The BOQ or materials/labour can never be overemphasized when it comes to building construction. Apart from helping you budget for your project, it helps you plan and have internal cost control. I'm Engr Ekwueme Arinze 07033544353 frankitangltd@gmail.com
|
Material costs vary from state to states in Nigeria. While a trip of sand costs about #10,000 in Enugu, it goes for as high as #25,000 in Abakaliki. However, crushed stones are brought into Enugu from Ebonyi
|
This bill captured the material and labor estimation based on the sampled drawing. The rates used are applicable to most states in Nigeria.
|
Evaowokotomo:Thank you for the compliment. I've been quite busy lately. Feel free to contact me on 07033544353 or frankitangltd@gmail.com. |
Please contact me on 07033544353 or frankitangltd@gmail.com |
Cont'd With this building and the specifications, he/she can go on with the take-off to work out the materials required in each stage of the project. Typical, Civil projects are categorized into two stages. The Substructure and the superstructure.
|
Enugu, You can reach me on 07033544353 or frankitangltd@gmail.com |
A bill of quantities is a comprehensive breakdown of the materials and labour requirements to execute a defined project. The project can be a building, culvert, pavement etc. The first step to prepare a bill of quantities as to provide the cost engineer or quantity surveyor with a detailed drawing and description of the project. |
The title of my university project is "Feasibility of a filtration adsorption greywater treatment system for developing countries". The treatment processes are sedimentation, filtration, adsorption and disinfection. You should note that using greywater may pose some health challenges for both the farmer and the consumer and depending on the system in use may not be cost efficient. Read the journal here where I used readily available & affordable materials to test the performance of a treatment system and the outcome. https://www.omicsonline.org/feasibility-of-a-filtration-adsorption-grey-water-treatment-system-for-developing-countries-2157-7587-S1-006.php?aid=17406 Feel free to ask any further questions. |
Given the overall dimensions of the plan, it will cost you about 7m. It may vary depending on your choice of finishes. For a detailed breakdown of the materials and labour requirements to execute the project, call or whatsapp 07033544353. I am a civil engineer. |
For Bill of Quantities or Material Estimations of your proposed projects, you can contact me on frankitangltd@gmail.com , 07033544353. |
teemzyomodon0:I am a practicing civil engineer. To be able to estimate the cost of the woodwork, step-tiles roofing sheets and the parapet, I'll be needing the architectural plan. With it I can extract the dimensions of the building and also the height of the roof. With these I can work out what you require. You can reach me on frankitangltd@gmail.com or 07033544353 to continue the conversation. |
If you need a comprehensive materials and labour breakdown for your building project, Contact me on frankitangltd@gmail.com or 07033544353 |
enyiulo:I don't think it's possible. I am a practicing civil engineer and also a building materials estimator. If you already have a building plan for your 20-rooms building, you can reach me on frankitangltd@gmail.com for a materials and labour estimations of your proposed project. |
ShutdownBrown24:Certain factors determine the cost of constructing buildings in Nigeria and they are, 1.The location (Lagos or Enugu) ... Available/affordable construction materials and labour. 2. The size of the building plan. I know you said Two bedrooms but the bedrooms could be of varying sizes. Same is applicable to the living room, the kitchen, dining, closets etc. Hence, it all comes down to your choices. As a rule of thumb, the smaller the building plan, the smaller the cost. Though there are sizes that are deemed standard for optimum comfort while using the spaces. 3. The quality of the finishes. For instance you can get Nigerian tiles for as low as N2,500 per 'sq.m or imported ones in excess of N10k per sq.m. In conclusion, for a modest-sized Two bedroom duplex of a certain square meters of floor area, budget between N5m to N10m depending on the above mentioned factors. For a fully developed building plan, a structural design Drawing and a labour and materials estimation/bill of quantities at an affordable fee, Contact me on frankitangltd@gmail.com or 07033544353. Cheers!!! |
Yes, it can contain the two bedroom duplex. The plot size you stated can also contain a 4bedroom duplex with sufficient space for parking space, Swimming pool And open space for other uses. You can contact me on frankitangltd@gmail.com for a detailed building plan, structural designs and Bill of quantities for your project at an affordable fee. |
couragemath:I am a civil engineer. If you already have a building plan, send it to me @frankitangltd@gmail.com and get a free material/labour schedule. You are welcome. |
110,000 boreholes yielding 330,000MT of water daily. That breaks down to 3MT or 3,000 cubic meters or 3,000,000 liters of water per borehole. Very suspicious data. |
thesicilian:Let them prosecute 398 officers from GEJ admin. I won't fault that as long as come 2019/2023, another administration will prosecute them. This will ensure accountability and transparency. |
I am a civil engineer. Call me for your structural designs on 07033544353 |
[https://www.nairaland.com/4484276/building-project-design-cost-estimation] Go through the link, it has the process broken down. You can also contact me on frankitangltd@gmail.com should you need my services as a cost engineer. |
Get a comprehensive estimate for your building project. Contact me on Frankitangltd@gmail.com
|
Usually, what the Architect needs to be able to do his job is the site plan. However, if the topography of the land is not plain; perhaps it is sloping or has some geologic features exposed on the surface, you definitely need the Architect to see your site so he can blend/adapt his design with the existing environment. |
STAGES IN COST ESTIMATION Whether you are building a poultry pen, a bungalow, duplex, blocks of flats or an overhead water storage structure, the work breakdown structure is similar and are the substructure and the superstructure. The Substructure is the totality of all activities carried out within the soil to the over site concrete. It entails activities like Excavations (trenches and pits) Blockwork (5 inches, 6 inches, 9 inches) concrete works (in: pad footing, strip footing, wide strips, blinding, plinth beam, strap beam, tie beam, column starters retaining walls, rafts, piles etc), the reinforcements (rods in the columns, pad footings etc), formworks (planks, bamboo, timber And falseworks needed as form to pour concrete) earth filling, leveling, watering, compaction and water-proofing application of anti-termite solution etc the substructure is very crucial especially in buildings with suspended floors as any mistake here could adversely affect the lifespan and durability of the building. Hence, it contributes significantly to the cost of the building. The superstructure as the name implies is a compendium of all activities above the soil. From blockwork through lintel to roofing, painting, maintenance checks to handover.
|
COST ESTIMATION After the designs (architectural and structural), the next step is usually to get a cost estimates for your project. Depending on the scale of your project, it is usually advisable to consult the services of an independent estimator who is not going to be one of the contractors/builders. His estimates will serve as a guide in appraising/assessing the quotations of the contractors/builders. However, since building projects are usually budgeted for, it is best to have a particular amount you intend to spend on the build in mind prior to the designs. This prevents you from going into the project blind. With the estimate, you can have an idea of the projects expected cost before plunging in you can see the stages to which you can breakdown (foundation, blockwall-to-lintel, floor slab etc) and their expected costs so you can plan for them. with the estimates also you will be able to control the cost, timing and quality of your project Mrs. V is the mom of one of my club members back in the varsity and I got a call from her back in 2013. She told me that she has a budget of ₦8,000,000.00; that she wants a four bedroom duplex, dining, and two living rooms both upstairs and downstairs and that the master’s bedroom must be in-suite. How did I achieve a floor plan and designs that satisfied her needs? I got the average cost of a modest duplex per square area of floor and predetermined the expected floor area that would likely cost ₦8,000,000.00, then a prepared a floor plan for this calculated square area within appropriate margins. I the project was completed midyear 2014 and within budget. I got a call for a project last year and Mrs. V was the one that recommended me.
|
You can't really avoid mathematics. It is universally true. Applicable in many facets of life. I |
It's been over a week since others received their fidelity bank dividend and am yet to get mine. Please house, how do I go about this? |
Contact me on Frankitangltd@gmail.com to get a comprehensive breakdown of the materials you will be needing. |
Get a Bill of quantities and material/labour estimate for your building project. Contact me on frankitangltd@gmail.com |
For a detailed and comprehensive Bill of quantities (BOQ), Bill of engineering measurement(BEME) and evaluation (BEME) and Material/labour quote contact me on frankitangltd@gmail.com |
For your bill of quantities, bill of engineering measurement and evaluation, material/labour quote contact me on frankitangltd@gmail.com |