Properties › Re: Contact Us For Your Electrical/mechanical(plumbing) Design And Installation by topsy23(op): 5:56pm On Aug 11, 2016 |
Call us today.. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 8:51pm On Aug 10, 2016 |
n3xt: More pic and video update on NextHomeBuilds. Boss this is really fantastic.weldone |
Properties › Re: Contact Us For Your Electrical/mechanical(plumbing) Design And Installation by topsy23(op): 3:49pm On Aug 10, 2016 |
New project immediately after the second toll gate. It is a special installation like portharcourt site cos there is no block wall nor decking in this type of project.
|
Properties › Re: CONTACT US FOR YOUR ELECTRICAL AND PLUMBING INSTALLATION WORK!!! by topsy23(op): 8:05am On Aug 10, 2016 |
Let there be light. Thank God r this project
|
Properties › Re: Contact Us For Your Electrical/mechanical(plumbing) Design And Installation by topsy23(op): 11:26pm On Aug 09, 2016 |
!!!! |
Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 8:55pm On Aug 09, 2016 |
Thanks for your and the mail |
Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 8:51pm On Aug 09, 2016 |
Pesuzok: Please also send to me, brighturch@gmail.com
Where can I buy it in Abuja? Mail sent |
Properties › Re: ABB Distribution Board And Schneider Distribution Board Our Choice by topsy23(op): 7:49pm On Aug 08, 2016 |
Our Installation is second to none |
Properties › Re: Contact Us For Your Electrical/mechanical(plumbing) Design And Installation by topsy23(op): 9:50am On Aug 08, 2016 |
Nice week ahead |
Properties › Re: Contemporary Nigeria Building Designs By Hafux Consuls by topsy23(m): 9:48am On Aug 08, 2016 |
darenyx: 9 units of 2 bedroom apartment on a standard plot Love this design boss. More greese to your elbow. |
Properties › Re: Very Important: Builders Pls Get In Here by topsy23(m): 7:34pm On Aug 07, 2016 |
Donchuks023: can a plot of land house a plan of 3units of 1 bedroom flat and a unit of of 2bedroom flat. If yes please can u give me a sketch, thanks Builders and architect will give you more info but a plot of land will accommodate above mentioned |
Properties › Re: CONTACT US FOR YOUR ELECTRICAL AND PLUMBING INSTALLATION WORK!!! by topsy23(op): 7:05pm On Aug 07, 2016 |
Happy sunday |
Properties › Re: Complete Package Design Drawing For Mech, Elect & Plumbing(MEP) with COREN Seal by topsy23(op): 7:03pm On Aug 07, 2016*. Modified: 6:18pm On Aug 11, 2016 |
rotecch77: Oga topsy long time ,how work Boss..........I hail ooooo. How is work? |
Properties › Re: Complete Package Design Drawing For Mech, Elect & Plumbing(MEP) with COREN Seal by topsy23(op): 2:38pm On Aug 07, 2016 |
Call us today for a package M&E design drawing |
Properties › Re: Importance Of Proper Earthing And Bonding System In Electrical Installation by topsy23(op): 7:01am On Aug 07, 2016 |
Do a proper earthing today and be rest assure of your installation |
Properties › Re: ABB Distribution Board And Schneider Distribution Board Our Choice by topsy23(op): 6:53am On Aug 07, 2016 |
Call us today |
Properties › Re: CONTACT US FOR YOUR ELECTRICAL AND PLUMBING INSTALLATION WORK!!! by topsy23(op): 10:44pm On Aug 06, 2016 |
Thanks for calling |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 7:36am On Aug 05, 2016 |
allCopacetic: [color=#550000][/color] Across the three phases. There are some equipments that use three.phase and an earth connection with no neutral Yes u are right!!! |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 6:25am On Aug 04, 2016 |
|
Properties › Re: CONTACT US FOR YOUR ELECTRICAL AND PLUMBING INSTALLATION WORK!!! by topsy23(op): 10:01pm On Aug 03, 2016 |
Call us toda |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 7:16pm On Aug 03, 2016 |
danowena: Talking of DP.This is in my apartment. What do u think? Cc: allCopacetic, mavverick , topsy23,EgunMogaji, Are you talking about double pole(DP) switch for AC and water heater? |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 3:01pm On Aug 03, 2016 |
mavverick: Hello Topsy,
Just looking at my electrical documents, there are about 11 pages of them. The design you talked about, is it the one that specifies how the load should come into the building, so when I open one page I see something about a gear switch first, change over meter,change over etc.
One of them also states the lighting points, size of cables to be buried underground etc, smoke alarm location, 1G or 2G switch . I think its the electrical design diagram but want to be 100% sure. The first page contains signs and symbols etc. Its hard for me to read as I have to keep referring to the first page to see what each symbol means.
Lastly, what is the importance of gear switch if have everywhere metered, and each meter has an isolating switch/fuse anyway. I contracted the drawing out to my architect to do at the time, I am guessing he has his electrical people that he uses as I remember then that one of the guys he uses was delaying the drawings, are you saying that in future, the electrician who is going to do the job should be the one doing the electrical design drawing ? Boss the design am talking about is the electrical design drawing that include the following; Lengend(symbols) Lighting Layout Power layout(Socket, TV point, AC power position, distribution board position) External Light Cable route layout. Electrical room Layout Electrician don't know how to design, Engineers normally does the design with the use of autocad but a good electrician should be able to read and understand electrical design drawing in order to work with it. Being an electrical engineer gave me the priviledge to know both electrical design, plumbing design and HVAC design. I have done it for many Nairalanders. Am presently doing a course on ducted AC design for a multi-story/high rise building. No knowledge is lost |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 1:27pm On Aug 02, 2016 |
allCopacetic: Look closely Its 72 + 20 The 20 coils of 1.5mm green are listed separately (numb 3) The 1.5mm green cable might be earth cable for the 2.5mm. |
Properties › Re: ABB Distribution Board And Schneider Distribution Board Our Choice by topsy23(op): 9:41am On Aug 02, 2016 |
Our recent termination
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 10:21pm On Aug 01, 2016 |
I like having the distribution board at the kitchen, lobby/passage. Store might be too hidden incase of emergency |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 9:49pm On Aug 01, 2016 |
skimanski: My Oga Good day sir, Your boy dey greet you.
Once i receive a drawing with an existing Electrical plan, I first and foremost go through the drawings and then do a layout then adjust the drawings to suit what truly works in relationship to the clients requirements. Mostly, electrical drawings over here are just copy and paste. Put a light somewhere in the middle and points around and sockets switches around. What I do is I dont just locate the light anywhere, I have to think of that person that comes home late at night tired and wants to switch on the light. That guy that wakes up at night and doesn't have to standup to turn off the A.C because its become colder than it already was before he slept. a whole lot of factors come into play. Hence the reason for a layout. The existing plan can just be a Guideline to what the Architect and his team where thinking.
The wall outlets are placed in a way that its easy for who comes into the space when its dark to locate the switch. Be it in the middle of the wall or close to a side.
Now as for DB (distribution Boards), there are few factors your should outline before you decide the location for your house, not necessarily possible that all these factors must checkout, but taking them all into consideration will help decide the best place. Note if these factors together makes you feel your living room is the best place it should be, then put it there and you'd have done nothing wrong.
1- AESTHETICS: Its nice that the DB is out of sight. Not nice to have your DB at a location where your have put some time in trying to make it aesthetically pleasing. Best to be in a Hidden location, like Storage, Hidden rooms or corridors, Box rooms, and better still an electrical room in the house.
2- PROXIMITY TO ITS TWIN: In the case of an added floor/s or a larger area that requires 2 or more DB's, its nice to have then in a location where their linking to each other isn't far off, as you'll have Load bearing wires (16mm size wires). going back and forth in three ways (Three face Light Connection). This will minimize your wire cost as one 16mm Wire these days is N42,000/roll.
3- PROXIMITY TO CONSUMER UNIT: The consumer unit where you have your meter and/or change over locations is also a factor, as you will also not want your DB to be too far from that location, because thats the location where the Power source gets into the house and its from that location the house pics up the power. So to Help minimize the cost of wiring (16mm wires) as well, that should be looked into. Well said, the location of the distribution board should be hidden in such a way that it will not be visible by the visitors. Location of switches is one of key point to be noted when doing electrical installation. Switches must not be located at the of the door. That is why electrical design drawing is very important during installation. But in a situation whereby there is no electrical design drawing, Architectural drawings should to be studied strictly and understand the doors openings. |
Properties › Re: Construction Ofsemi-detached Twin Duplex And Restructuring Of Bungalow In Magodo by topsy23(m): 1:50pm On Aug 01, 2016 |
weldone, very fast project |
Properties › Re: CONTACT US FOR YOUR ELECTRICAL AND PLUMBING INSTALLATION WORK!!! by topsy23(op): 7:54am On Aug 01, 2016 |
Ng external plumbing works...
|
Properties › Re: Contact Us For Your Electrical/mechanical(plumbing) Design And Installation by topsy23(op): 8:38pm On Jul 31, 2016 |
Call us today and enjoy the best of our services |
Properties › Re: ABB Distribution Board And Schneider Distribution Board Our Choice by topsy23(op): 8:26pm On Jul 31, 2016 |
Call us today |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 6:36pm On Jul 31, 2016 |
[quote author=Dominionng post=48062318][/quote]Weldone my oga Dominionng. We ve started fixing the LED light on this project. The light arrived Lagos 2weeks ago |
Properties › Re: The LED Evolution: Revolutionizing Lighting by topsy23(m): 8:23am On Jul 31, 2016 |
Good idea brother.....my concern these days is the chaina made LED light that are flooded in nigeria market. There is a panel LED light I bought from Locks&Switches at Lagos island, one LED of 220mm diameter is N12,800 |