the top of a building as a base to mount the water tanks has been a practice which was popular back then. But not anymore. Firstly, a homeowner who wants tanks to be on his rooftop will have to plan this from the start, and so there should be provisions made for the additional load of the water tanks in the structural drawings of the building. The nature and functionality of 5he tanks should also be planned to details. Going back to what I was saying, water tanks has caused so much damage to houses that people started looking elsewhere for their water storage needs, like stand alone overhead tanks and metal towers. There is always the issue of leaks, either from the water being pumped or leaks from the tanks itself, even rainfall can cause some water to remain at the tank base if it's at the top of a house. These leaks find it's way into the core of the building, degrading the materials like concrete and iron rods which starts to rust. Over the years there might be structural failures which will damage the house, if not causing a building collapse entirely. The leakage also defaces the house, you will see some houses with algae growing around the walls, it's always very unsightly. |
Work continues at this site today........ |
Inside some rooms.......
|
Updates, as we fit in and dress windows at this site........
|
Some site store delays has prevented us from starting today, but I will be moving to start stocking this site with blocks, sand, chippings and other materials needed to give us a smooth start to this project. |
We are waiting to resolve some issues about community development levies before we complete this fencing and gate mounting. Some community youths has been coming to stop us from working. They are charging us N350,000 as community development fees or else, we shouldn't work again. This amount should cover for the whole construction of this fence and even for the building of the main house. |
Images from this our site today.........
|
Since we are still working at this site this week, I will be inviting all our people who hasn't seen this land and this entire area on a guided tour of this estate this weekend. I have been to this estate with up to 4 nairaland members, including those who had paid for lands here. But another tour of the area is necessary, as the rains are starting and grasses starting to sprout, a visit next month may not be very convenient or easy due to wet grounds and slippery soils. I will be waiting at this site on Saturday this weekend. For more information, call me on 0803 335 0750. Thank you all. |
The sky was heavy, and rainfall was predicted today, so were were only doing sketchy works and waiting for a brighter day to lay more blocks, although we're at the lintel level in many flats...........
|
More pictures of more work from this site today.......
|
We are planning to start this building by Wednesday next week. Arrangements to construct the site store and also create an entrance where trucks can bring in sand and chippings is ongoing. Actual construction should begin by Wednesday, more pictures when we start. |
Work still going on smoothly at this site. More pictures from this site tomorrow. |
Hanging the second gate today.......
|
Rany4all:You are right bro. Thanks. |
rukyboy:No, the information you got is wrong. What they meant is that a new decking slab cannot be unloaded. (Removal of bamboo supports) until about 21 to 28 days depending on conditions. You can load and lay blocks on a decking 3 days after the decking cast as long as the bamboo supports are intact underneath. Decking curing methods like water treatment is also very advisable. Thanks. |
Rany4all: Lol, I know someone will comment on the colour. Enugu has this very dark gravel and stone colour, and brown coloured sand which gives very weird looking concrete mix. But from my findings, the concrete are so hard as to be comparable to any concrete anywhere.
|
One gate hung, we will hang the second one tomorrow........
|
Busy hands all over the site..........
|
More work as we move to raise the walls on the upper floor.........
|
More pictures........
|
Work updates from our work at this project site........
|
Digging of gate foundation bases...... And cast of the base
|
We bought 2 gates, and took them to the site.........
|