Simplesoul05: Hello sirs.... First of all i salute my motivator in building oga Muyesky Now straight to the point.
Started my project years back and i just finished the nogging part after roofing. Below is the stages i still need to pass through but i will appreciate if you can help me arrange them according cos i dont really know where to start from after some months break.
Soak away Buglary installation Door installation Condict both the laying of electricity pipes and plumbering pipes Installation of windows Plastering Flooring Pop/ceiling
Please experts help me arrange accordingly on the stages i should choose as priority considering cost too sirs. God bless you all as you do so.
Hajj Mufutau mufutau55 rotecch77 NL1960 freshvine topsy23 After roofing and nogging, the electrical and plumbing conduit pipes should be the next. Burglary and plastering can go simultaneously. Thanks |
Properties › Re: ABB Distribution Board And Schneider Distribution Board Our Choice by topsy23(op): 7:38am On Sep 02, 2016 |
zoogy2007: I am based in PH and I like your neat job. If you can do a small job in PH give me a shout at ozumba_v@yahoo.com Boss am yet to hear from you. |
Properties › Re: Contact Us For Your Electrical/mechanical(plumbing) Design And Installation by topsy23(op): 7:31am On Sep 02, 2016 |
To the Glory of God we powered this building yesterday.
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 8:05am On Sep 01, 2016 |
mufutau55: This will be a real disaster o. It's going to affect both the Builders and their Clients. All of us with kobo-kobo projects may need to suspend work on the projects o. God help us o.
Hajji M. Serious disaster Hajj, last week I planned to buy 10kva online ups bluegate and I was given a proforma invoice of 680k , I collected the cheque on tuesday and getting there I was told that the price of the ups has gone up to 980k. I was shocked. The "CHANGE" is really changing everything. The only thing that is not affected in the market now is the salt  |
Properties › Re: 12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE by topsy23(m): 7:04am On Aug 31, 2016 |
Nice work boss....more strength, more power |
Properties › Re: ABB Distribution Board And Schneider Distribution Board Our Choice by topsy23(op): 7:12pm On Aug 29, 2016 |
targus: Hi,
Please send the price for D4 ABB Distribution Boards to tunetunji@gmail.com Mail sent |
Properties › Re: Importance Of Proper Earthing And Bonding System In Electrical Installation by topsy23(op): 6:52pm On Aug 29, 2016 |
battleaxe: Earthing pit located on site. However I notice that on touching the body of the AC condenser units, electrical shocks are usually received.
What should be the problem and what is the solution?
Thanks. Check the electrical connection to the outdoor unit very well and make sure the live conductor is not touching the metal part. Also check the earth cable from the distribution board to the unit and make sure is properly connected. Hope the earth pit is properly done! |
Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 6:07pm On Aug 28, 2016 |
Happy sunday |
Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 5:51pm On Aug 27, 2016 |
AC condensate and sleeve for the refrigerant pipes
|
Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 1:55pm On Aug 27, 2016 |
Straight to bayelsa
|
Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 1:09pm On Aug 27, 2016 |
Happy weekend to you all |
Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 6:52pm On Aug 26, 2016 |
The cabels sent to bayelsa today. 95mmx4-core, 10mmx4-core, 16mmx4-core armoured cable. Thank you mr chidi for believing in us
|
Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 6:58am On Aug 26, 2016 |
Let's handle your M&E and get the best from us |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 2:38pm On Aug 25, 2016 |
erico2k2: Garritttt  @ Erico; in addition to what NlresidentQS says, the quantity surveyor is the person responsible for figuring out just what a construction project is going to cost. They have other roles too, especially making sure that construction costs are managed as efficiently as possible. Quantity surveyors have this title because they prepare a ‘schedule of quantities’ — estimates of the material and labour costs — that contractors’ tenders can be measured against. (However, contractors are not selected for cost alone.) The schedule is also called a cost estimate. Other names for people employed with quantity surveying qualifications include estimator, cost engineer, cost manager, cost analyst, project coordinator, project cost controller and cost planner. Quantity surveyors’ main roles are: • managing the finances for any kind of construction project, whether it’s a house, a high-rise, a bridge, etc • working to keep the project on time • working to keep the project within the budget • making sure that construction costs are managed as efficiently as possible • Resolving disputes between contracting parties in terms of measurements and cost Before the project, the quantity surveyors calculate a budget based on their client's requirements. They prepare detailed estimates to ensure the budget is sufficient for each stage of construction. Their main task is to find out what a construction project will cost, including materials, labour, and services. |
Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 8:49am On Aug 25, 2016 |
Call us today and place order direct from major distributor |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 10:05pm On Aug 24, 2016 |
erico2k2: SO if Im getting you rightly in a big construction company ie JB, the QS provides/prepare the Bill of quantity to be used by JB if thats waht you are saying that means its the builder' responsibility then not the client cos for JB to know how much to tender as bidding it needs to know the quantity and cost the person charged with such responsibility i n JB is the QS and its in house.am I right here? This is how the process goes: Architectural design company, after the approval of the design drawing by the client and the necessary structural design has been completed on it, the client send the drawing/s to QS to prepare value engineering cost from start to finish. The client will have the idea of cost of the project. They normaly involve consultants in such area. Consultant will now send blank bill of quantities called tender to all the contractors to get their own quote and select the best for the project |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 9:36pm On Aug 24, 2016 |
erico2k2: Ok In big construction coy, who provides the Bill of quantity to be used in bidding  QS prepare bill of quantity and include contingency in-case of variations |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 9:36pm On Aug 24, 2016 |
erico2k2: Ok In big construction coy, who provides the Bill of quantity to be used in bidding  QS prepare bill of quantity and allow contingency in-case of variations |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 8:45pm On Aug 24, 2016*. Modified: 9:20pm On Aug 24, 2016 |
erico2k2: I have been asking a question here with no answer yet, who is it that is meant to hire a QS? Client or Builder/contractor ?? Normally QS work start immediately after the completion of Architectural/ structural design. I believe client suppose to hire the service of QS at the preliminary stage to know the cost that will complete the project. |
Properties › Re: CONTACT US FOR YOUR ELECTRICAL AND PLUMBING INSTALLATION WORK!!! by topsy23(op): 8:06pm On Aug 24, 2016 |
Call us today |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 6:07pm On Aug 24, 2016 |
danowena: Nice calculation and it makes a lot of sense. However, you need to review it.
Because u made an assumption of 6 people living in each flat (average), Thus total number of people ought to be 6x4 =24 people.
Hence using the 120 litres you proposed, the total litres required would be 24x120= 2880 litres. Thanks for the observation |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 1:14pm On Aug 24, 2016 |
ANBAKO: Good people of the house, warring parties inclusive, please which tank is the best to buy: GP, STOREX & HART? My plumber advises I buy STOREX being of a better quality according to him.
Need advise and if possible market price.
I know Brabusng posted something like 21K for original GP tank.
Also what should be the minimum volume of overhead tank for a house of 4 units of 3 bedroom apartment?
Thanks.
Hope this will help "de-derail" this thread....  Well, see the calculation below; for a single 3bedroom flat with average of 6people total number of people for the 4flat would be 5x4=20people. Daily water usage per person(Averagely) 120Litres per day(FLUSHING, WASHING, BATHING, ETC). Now: 20x120=2400LITRES. I stand to be corrected tho. |
Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 11:36am On Aug 24, 2016 |
Takventures: Dear mr Topsy,
Kindly avail me the number for Nigerchin marketer and Coleman.
Thanks Whatsapp me on 08033643191. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 11:30am On Aug 24, 2016 |
I thought this discussion is over and everything is normalize on this thread  . |
Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 7:34pm On Aug 23, 2016 |
twinskenny: hello chief which automatic change over switch can you recommend? oss, I used locally fabricated automatic transfer switch. They normally build it with schneider/ABB breaker together with contactors. But remember the generator and the Automatic transfer switch must be connected together with a control/sensor cable that will send signal to generator to start automatically when there is power outage/failure. See the prices of the last I installed 125A 3p AMF/ATS panel with other control accessories N367,890 200A 3p AMF/ATS panel with other control accessories N478,906. The Generator must be ATS compartible |
Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 6:38pm On Aug 23, 2016 |
Thanks to all our customers |
Properties › Re: Contact Us For Your Electrical/mechanical(plumbing) Design And Installation by topsy23(op): 6:29pm On Aug 23, 2016 |
Thanks for your call |
Properties › Re: Contact Us For Your Electrical/mechanical(plumbing) Design And Installation by topsy23(op): 6:24pm On Aug 22, 2016 |
Call us today |
Properties › Re: CONTACT US FOR YOUR ELECTRICAL AND PLUMBING INSTALLATION WORK!!! by topsy23(op): 10:12pm On Aug 21, 2016 |
We are here to give you the best. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 12:19pm On Aug 21, 2016 |
|
Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 12:07pm On Aug 21, 2016 |
Thanks for your call |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 8:43am On Aug 21, 2016 |
Excuzeme: I read on this Nairaland that you worked on Maverick's thread and there were issues back then that required some Elders to intervene and that is why l quoted the poster. The Aluminium man who did his windows also mentioned you among others, in that quote l made above. I know you have settled and some of the posts have been edited to reflect that, that is a nice thing as a Contractor cannot afford to take a strong point on issues, in public.
Read it here if still unsure: https://www.nairaland.com/2423617/professional-touch-aluminium-fabrication-windowsdoorsrails/30
As to Electrician/Engineer/Electrical Engineer, it is all Titles. 
But you know this is online, unless you say so, l cannot assume you are a qualified, COREN-Registered Electrical Engineer. Some people here have claimed Building Engineer when they are no where trained and qualified as such or should we now be asking to see people's Graduation Certificate and COREN registration number? But l know that you do the job of an Electrician (by definition), as l have seen that in your posts. Yes we do electrical installation, I have checked Adeekiti thread he only mentioned some people that worked on maverick site had issues with him but am not among oooo. I knw the man that did the electrical installtions and I do go there to check his work then during piping and wiring stages. I and maverick are friends and no issue between us Thanks |