Nairaland Forum / Nairaland / General / Politics / Tell Julius Berger To Get Serious On Lagos-ota-abeokuta Expressway — Motorists (14750 Views)

Abiodun Declares A State Of Emergency On The Lagos-Sango Ota-Abeokuta Road / Street Traders, Touts Frustrating Lagos-Ota-Abeokuta Road Project – Federal Govt / FG Hands Over Lagos-ota-abeokuta And Other Roads To Lagos State And Ogun State. (2) (3) (4)

(1) (2) (Reply) (Go Down)

Tell Julius Berger To Get Serious On Lagos-ota-abeokuta Expressway — Motorists by mrakeli62: 5:58am On Apr 07, 2019
Ten months after the Federal Government re-awarded contract for the rehabilitation and reconstruction of the Lagos-Ota-Abeokuta Expressway, the job has been going on at snail’s pace.Despite the presence of the contractor- Julius Berger Plc. on site, the motion without movement scenario playing out there has simply made the road to go from bad to worse with motorists being the worst hit.

It would be recalled that the Federal Ministry of Power, Works and Housing on May 14, 2018 officially inaugurated the rehabilitation of the road, which is valued at N22. 387b. The Director, Federal Highways, South West, Olalekan Busari, while briefing journalists during the flag-off said the total rehabilitation starts from Ile Zik Bus Stop at kilometre zero, up to kilometre 80 in Ogun State, where a brewery is located.

“The project was divided into two sections, the first section, which starts from Ile Zik in Lagos State spans about 20 km, while the second section, which falls in Ogun State is 60km.“It is a complete total rehabilitation of the entire road this time around and it is awarded at N22.387b, and for a contract period of two and half years, which we hope the contractor will actually deliver,” he said.

Prior to this period, the project, which started in 1999 suffered several setbacks after the first contract was awarded in 2000.The first section was for the rehabilitation of the Ota-Abeokuta section, which was awarded to the same contractor in 2009.The Guardian observed that for sometime now, Julius Berger has practically remained on the spot at Owode-Iyana/Ilogbo axis, while scant attention is paid to other parts, which are fast becoming dead-traps to motorists. Even the palliatives applied last year on the road have been washed away by rain.

Currently, the gridlock on different sections of the road seems to have defied solutions, and so put a heavy toll on road users. Now, the journey from Sango to Ifo, which should be about 20 minutes takes between two or three hours. Whether in the morning or at night, road users are always subjected to painful and frustrating experiences, and this has forced many to seek alternative routes.

Currently, the most terrible spots along the road are Joju Junction; Conoil Junction, Ijako-Tipper, Owode, Iyana-Ilogbo, Ilepa, Techno Bus Stop, Iyana-Shebik, Itori Bridge, and Obada-Oko, among others. Vehicular traffic is always at a standstill in these areas, and this always leaves policemen and traffic control officials helpless. Recent heavy downpours have worsened the state of the road as areas like Joju Junction, Ijako and the site of the ongoing construction work at Owode were waterlogged.

Consequently, passengers are often stranded in those areas for hours as traffic is usually at a standstill. Recently for instance, vehicular traffic stretched from Sango Motor Park, over the bridge up to Joju, forcing impatient motorists to drive against traffic, a decision that worsened the situation.At Owode, floodwater from the side under construction, which has been cordoned-off by the contractors, took over the entire axis worsening the traffic situation.

A commercial driver, Olumide Kasali, who lamented the predicament of road users on the axis, accused the Federal Government of failure to monitor the project after the media hype that greeted the contract award.“It is disappointing to see that Julius Berger has stayed on a spot since it started work on the road. Even though proper construction of the drainage is essential in the Owode area because of the nature of the place, many people are of the view that the company should make haste and move to other locations in order to finish the job on schedule.

“The present state of the road is actually affecting our business, and that is why a good number of commercial drivers that hitherto plied this route have abandoned it. The few of us that are still here are taking serious risks because our vehicles are taking a hit.”Mr. Ayinde Onibudo, a civil servant, who resides in Pakoto in Ogun State, but works in Lagos, described the state of the road as dilapidated. He said: “Julius Berger should get serious with what it has to do before the rain starts. We that live around this flank and ply this road daily have suffered enough on it. Most times we get to work late and get queried. So, we are appealing to Julius Berger to get serious.

“This journey I’m embarking on, ordinarily should not take more than 30 minutes, but because of the poor state of the road, it now takes an average of three hours, and I fail to understand why the contractor has failed to move away from the spot it has been all this while. The funny aspect of it is that during public holidays when the road is reasonably free, the contractor will also be on holiday; they work like civil servants.”

While several posers raised regarding the slow pace of work have remained unanswered about a year after the contract review, The Guardian reliably gathered that the said N3.5b “released” by government was a ruse, as what has actually been released so far falls far below the said amount.

The Deputy Director, Federal Ministry of Works, Power and Housing in Ogun State, Olukayode Popoola, in an earlier interview with The Guardian claimed that all the bad portions, which contributed to incessant gridlock on the road have been patched by the contractor.“As per the Owode axis, what they are doing there is a permanent work that cannot be finished in one or two days. That is why they have remained there. The slow pace of the job is due to the Nigerian factor. The challenge right now is the budget, which has not been passed. By the time the budget is passed, money would not be problem for the contractors.” He, however, confirmed that the contractor did not get the entire N3.5b allegedly released to it as mobilisation fee, saying, “what was released to the contractor wasn’t up to N3.5b, but government is still working to complete the payment.

https://www.akelicious.net/2019/04/tell-julius-berger-to-get-serious-on.html

1 Like

Re: Tell Julius Berger To Get Serious On Lagos-ota-abeokuta Expressway — Motorists by youngestuk(m): 6:05am On Apr 07, 2019
grin
Just tired of this country.

7 Likes 1 Share

Re: Tell Julius Berger To Get Serious On Lagos-ota-abeokuta Expressway — Motorists by Kreamie(m): 6:08am On Apr 07, 2019
Your government are the unserious ones tbh

15 Likes 2 Shares

Re: Tell Julius Berger To Get Serious On Lagos-ota-abeokuta Expressway — Motorists by Mightymanna(m): 6:08am On Apr 07, 2019
the contractor has migrated to Kano-Zaria-Kaduna-Abuja expressway work is moving at the speed of light here.

please tell those motorist to chill

6 Likes

Re: Tell Julius Berger To Get Serious On Lagos-ota-abeokuta Expressway — Motorists by olaolulazio(m): 6:08am On Apr 07, 2019
grin grin
Re: Tell Julius Berger To Get Serious On Lagos-ota-abeokuta Expressway — Motorists by somadinho10: 6:10am On Apr 07, 2019
They are more concentrated at the second Niger bridge... Serious work going on dia

3 Likes

Re: Tell Julius Berger To Get Serious On Lagos-ota-abeokuta Expressway — Motorists by morikee: 6:11am On Apr 07, 2019
Yeah tell them
Re: Tell Julius Berger To Get Serious On Lagos-ota-abeokuta Expressway — Motorists by Alamu1111: 6:12am On Apr 07, 2019
Ok let me call them now
Re: Tell Julius Berger To Get Serious On Lagos-ota-abeokuta Expressway — Motorists by NigerDeltan(m): 6:14am On Apr 07, 2019
Its due to poor funding not their fault

In 2023 you will be hearing vote for APC so we can complete lagos-ibadan road

10 Likes

Re: Tell Julius Berger To Get Serious On Lagos-ota-abeokuta Expressway — Motorists by uchwar1: 6:18am On Apr 07, 2019
All Promises C......
Re: Tell Julius Berger To Get Serious On Lagos-ota-abeokuta Expressway — Motorists by Ay77(m): 6:19am On Apr 07, 2019
I Know much about this project you're talking about .. the problem is not from Berger. It's our government who Lost it's priority. I did my industrial training in that yard Along Lagos Abeokuta expressway

8 Likes

Re: Tell Julius Berger To Get Serious On Lagos-ota-abeokuta Expressway — Motorists by TOPCRUISE(m): 6:19am On Apr 07, 2019
That road hehn. It just shows the level of favourism shown to contractors. If the contract is truly awarded, then Julius Berger are not capable of any construction job. They are the worst construction company in the world. Politics is what they use to collect contract job from government. Nigeria can't be this worse to view Julius Berger as the only company capable of doing a job worth monumental value who are not committed in delivering it at the expected time

4 Likes 2 Shares

Re: Tell Julius Berger To Get Serious On Lagos-ota-abeokuta Expressway — Motorists by Jabioro: 6:22am On Apr 07, 2019
The money has been shared...na abrakadabra remain.
Re: Tell Julius Berger To Get Serious On Lagos-ota-abeokuta Expressway — Motorists by EternalBeing: 6:25am On Apr 07, 2019
Eko o ni baje o!
Re: Tell Julius Berger To Get Serious On Lagos-ota-abeokuta Expressway — Motorists by luvme0702: 6:29am On Apr 07, 2019
You don't expect Julius Berger to use their own money to fix the road. Let government pay up and you'll see the speed they'll use to finish up.

10 Likes 2 Shares

Re: Tell Julius Berger To Get Serious On Lagos-ota-abeokuta Expressway — Motorists by melanch(m): 6:31am On Apr 07, 2019
The problems with this country are bad roads, poor power supply and poor education. When they are tackled, watch how other sectors play along.

I create beautiful websites for N25k. Call or WhatsApp me 07085013051

1 Like

Re: Tell Julius Berger To Get Serious On Lagos-ota-abeokuta Expressway — Motorists by RichBoy247: 6:35am On Apr 07, 2019
TOPCRUISE:
That road hehn. It just shows the level of favourism shown to contractors. If the contract is truly awarded, then Julius Berger are not capable of any construction job. They are the worst construction company in the world. Politics is what they use to collect contract job from government. Nigeria can't be this worse to view Julius Berger as the only company capable of doing a job worth monumental value who are not committed in delivering it at the expected time

Maybe Biafran Construction Coy can do it better.

2 Likes 1 Share

Re: Tell Julius Berger To Get Serious On Lagos-ota-abeokuta Expressway — Motorists by wethebest(m): 6:37am On Apr 07, 2019
Ok
Re: Tell Julius Berger To Get Serious On Lagos-ota-abeokuta Expressway — Motorists by EbizCoachNg2: 6:40am On Apr 07, 2019
luvme0702:
You don't expect Julius Berger to use their own money to fix the road. Let government pay up and you'll see the speed they'll use to finish up.


Gbam grin

1 Like

Re: Tell Julius Berger To Get Serious On Lagos-ota-abeokuta Expressway — Motorists by Chinashopping84: 6:43am On Apr 07, 2019
In other developed countries of the world the road would cost less and done within a short period.

3 Likes 1 Share

Re: Tell Julius Berger To Get Serious On Lagos-ota-abeokuta Expressway — Motorists by chukxie(m): 6:54am On Apr 07, 2019
Until Nigerians start protesting (physically, not on social media) our government would keep having a field day. Until we starting taking to the streets (without violence) like the Algerians are doing with regards to them not wanting Bouteflika as their president, nothing meaningful would be achieved in our lifetime. I rest my case.

7 Likes

Re: Tell Julius Berger To Get Serious On Lagos-ota-abeokuta Expressway — Motorists by seunmsg(m): 6:55am On Apr 07, 2019
Julius Berger is overhyped. Give that same road to RCC and see good result in less than six months.

2 Likes

Re: Tell Julius Berger To Get Serious On Lagos-ota-abeokuta Expressway — Motorists by Myde4naija(m): 6:56am On Apr 07, 2019
youngestuk:
grin
Just tired of this country.
you mean you are tired of yourself

1 Like

Re: Tell Julius Berger To Get Serious On Lagos-ota-abeokuta Expressway — Motorists by BankyGee(m): 6:57am On Apr 07, 2019
Yes this is a country an area sad
Re: Tell Julius Berger To Get Serious On Lagos-ota-abeokuta Expressway — Motorists by Platony(m): 7:06am On Apr 07, 2019
They shouldn't blame Berger concerning d delay, rather they should blame d govt.

Same thing is happening in Yenagoa at Isaac Boro Expressway.

Only God knows when that project will be completed, Govt keep delaying their pay (JB).
What then does d masses expect, mk JB use their own money they do project? I pray!!!!

Me, na workman I be, if u delay payments or u dey pay me like say na beg I dey beg u d money, na so ur job sef go dey stroll. grin

1 Like

Re: Tell Julius Berger To Get Serious On Lagos-ota-abeokuta Expressway — Motorists by aigbokiejohnson(m): 7:08am On Apr 07, 2019
Same scenario playing out on Lagos/Ibadan express way. RCC is a more serious outfit

5 Likes 2 Shares

Re: Tell Julius Berger To Get Serious On Lagos-ota-abeokuta Expressway — Motorists by slimfit1(m): 7:13am On Apr 07, 2019
Fashola is not monitoring anymore.

1 Like 1 Share

Re: Tell Julius Berger To Get Serious On Lagos-ota-abeokuta Expressway — Motorists by amaniro: 7:24am On Apr 07, 2019
Mightymanna:
the contractor has migrated to Kano-Zaria-Kaduna-Abuja expressway work is moving at the speed of light here.

please tell those motorist to chill



Abuja kaduna road zero progress.undecided

1 Like 1 Share

Re: Tell Julius Berger To Get Serious On Lagos-ota-abeokuta Expressway — Motorists by alphanyx: 7:25am On Apr 07, 2019
Abeg make you organise and lead the protest.
Re: Tell Julius Berger To Get Serious On Lagos-ota-abeokuta Expressway — Motorists by adioolayi(m): 7:28am On Apr 07, 2019
Julius Berger again I dont know why the projects they handle always have bad impact on the environment during their construction works. Look at their pace of work and untold hardship on Lagos-Sagamu interchange end of Lagod-Ibadan expressway.....Compare same with the Sagamu interchange- Ibadan section being handled by RCC...the difference is clear.
Julius Berger needs to do more on implementation of EIA especially on road users during their construction works. I agree, their finished projects are world class...but agony road users go through through their construction works is terrible

6 Likes 1 Share

Re: Tell Julius Berger To Get Serious On Lagos-ota-abeokuta Expressway — Motorists by vioment: 7:30am On Apr 07, 2019
With all the so called graduates including me, we still have to be begging julius berger to build roads for us because we are just daft. How many years have julius berger been doing roads in nigeria with resources from west africa, with nigerian workers. Up until now, those workers did not learn anything tangible; we are now waiting for the new oyibo graduate managing director to come and build roads for us.


This country have decided to be a stark fool.

11 Likes 2 Shares

(1) (2) (Reply)

Abike Dabiri Seeks AU Intervention In Xenophobic Attacks On Nigerians / Police Parade 201 Suspected Looters In Abuja / Sanwo-Olu To Flag Offconstruction Of Opebi-Odo Iya Alaro Maryland-Ojota Bridge

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)