₦airaland Forum

Welcome, Guest: RegisterLoginWith GoogleTrendingRecentNew

Stats: 3,326,349 members, 8,426,181 topics. Date: Saturday, 13 June 2026 at 07:24 PM

Toggle theme

Babs612000's Posts

Nairaland ForumBabs612000's ProfileBabs612000's Posts

1 2 3 4 5 6 7 8 9 10 11 12 13 (of 13 pages)

PropertiesRe: 3 Units Of 2 Bedroom Flat: Construction Diary by Babs612000(m): 9:07am On Oct 16, 2015
KolaShangOne:
Roofing. Sheets werec0.45mm, but the angle ridge, eaves angle, bottom flashing, barge board, gutter trimming etc were done with 0.55mm Aluminium.
Woodwork cost 490,000 while Aluminium costs 760,000. Misc-20,000. Total of #1,270,000
Many thanks.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Babs612000(m): 9:24am On Oct 15, 2015
nigeriancuban:
well depending on your specifications..
when I mean specs ,some clients desires different qualities if work and for a client that requires a moderate quality I bet 2.$omething might do
q
Hello are you saying #2 can finished a 4bedrooms bungalow with lower budget,simple designs and normal finishing in Ibadan please kindly break it down for us l am about to start one in Abeokuta soon .
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Babs612000(m): 9:09am On Oct 15, 2015
abouzaid:
can one build a four bedroom all en suite bungalow with two and half million or less? I'm doing a cost analysis and it's looking possible from my analysis. what's your views on that? i would give my analysis later after hearing some of your views. my labourers would be sourced exclusively from the north where labour is extremely cheap and the house would not include any fancy works. details later but lets hear your views first.
Thanks for your post please l am waiting for cost analysis and which type of roofing are you using hope it is not aluminium because that will cost you nothing less than 800k.
PropertiesRe: 3 Units Of 2 Bedroom Flat: Construction Diary by Babs612000(m): 3:23am On Oct 15, 2015
lancee:
Great job sir , can u pls help us with the cost analysis
Good job waiting for the costing as well especially for the roofing.
PropertiesRe: 3 Units Of 2 Bedroom Flat: Construction Diary by Babs612000(m): 5:42am On Oct 12, 2015
KolaShangOne:
This unit of houses has been roofed already..
wow!!! This look lovely .
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Babs612000(m): 1:42am On Oct 09, 2015
twinskenny:
yes sir, thanks. its just a basic three bedroom flat. not serious i will post pics soon grin
please do.
BusinessRe: UBA-ATM Withdrawal Scam by Babs612000(m): 8:16pm On Sep 26, 2015
KolaShangOne:
These kind of charges will discourage cashless policy. How can they charge 11% on one transaction? My bank charges just about 1.1% or so per transaction and some transactions even have a fixes low rate.
Surprised to hear this Nigeria banks are shit corrupt as are leaders.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Babs612000(m): 12:36am On Sep 24, 2015
EgunMogaji:
Just FYI I submitted four in Ibadan.
Many thanks.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Babs612000(m): 12:30am On Sep 24, 2015
mufutau55:
I don't remember very well... but I think it's five (5) copies. Just get ready with 5 copies.

Hajji M.
ok thanks a lots.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Babs612000(m):
kopell:
lagos used to be one of the best city those days, with the traffic now it's chaos. The traffic cost me almost full tank a day to move around when I visit. Traffic is better in Abuja.
Thank you that is why l am running away from Lagos.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Babs612000(m): 10:19pm On Sep 22, 2015
KolaShangOne:
Eiyaaah.. Sorry about that.. Forward march to Oja-Oba then..
Ogas in the house please how many copies of plans do l need to submit to town planing office in Ogun state for approval.
Someone said five copies another person said 4.
Please who is right?
PropertiesRe: Budget Roofing and Finishes of a Nairalanders 2units of 3 bedroom flat. by Babs612000(m): 12:13pm On Sep 21, 2015
KolaShangOne:
Dont make that assumption sir.. It all depends on the size of the 4 bedroom flat.. I will be doing a 4 bedroom flat soon (by Gods grace) and the measurement (22x12) is almost the same with this 2 flats.
Mine is 60ft x 30ft four bedrooms bungalow sir Or (18 x 9)m.
PropertiesRe: Budget Roofing and Finishes of a Nairalanders 2units of 3 bedroom flat. by Babs612000(m): 3:23pm On Sep 20, 2015
KolaShangOne:
Dont make that assumption sir.. It all depends on the size of the 4 bedroom flat.. I will be doing a 4 bedroom flat soon (by Gods grace) and the measurement (22x12) is almost the same with this 2 flats.
Many thanks I will be looking forward to see the 4bedroom you are talking about.
PropertiesRe: 3 Units Of 2 Bedroom Flat: Construction Diary by Babs612000(m): 3:05pm On Sep 20, 2015
sonety2k:
Please what's the total cost for fabricating the 5,500 Blocks ?

And pls send me the Floor plan to my mail address :- sonetauto@yahoo.com

Thanks
Hello do you do German floor for this building ?
PropertiesRe: Cost Of Building A 4 Bedroom Bungalow From Foundation To Roofing by Babs612000(m): 2:25am On Sep 19, 2015
Babs612000:
Hello my Ogas in the house please I am about to start buliding a four bedroom bungalow in Abeokuta please can anyone give me an estimate
From foundation to roofing level I wish to use 0.45 or 0.55mm aluminium for the roofing.
This are the sizes of the house
2 bedrooms has 12 x12 with en-site.
2 """"""""""""""".10 x12 with one bath and one toilet.
Sitting room 14x16.
Kitchen 10x10
Ante room. 8x10
Please do I need to do German floor since most land in Abeouka are solid dry.
Thanks in Advance .
PropertiesRe: Budget Roofing and Finishes of a Nairalanders 2units of 3 bedroom flat. by Babs612000(m): 2:09am On Sep 19, 2015
KolaShangOne:
Total woodwork cost (including Treatment n Workmanship) - 445,000
Total aluminium covering (plus cladding, ceiling n workmanship)- 705,000

Total spent on roofing 2 units of3 bedroom flat- 1,150,000.
Thanks this cost is not to bad for the above house thus four bedroom should not cost more than 800,000 or less .
PropertiesRe: Budget Roofing and Finishes of a Nairalanders 2units of 3 bedroom flat. by Babs612000(m): 1:22am On Sep 18, 2015
KolaShangOne:
Almost done...
Good work love this.
PropertiesRe: Budget Roofing and Finishes of a Nairalanders 2units of 3 bedroom flat. by Babs612000(m): 1:21am On Sep 18, 2015
mufutau55:
What I hate about it is that some things are unrecoverable... great loss. May God keep on protecting us though.

Hajji M.
Sorry for the loss .
Please do you do German floor for this house?
The way I am looking at this house it seems German floor was not done.
PropertiesRe: Budget Roofing and Finishes of a Nairalanders 2units of 3 bedroom flat. by Babs612000(m): 2:14am On Sep 12, 2015
KolaShangOne:
1. With shoot-outs, its 25.5m x 11.7m
2. The house is 2 units of 3 bedroom flat. That means there are a total of six ( 6 ) bedrooms.
Thanks for the above information.
PropertiesRe: Budget Roofing and Finishes of a Nairalanders 2units of 3 bedroom flat. by Babs612000(m): 10:42pm On Sep 09, 2015
KolaShangOne:
Day 4- Nogging and facial boards...
1. Please what is the length of this house in feet( L & B).
2. How many bedrooms is the house sorry if I am taking you back.
PoliticsRe: Fayose Impose Heavy Taxes/levies On Ekiti People! Shuts Glo,mtn And Others by Babs612000(m): 10:30pm On Sep 08, 2015
[quote author=Firefire post=37813928]they should all pay their statutory taxes...

Finito![/quot. Yes paying tax is right thing to do BUT will they use the money to develop the state.
PropertiesRe: Reality Building Of A 2 Bedroom Flat In Akure by Babs612000(m): 10:57pm On Sep 07, 2015
abouzaid:
please can i have the plan? can you tell me how else you were able to beat the cost down? nice work, I'm still interested in your final finishing cost.
Wow!!! This is a lovely house what are the rooms size and the sitting room in feet please and if possible you can post the plan.
PropertiesRe: DIY: Construction Of 4 Units Of 2-bedrooms Terraces [Ikorodu-I] by Babs612000(m): 8:40am On Aug 30, 2015
EgunMogaji:
Thank you so much for doing this.

Are there any other fees involved? For example is your fee included in the labour?

I'm going to be doing an 80x50 slab and I love these your price compared to some of the quotes that I've been getting.

You've given me great joy this afternoon financially.
Wow!!! thank YOU VERY MUCH for the break down of the German floor mine is just 60ft x 30ft less spending than the above project.
PropertiesRe: Building My 3 Bedroom Bungalow (the Apocalypse) by Babs612000(m): 11:49pm On Aug 29, 2015
Muyesky:
50k
pls what are the sizes of the soak away.
PropertiesRe: Building My 3 Bedroom Bungalow (the Apocalypse) by Babs612000(m): 11:34pm On Aug 29, 2015
Muyesky:
hello guys, i started the building of my 3 bedroom not too long ago and thought i shld share my experience, cost, process and progress with the house. The land is situated in (Igbesa) Ado-Odo ota local government, Ogun state. i have been able to achieve this through my experience on Nairaland, here are some pictures of the building so far. cheesy
Hello please I am new on nairaland I am about to start a four bedrooms bungalow in Abeokuta at obafemi owode local govt.
Can Muyesky tell me what is the total cost of finishing is house and if he can post the finished pictures.
I have a budget of maximum of 5m to spend on the house just normal finishing,presently the plans has been submitted for approval.
My email is babs612000@yahoo.co.uk
Thanks.
PropertiesRe: DIY: Construction Of 4 Units Of 2-bedrooms Terraces [Ikorodu-I] by Babs612000(m): 4:37pm On Aug 29, 2015
BITSWORKS:
Thank you all for the comments, I will take time to respond to each person but work is a bit hectic now so I crave ur indulgence for just a little bit more time.
Well done sir please can you also let us know the area surface of the German floor in feet ( e.g 96ft x 25ft ) thanks.
PropertiesRe: Construction Of Four Bedroom Bungalow, Onicha-ugbo, Delta State by Babs612000(m): 8:44pm On Aug 28, 2015
kcsystems:
Updated cost not collated yet but can give a rough estimate. Kindly send me your email
Many thanks for your emailing.
This will help me a lot on the project that I am about to start.
PropertiesRe: DIY: Construction Of 4 Units Of 2-bedrooms Terraces [Ikorodu-I] by Babs612000(m): 6:52pm On Aug 28, 2015
carapace1:
Ur step by step pics are good, we've seen ur column starter but u didn't show us reinforcement to column base. nevertheless, many of ur information are useful God bless u.
please what is the total cost of the German floor only. Many thanks.
PropertiesRe: Construction Of Four Bedroom Bungalow, Onicha-ugbo, Delta State by Babs612000(m): 4:45am On Aug 27, 2015
kcsystems:
Updated cost not collated yet but can give a rough estimate. Kindly send me your email
Thanks here is the email babs612000@yahoo.co.uk
PropertiesRe: Construction Of Four Bedroom Bungalow, Onicha-ugbo, Delta State by Babs612000(m): 11:26am On Aug 26, 2015
kcsystems:
It's not a raft foundation I did and am building on a firm or good soil.
Many thanks for the above information.
Again how much have you spend so far to this level please.
PropertiesRe: Construction Of Four Bedroom Bungalow, Onicha-ugbo, Delta State by Babs612000(m): 6:51pm On Aug 25, 2015
EgunMogaji:
Excellent work.

So it took you 10 days to get this done. I will have to increase my time on the ground to accomplish mine that is slightly bigger at 15 x 24 meters.

Would love to see your figures to get to this stage. A rough figure is okay.
Please why don't you use iron on the German floor .
PropertiesRe: Cost Of Building A 4 Bedroom Bungalow From Foundation To Roofing by Babs612000(m):
Hello my Ogas in the house please I am about to start buliding a four bedroom bungalow in Abeokuta please can anyone give me an estimate
From foundation to roofing level I wish to use 0.45 or 0.55mm aluminium for the roofing.
This are the sizes of the house
2 bedrooms has 12 x12 with en-site.
2 """"""""""""""".10 x12 with one bath and one toilet.
Sitting room 14x16.
Kitchen 10x10
Ante room. 8x10
Please do I need to do German floor since most land in Abeouka are solid dry.
Thanks in Advance .

1 2 3 4 5 6 7 8 9 10 11 12 13 (of 13 pages)