Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 9:48am On May 16, 2022 |
A/C units at the front ...........
|
Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 9:43am On May 16, 2022 |
More air conditioning units mounted on the walls..........
|
Properties › Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 9:11am On May 16, 2022 |
More corner design works being completed at this site, a wall belt has also been done at the second decking level.
More pictures later in the week. |
Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 9:10am On May 16, 2022 |
michlins: although I don't know how the boss does his own but I have seen instances where the builder sells them Yes it's sold. There are people that deals on them. |
Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 9:09am On May 16, 2022 |
folyshow: Considering the huge quantities of woods & bamboos that are required for decking, could they be re-sold after construction or what other purpose can they serve? I am asking from a perspective of a house owner who might not start another building anytime soon. Of course a builder might re-use on other projects; what do you advise that a house-owner should do of them?
Kindly clarify. Thank you There's a huge market for second hand building materials, including wooden planks and boards. For someone who wont like to continue using the old boards, it could easily be sold. I have heard costs like N600 for one old board in second hand markets. The most important thing is keeping the boards in good conditions, conditions good enough to attract a good price for it. Some people use nylon sheets to keep the boards separated from water and cement, some remove them and pack them neatly after pulling out nails from the old wood. Thanks. |
Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 9:48pm On May 15, 2022*. Modified: 9:41am On May 16, 2022 |
Air conditioning units installation completed for this house.........
|
Properties › Re: The Making Of The "Anambra 7 Bedroom Castle" by spyder880(op): 9:41pm On May 15, 2022 |
More as we speed up this work .........
|
Properties › Re: The Making Of The "Anambra 7 Bedroom Castle" by spyder880(op): 9:38pm On May 15, 2022 |
More pictures as we have started laying blocks in the foundation...........
|
Properties › Re: The Making Of The "Anambra 7 Bedroom Castle" by spyder880(op): 9:35pm On May 15, 2022 |
Update pictures of our foundation works in this project............
|
Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 9:16pm On May 15, 2022 |
More pictures from the top of this project as we cast more lintels, block setting on the lintel beams will start tomorrow or next.
|
Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 9:11pm On May 15, 2022 |
Concrete cast of upper floor lintels continues today.....
|
Properties › Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 7:42pm On May 15, 2022 |
Rany4all: Oga Spyder, weldone o.
I was just thinking...in these modern POP ceiling designs like you have done in this building, are those gaps between boards direct connections between the interior of the rooms and the interior of the roof?
I'm a bit concerned about the easy access such gaps will offer to insects and reptiles (especially geckos) to gain entry into the house.
See pics below for what I'm talking about, thanks. No, the gaps are not open till inside the roof void. They are sealed behind the gaps. A lot of people love the gaps as they are used to showcase chain lights of different colours. This attached picture is a good example of how it looks after the chain lights are fitted. Happy weekend.
|
Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 7:37pm On May 15, 2022 |
Chidimercy: Please, I would like to ask. From the construction, I can see the waste plumbing pipes install. It's it the modern way of construction. The plumbing pipes are now conduit. I am just asking to be clarified. And what is the advantage and disadvantages of that. Yes the plumbing piping is conduit. More and more people are now adopting the conduit waste piping because a lot of artisans has mastered the skills involved in conduit plumbing for waste and water supply lines. The advantage is that it's a better way of building, as all the pipes are buried inside the walls, making the whole building neater as there are no pipes hanging around everywhere. |
Properties › Re: Construction Of A New Security House And Generator House In Anambra State by spyder880(op): 12:14pm On May 15, 2022*. Modified: 6:28pm On May 15, 2022 |
Work on the security house is in progress, walls all gone up..........
|
Properties › Re: Construction Of A New Security House And Generator House In Anambra State by spyder880(op): 12:12pm On May 15, 2022 |
Generator house foundation filling and compaction........
|
Properties › Re: Renovation Process Of 2 Flats In Anambra State by spyder880(op): 12:09pm On May 15, 2022 |
Still bringing in more materials...........
|
Properties › Re: Renovation Process Of 2 Flats In Anambra State by spyder880(op): 12:03pm On May 15, 2022 |
Plumbing piping works
|
Properties › Re: Renovation Process Of 2 Flats In Anambra State by spyder880(op): 11:26am On May 15, 2022*. Modified: 12:02pm On May 15, 2022 |
Drilling holes in walls to bury electrical piping and re -lay the wires into the walls.
Work in progress
|
Properties › Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 10:30am On May 15, 2022 |
Badgers14: Oga sir, what is the plot size for this project? This plot is nearly 1000 square metres. But not a regular rectangular shape. |
Properties › Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 7:03am On May 15, 2022 |
More pictures from inside this house as the finish is getting completed...........
|
Properties › Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 6:58am On May 15, 2022 |
Master bathroom tiles done.........
Some rooms.......
|
Properties › Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 6:53am On May 15, 2022 |
More pictures from the balconies.............
|
Properties › Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 6:48am On May 15, 2022 |
Inside the compound...........
|
Properties › Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 6:44am On May 15, 2022 |
Sand, chippings bought for the compound floor works..........
|
Properties › Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(op): 6:41am On May 15, 2022 |
Pictures from this project yesterday..........
|
Properties › Re: Renovation Process Of 2 Flats In Anambra State by spyder880(op): 9:41pm On May 14, 2022*. Modified: 11:24am On May 15, 2022 |
kenelink11: My dear Brother, am Kenechukwu Nnoli and I recently graduated from civil Engineering in unizik. I will love to be your disciple. Good evening my brother. Nice to know you. |
Properties › Re: Renovation Process Of 2 Flats In Anambra State by spyder880(op): 5:47am On May 14, 2022 |
Removal of the baths, old pipes and wash hand basins..........
|
Properties › Re: Renovation Process Of 2 Flats In Anambra State by spyder880(op): 5:44am On May 14, 2022 |
More rooms with tiles removed.......
|
Properties › Re: Renovation Process Of 2 Flats In Anambra State by spyder880(op): 5:40am On May 14, 2022 |
Tiles removal in progress........
|
Properties › Re: Renovation Process Of 2 Flats In Anambra State by spyder880(op): 5:35am On May 14, 2022 |
The electrical wiring in these flats were the surface wiring method, with tumbler switches. We intend to work on the walls to remove all the wires, and change this system to a conduit piping system.
Note that all the electrical components in this house are still very functional, despite working for nearly 40 years. We just need modern switches, sockets, light fittings and bulbs.
|
Properties › Re: Renovation Process Of 2 Flats In Anambra State by spyder880(op): 5:21am On May 14, 2022 |
We might not change these designed doors because they are still in good conditions, they only need some touches, painting, change of keys and general repairs...........
The wall tiles in the bathrooms will be changed, the piping for water and waste redone to modern standards, hiding all the pipes inside the walls. We also plan a full floor to ceiling tiling work.
|
Properties › Re: Renovation Process Of 2 Flats In Anambra State by spyder880(op): 5:15am On May 14, 2022 |
We also plan to remove the bath, change it with a shower unit and change the W/C units to new ones.
The wall tiles will also be changed.
|