Julius Berger Begins Work On Second Niger Bridge by write2obi(m): 7:34am On Jun 25, 2013

Work on the long-awaited second Niger bridge has commenced. Wolfgang Goetsch, Managing Director of Julius Berger stated this at the 43rd annual general meeting of the company in Abuja.

Goetsch also said the Federal Government had given Julius Berger a letter of intent, which would enable it to do preliminary work such as, soil testing and engineering design.

According to him, the bridge is to be built under the private public partnership arrangement.

Goetsch said: “A consortium that included a company from South Africa participated in the bidding for the project. In January 2013, our group became the preferred bidder. We are excited because it will be the first of its kind in Nigeria”.
Niger-Bridge-412
He also said mobilization to site for the construction of the 125-kilometre Lagos-Sagamu road will begin in 10 days.

Five lanes are expected to be added to the road. The Build, Operate and Transfer, BOT, arrangement the Federal Government had with Bi-Courtney Highways Services Limited, had been terminated.

At the annual general meeting, Julius Berger declared a profit before tax of N12.34 billion, for the 2012 financial year, as against N9.93 billion recorded in the previous year.

Profit after tax stood at N8.02 billion, as against N4.41 billion, while the company approved an increased dividend of N2.50, resulting in a total gross dividend payment of N3 billion.

This is a marked improvement over that of 2011 fiscal year, which was N2.40 per share. Retired Air Vice Marshal Nura Imam, chairman of the company, said the performance in 2012 increased by 17.7 percent from 2011.

“This commendable achievement is attributable to a number of factors, including the handover of large-scale projects such as the Admiralty Alexander link bridge in Lagos, the Escravos Gas-to-liquids plant, as well as the completion of a major segment of the Lagos-Badagry expressway and several projects in Akwa Ibom State,” he said.


http://www.vanguardngr.com/2013/06/julius-berger-begins-work-on-2nd-niger-bridge/

3 Likes

Re: Julius Berger Begins Work On Second Niger Bridge by Youngzedd(m): 7:51am On Jun 25, 2013
This is no more news because we are use to it. How long is it going to take them to start the work. Damn yit.


1st to comment hunters sorry for occupying your space, try harder next time.
Not a fan of 1st to comment although it's for sale if you need it badly lol.

5 Likes

Re: Julius Berger Begins Work On Second Niger Bridge by UyiIredia(m): 8:05am On Jun 25, 2013
Good move !
Re: Julius Berger Begins Work On Second Niger Bridge by Akshow: 9:29am On Jun 25, 2013
#yawns# Abuja Lokoja express road wey de under their nose them no fit complete am for decades, na second niger bridge remain. lets hope them finish this one sha

2 Likes

Re: Julius Berger Begins Work On Second Niger Bridge by Nobody: 3:37pm On Jun 25, 2013
Space booked grin
Re: Julius Berger Begins Work On Second Niger Bridge by fortmedi: 3:37pm On Jun 25, 2013
great
Re: Julius Berger Begins Work On Second Niger Bridge by supaeagles(m): 3:38pm On Jun 25, 2013
godjohnson: Space booked grin
na wa for all these space bookaz .... make Oga mod no vex for you oh - he neva chop today grin
Re: Julius Berger Begins Work On Second Niger Bridge by IB5(f): 3:39pm On Jun 25, 2013
Let us know when they complete it.

4 Likes

Re: Julius Berger Begins Work On Second Niger Bridge by DICKtator: 3:39pm On Jun 25, 2013
Hope they would be able to complete it and it would not turn out to be an abandoned project if GEJ is thrown out of Aso Rock to Otuoke? One major problem of change in baton is the successor neglecting the agreement made by his predecessor in order to rubbish his antecedents.
grin grin grin grin
Re: Julius Berger Begins Work On Second Niger Bridge by yuzedo: 3:39pm On Jun 25, 2013
Skeptical.. For now.

1 Like

Re: Julius Berger Begins Work On Second Niger Bridge by Chillypelly(m): 3:40pm On Jun 25, 2013
Akshow: #yawns# Abuja Lokoja express road wey de under their nose them no fit complete am for decades, na second niger bridge remain. lets hope them finish this one sha

The abuja-lokoja road you mentioned is executed by dantata, rcc, gitto and bulletine not jb.

2 Likes

Re: Julius Berger Begins Work On Second Niger Bridge by Afrocatalyst: 3:42pm On Jun 25, 2013
Let's see how this plays out.
Re: Julius Berger Begins Work On Second Niger Bridge by Okijajuju1(m): 3:43pm On Jun 25, 2013
PDP









#Fresh Air reached the East..
#Fresh Breeze 2015..
#InJoeWeTrust...

#God Bless Nigeria...

6 Likes

Re: Julius Berger Begins Work On Second Niger Bridge by ezedolar: 3:45pm On Jun 25, 2013
Is a welcome development but is long overdue
Re: Julius Berger Begins Work On Second Niger Bridge by Chillypelly(m): 3:46pm On Jun 25, 2013
I will strongly advise the federal government to try and deliver this project in record time to encourage other investors to engage government in other ppp infrastructure developments. Ultimately, it will accelerate development and send a positive signal to investors to see nigeria as viable investment corridor.
Re: Julius Berger Begins Work On Second Niger Bridge by Bliss4Lyfe(f): 3:46pm On Jun 25, 2013
[size=18pt]2015, GEJ all the way. PDP 2015[/size]

1 Like

Re: Julius Berger Begins Work On Second Niger Bridge by Majikals(m): 3:46pm On Jun 25, 2013
Make work continue,
Re: Julius Berger Begins Work On Second Niger Bridge by WIZGUY69(m): 3:46pm On Jun 25, 2013
*i still dey sleep if dem finish am make una come wake me* cry
Re: Julius Berger Begins Work On Second Niger Bridge by ezedolar: 3:46pm On Jun 25, 2013
Election don the reach
Re: Julius Berger Begins Work On Second Niger Bridge by Youngzedd(m): 3:46pm On Jun 25, 2013
I can see the hand work of a moderator on this thread.

Thread modified.

Now I can see the source.
Re: Julius Berger Begins Work On Second Niger Bridge by PHIPEX(m): 3:50pm On Jun 25, 2013
Encouraging news after a long wait, they should have also told us how long it'll take before it's completed.
Re: Julius Berger Begins Work On Second Niger Bridge by OkikiOluwa1(m): 3:53pm On Jun 25, 2013
Good move.
Last Bullet: I hope they complete it in time.
Re: Julius Berger Begins Work On Second Niger Bridge by Nobody: 4:03pm On Jun 25, 2013
Na dis bridge idey wait for since. I can now go ahead and order for a morano. GEJ dey work Buhari dey throw bomb Tinubu dey............

1 Like

Re: Julius Berger Begins Work On Second Niger Bridge by GAR3TH(m): 4:07pm On Jun 25, 2013
The title is misleading, the only thing JB did is receive a letter of intent from the gov for winning the Bid. They said they are now doing soil sampling and have just started the engineering drawings /design of the bridge. So Nigerian journalism, tell me how they can start construction of the bridge when they haven't even finished the engineering design construction document? The bridge is months, if not years away from construction.

Misleading titles just to get your website views is pretty low.

5 Likes

Re: Julius Berger Begins Work On Second Niger Bridge by Realdeals(m): 4:11pm On Jun 25, 2013
[size=14pt]Soil Testing and Engineering Design till..........2015[/size]

2 Likes

Re: Julius Berger Begins Work On Second Niger Bridge by babylawyr(f): 4:11pm On Jun 25, 2013
Are we going to be paying toll on this too? YES/NO.

We need to know, as that will determine whether or not we rejoice at this development. undecided
Re: Julius Berger Begins Work On Second Niger Bridge by EkoIle1: 4:12pm On Jun 25, 2013
Why is this not a direct contract award with money on the table for JB to build the bridge from start to finish and get it over with? Why is this based on a common letter of intent and tolling on behalf of JB to recoup construction cost?

Basically, JB is building this bridge and not the FG.

What's wrong with their local and National leaders back east? They don't have enough power or influence to make the FG put money on the table and straight award the contract with firm completion date minus tolling and if they must toll, at least redirect the collected tolls to the region for maintenance and other construction activities?

All that aside gan sef, the real joke is the looming capital flight and fleecing of the potential end users of the bridge via decades of tolling with zero returns to the region.

With so much noise regarding this bridge and after years of begging, there's still no serious intentions on the part of the FG and the SE leaders to get this taken care of pain free and on time..



GEJ is Janging SE all over again...
Re: Julius Berger Begins Work On Second Niger Bridge by EkoIle1: 4:15pm On Jun 25, 2013
baby lawyr: Are we going to be paying toll on this too? YES/NO.

We need to know, as that will determine whether or not we rejoice at this development. undecided



You are going to be tolled because JB is funding the bridge and not the FG hence JB tolling you for decades to recoup their money..
Re: Julius Berger Begins Work On Second Niger Bridge by badmeat(m): 4:20pm On Jun 25, 2013
I know the boko infested dudes will still criticise,but uncle joe is putting dem to shame one by one,grin
Re: Julius Berger Begins Work On Second Niger Bridge by Garrithe1st: 4:23pm On Jun 25, 2013
Federal Government had given Julius Berger a letter of intent, which would enable it to do preliminary work such as, soil testing and engineering design...

So a letter from FG = Commencement of work...abi??

grin cheesy grin

3 Likes

Re: Julius Berger Begins Work On Second Niger Bridge by Abbott(m): 4:26pm On Jun 25, 2013
Why do I feel that the relentless criticism and constant comparison between GEJ and BRF actually spurred the FG to start the SNB? It is a curious thought.

1 Like

(1) (2) (3) (4) (Reply)

Are We Mistaking BokoHaram's Gradual Invasion As Fulani Herdsmen? / Juliet Ibekaku-Nwagwu In Trouble Over Funds Diversion - Daily Independent / How We Conquered Hackers From Asia – INEC

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 29
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.