Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by abyte: 11:49pm On Apr 02, 2013 |
Not to beat a dead horse but N40M naira for 5 units is N8M per unit. Is that to finished - move in condition? Sinks, bath tubs fixtures etc? If not what do you envisage per unit finished? Thanks. |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:54am On Apr 03, 2013 |
Bros forget that 40m....as it stands now I will said the 40m will do for carcass, probably with 5m left over hence 35m for carcass....will get back to u as regard actual bill later |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by abyte: 8:38am On Apr 03, 2013 |
segcy.moor: Ah. Thank you. |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by tlops(m): 5:10pm On Apr 03, 2013 |
following.. |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 9:22pm On Apr 03, 2013 |
segcy.moor: |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 8:06am On Apr 04, 2013 |
segcy.moor: |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:07pm On Apr 04, 2013 |
segcy.moor: |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 8:44am On Apr 05, 2013 |
Monring |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 10:39pm On Apr 05, 2013 |
abyte: Not to beat a dead horse but N40M naira for 5 units is N8M per unit. Is that to finished - move in condition? Sinks, bath tubs fixtures etc? If not what do you envisage per unit finished? .....The review contract sum for this particular project is; 70m. However, it's due to the fact that we spent fortune on the foundation.....13m alone on the foundation |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by X2X(m): 9:46am On Apr 06, 2013 |
So what was the original contract sum? You mentioned 40m somewhere. Is it right that the contract sum jumped from 40m to 70m? I find that very worrying. |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 3:10pm On Apr 06, 2013 |
X-2-X: ...pls take time to study d trend. d design for 40m and 70m is here u can see d different....we ve review d concept drastically |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 10:02pm On Apr 06, 2013 |
Construction of parapet wall
|
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 8:35pm On Apr 07, 2013 |
Electrical fixxing
|
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:31pm On Apr 08, 2013 |
construction of soakaway
|
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 9:53pm On Apr 09, 2013 |
work in progress |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by Nobody: 7:15am On Apr 10, 2013 |
segcy.moor:is it just this one box that will handle the waste of the whole building? |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by Aventures(m): 9:24am On Apr 10, 2013 |
blink182: is it just this one box that will handle the waste of the whole building? LOL Ooooooo. this is septic tank concrete in progress...... |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 12:53pm On Apr 10, 2013 |
blink182: is it just this one box that will handle the waste of the whole building?No sir...we intend to do about 3 of it |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 9:36pm On Apr 10, 2013 |
segcy.moor: |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by lovetosin: 12:47am On Apr 11, 2013 |
SEGCY BABA.. IS A GOOD IDEA TO DRAW YOUR ELECTRICAL CABLE IMMEDIATELY AFTER THE PIPPING,BEFORE PLASTERING AND WHY SO,THANKS. 1 Like |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 10:17pm On Apr 11, 2013 |
that is ideal to avoid wall breakage. all must ve being set prior plastering |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 10:00am On Apr 12, 2013 |
....prior to plastering 1 Like |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 3:43pm On Apr 12, 2013 |
Thank God..it's Friday |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 9:37pm On Apr 13, 2013 |
work in progress
|
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 12:23pm On Apr 14, 2013 |
I have a sad experince precisely last months. some followers of our thread invited me to their site to confirm their Contractor competence. (one is already plastering and the other is about to roof)The two site in question is located within Sangotedo area of Ajah. Now, my concern is, with that level of development I wonder what can one do or do you expect me to be blunt and ask them to pull the structure down. God forbid! 'Akin gbo buburu lenu abore'. You can imagine a structure with span of about 40m to build the decking without beam, the raft beam in swamping area with 12mm up in reinforcement arrangerment, 8mm size of steel as ring with interval of 500mm . Even in another site where beam is being used, 12mm was used as against 16mm, the size of elecrical wire...poor plastering work. My fellow NL, you see, in Building construction things were not suppose to be done anyhow, we have types of steel and each size has their purpose, their is certain ratio for concrete mixture,either u increase or decrease the quantity have negative effect. Even the type of sand used matters alot. My advise:Ensure you comfirm the competence of your 'Builder' from the onset because unlike cars, Building is not something you can amend, I mean structurally.....Their are 'Builders' and their are 'Builders'. we are not claiming to be the best in this industry but the matter is very simple. Having build in accordance to Standard Building regulation code, which we have used to with lenght of experince in these field...I wonder who can prove us wrong 3 Likes |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 5:25pm On Apr 15, 2013 |
design step
|
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:43am On Apr 16, 2013 |
!! |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:49pm On Apr 16, 2013 |
Pls follow the finishing work for this project if interest. The asking price;50m |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by mufutau55(m): 8:40pm On Apr 16, 2013 |
segcy.moor: Are you kidding! I am following every drop of it.. One day when KWAM1 started yelling my name as "Too Much Money" you will need to do something like this for me. Keep that in mind. Hajji Mufutau 2 Likes |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by ahf(m): 8:02am On Apr 17, 2013 |
segcy.moor: Sir, this step design seems a new style, can please shed more light on it? picture of the final look? going to cast it? |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 8:42pm On Apr 17, 2013 |
As usual it's our style to build with touch of different from the crowd....it's not casting, no concrete work whatsoever. pls watch out! 1 Like |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 8:57pm On Apr 18, 2013 |
mufutau55: |
(1) (2) (3) ... (7) (8) (9) (10) (11) (12) (13) ... (101) (Reply)
Prices For These Paints / How Large Is 'A Plot' Of Land? / Best Architectural, Interior And Construction Works
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 36 |