I just did mine today 27/11/2018 and collected immediately. Force headquarters Abuja is where to go. You can show appreciation voluntarily. It's absolutely free |
Please guys advice needed on the septic tank and soak away. The septic tank has been casted and plastered on all sides but the engineer said we shouldn't plaster the sides of the soak away that it's a waste of money while some other people are suggesting it's to be plastered that water is supposed to drain only from the ground of the soak away. If not it will weaken the hollow blocks faster in years to come. Thanks for advice
|
Thanks. We would increase it. Osinachiadinma: |
Please guys help me and scrutinize the entrance door. The main entrance to the house (ante room) is 3 feet door while main parlour after it is 4ft door as in the plan. What's the advantage or disadvantage and any possible amend
|
Please guys help me and scrutinize the entrance door. The main entrance to the house (ante room) is 3 feet door while main parlour after it is 4ft door as in the plan. What's the advantage or disadvantage and any possible amendment if needed. Thanks for your comments
|
I sure will. He would be here tomorrow for German floor and setting out. Hajivince: |
Yes, the septic tank/ soak away Hajivince: |
Hajivince:
|
Thanks Haji, we are actually digging the soak away so we can fill back the sand into the foundation,which was completed today. As for his stipend, I didn't let him spend as he was staying with me during the 6days work before he traveled yesterday to attend to his family. We would use water supply in the compound of the blue tank in the picture to still water it.He will be back for German floor and setting out block wall soon. It's expensive to build o. I wonder how people survive it lol. quote author=Hajivince post=70953220] On a good soil that even Strip footing can be used, 6-8m to screeding while on a not too good soil where Raft can be used, 8-10m and on a bad soil where deep foundation such as Pile can be used, whew, 12-18m depending on the depth of pile. For more analysis breakdown, you can reach me on WhatsApp or Call: 08069452707 Thanks[/quote]
|
This is the picture of the double 2 bedroom flat and a 4bed duplex in front all sitting in a 471sm land. I paid my engineer 150k so far. He's a relative. We are waiting for rain to beat it well before we cast German floor.Thanks guys for your input. Open for input and questions. Thanks
|
Please how many tons of chippings is needed to deck a 254sqm duplex with two staircase. Thanks |
Please where is the best place to buy chippings stone and rod at affordable price in port Harcourt. I see a company around akpajo-eleme road. |
OK give me a reasonable fair price for each. The person supervising is related to me. So I want to pay but not excess. Break payment down by stages. 34 columns and coverage is 247sqm. 4bedroom duplex and 2 units if 2 beddroom flat all attached together. Chekitaut: |
Hello bro, I've similar plan of coverage area of 247sqm. Please if you have started to DPC, kindly give me details cos I'm about to start as my plan just returned from urban. I've up to 6500 of 9 inches blocks already on ground. Reply appreciated. Thanks earthrealm: |
Yes you have spoken the mind of the elders. Igwe is also aware of this development and has suggested we engage the village town crier immediately. Let's gather on the next Eke market day to complete the sacrifice with the foreigners head. I greet you my elders. Daboomb: |
Can 9 inches block be used for foundation. Then after DPC you can use 9 and 6 topsy23: |
Thanks bro. Have mould up to 6,000. I intend to stop at 7,500 9 inches hollow block. earthrealm: |
I tire for the price quote. Alkanelly: |
Thanks brother. I have 4 bedroom duplex (4rooms) and double 2bedroom flat all attached together. Are the blocks all 9 inches. How many 9 or 6 inches block will finish same of coverage area of 254 square meter. I have mould over 4,500 of 9inches blocks and still moulding 9. based on your qs quote. Whats the quantity if 9inches and six inches that we I'll finish all the block work in the building. Thanks earthrealm: |
Bros please what's the estimate of blocks that will finish what you just mentioned. Breakdown please. Thanks. Talk2iyfy. quote author=earthrealm post=69816834] woji-ph axis, not sure of soil type, but not swampy, neighbouring structures didnt do any extensive foundational works... project is one structure consisting of 2 units 2br flat and 1 unit 4br duplex.[/quote] |
I mean sorting his payment and labour. How best should I negotiate. Should I pay him stage by stage or till all block work is completed.or let him check cost of his services including the whole labour cost. Chekitaut: |
Please what's the best way to negotiate with my engineer for building payment. I intend to buy most of the materials and considering we may build and stop after decking. |
Please help with realistic estimate. What's the detailed stage by stage cost of building a 4 bedroom duplex (4rooms) with only one parlour and double 2bedroom flat (1 down, 1up) all joined together. How many blocks will it take on the average. We are moulding blocks while waiting for the plan. Total built area is 254sm. Thanks |
Please help with realistic estimate. What's the detailed stage by stage cost of building a 4 bedroom duplex (4rooms) with only one parlour and double 2bedroom flat (1 down, 1up) all joined together. How many blocks will it take on the average. Total built area is 254sm. Thanks |