Re: Power Supply To Reach 9000MW Soon – Presidency by addey(m): 12:22pm On Aug 14, 2012
Kobojunkie: [size=14pt]National Integrated Power Project[/size]


The NIPP was planned as a ‘Fast Track’ Project with 7 Power Stations conceived by the immediate past President Olusegun Obasanjo's Administration of the Federal Government of Nigeria to address the twin issues of low power generation and gas flaring from oil exploration in the Niger Delta region.

Power plants planned include:

1) Ihovbor Power Station Benin, Edo State with the capacity of 4 x 125MW

2) Calabar Power Station, Cross River State with the capacity of 5 x 125MW

3) Egbema Power Station, Imo State with the capacity of 3 x 125MW

4) Gbarain Power Station, Yenagoa, Bayelsa State with the capacity of 2 x 125MW

5) Sapele Power Station, Delta State with the capacity of 6 x 125MW

[size=13pt]Project Parties[/size]

Employer: Ministry of Energy (Power) Niger Delta Power Holding Company

Design Consultant: Lahmeyer/Otis Engineering (International/Local)

Project Consultancy: SeWa/AETS (APTEC Engineers Technical Services)- International/Local

EPC Contractor (BOP): Consortium of Marubeni Corporation of Japan and Marubeni (West Africa) Limited

OEM Contractor: General Electric Corporation of U.S.A

Commencement Date: 20th December 2005

Estimated Completion Date: 19th December 2008 (24 months Project Execution Period & 12 months Defect Liability Period) EPC Contractor (BOP)

[b]Commencement Date: [/b]16th February 2006 Estimated completion Date: 15th December 2007(22 months Project Execution Period)

This project was conceptualised as an intervention project to comprehensively address the state of electricity infrastructure in Nigeria. It is designed as a fast-track approach to improving the country‘s electricity power supply through the implementation of Generation, Transmission, Distribution and Gas Supply projects.

The main thrust of the project is the design, manufacture and supply of seven new Gas Turbine Power Plants with the provision for conversion to combined-cycle operation.
SeWa (previously STEAG Encotec West Africa) and APTEC were contracted as one of the Project Consultants of the Federal Government (Ministry of Power) for the power plants being built. The following are the services rendered:

i) Assist in EPC Contract Award

ii)Engineering design vetting

iii)Procurement Monitoring and Acceptance (FAT)

iv)Site erection supervision

v)Project management Owner’s Engineer duties

vi)Pre-commissioning and commissioning approval
vii)Technical support during Defects Liability Period (12 months)

Aptec Engineers Nigeria Limited (AENL)and Steag Encotec West Africa (SeWA) is the Consultant to the Power Holding Company of Nigeria (PHCN)The parent body of the NIPP. PHCN started several power projects in 2004 to comprehensively address the state of the electricity infrastructure in the country with open cycle power plants. The Phase II Power Projects in Nigeria consisted of an extension of four Open Cycle Power Plants under construction to Combined Cycle plants.

After several technical studies were completed, the project changed course to increase power output and improve thermal efficiency. After several adjustments, the total additional Phase II power plant output will contribute to increase total generation in Nigeria by 2,430MW.
SeWa was also contracted as Consultant by Power Holding Company Nigerian (PHCN) for the extension to combined cycle of four plants built under Phase I.

The following are the services rendered:

Review of Contractor’s Technical and Financial proposals
Advise on adequacy of Contractor’s Technical proposal
Negotiate total Phase II budgetary price
Recommendation of Phase II Project Cost
Represent Client as Owner’s Engineer
Preparation of Contract Documents

The Ministry of Power working with various engineering companies is supporting this national presidential vision and initiative.
For clarification, SeWa and APTEC are individual companies sharing some management and financial resources. APTEC is incorporated both in Nigeria and UK.

http://en.wikipedia.org/wiki/National_Integrated_Power_Project

How are they going to transmit the cos our transmission line can only take 7,500MW
Our Gov.is built on lies, when they give us light for a night dey will start to sing and people don't know where we really need power is in the Industries.
Re: Power Supply To Reach 9000MW Soon – Presidency by adebayo111: 12:49pm On Aug 14, 2012
You people are here talking about generation, what about distribution and maintenance of existing transformers and poles
Re: Power Supply To Reach 9000MW Soon – Presidency by Kobojunkie: 12:51pm On Aug 14, 2012
addey:

How are they going to transmit the cos our transmission line can only take 7,500MW
Our Gov.is built on lies, when they give us light for a night dey will start to sing and people don't know where we really need power is in the Industries.

Again, note these projects were started back in 2006. So in the last 6 years, we may have started some projects to solve that problem, I would expect. I have not been keeping up entirely with that end of things as much of what we have gotten has been lectures on how that needs to be resolved but little information on what the government has actually done to do so in all that time.
Re: Power Supply To Reach 9000MW Soon – Presidency by morgstreme: 1:12pm On Aug 14, 2012
PHCN DONT talk about it;be about it!
Re: Power Supply To Reach 9000MW Soon – Presidency by BeraBera(f): 11:58am On Aug 15, 2012
Up NEPA

(1) (2) (3) (4) (5) (6) (Reply)

Oba Of Lagos Lock Up Idumota Traders Shop,orders Them 2Go To Ambode's Rally-pics / Governor Okowa Dances As Harrysong Performs / CDHR: FG's Shoot-On-sight Order Is Useless If Soldiers Do not March Into Forests

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 16
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.