DIY Concrete Driveway: Cost Update Stone Dust - N50,000 Sharp Sand - N23,000 Gravel - N24,000 45 bags of Cement - N72,000 Labour/Mason - N35,000 Total Cost - N204,000 Total No of Hours - 14 hours
|
kayci_d77: pls can this windows be used with net , i mean window netThe window in the picture has a sliding net neatly installed. |
Rendering in progress
|
Picture Updates: Windows
|
blank: I decided to modify my earlier post. I have seen that you have learned quite a lot from your past mistakes and have taken all the negative criticism in your stride. I am happy that the ahonohai issue has finally been laid to rest.Thank you. |
The Luxury flat is fully plastered. Finishes to begin soooooooon!
|
Updated Pics
|
The driveway
|
Trenching in utilities - GateHouse Waste and Water Pipe. - Perimeter Drain Pipe installation (keeping the water off the foundation)
|
I've just realised that it is 4 days since my last blog post. This is not because there has been no progress, rather that it has been such a busy week and I have been off site. I'll be resuming to site with the roof carpenters tomorrow. |
Testing the driveway
|
olubuffett: This is a beautiful peace of work! I go come steal your house o, brabusThanks. mufutau55: ^^^^^Thank you. |
Curing the concrete
|
Proudly Naija for life!!! I'd advice NIDs and NINs to get busy fixing their lives |
Hajji, thanks. Now, I'm gonna get cobblestone for the driveway and also get pigments for a stained finished floor. Thats another weekend project.
|
Fence/Gate Pillars light installation ongoing
|
Hopefully when we are done, the finished driveway will look exactly like this
|
Concreting the Driveway We are pouring concrete on the 5m wide driveway
|
Nigeria? |
walemglobal: Hi, Can you reply to my emails and test messages. Really need to hear from you asap for a decision making.Sir, my sincere apologies for the delayed response. I've just responded to your mail. Thank you. UPDATE: I'll attend to your request tomorrow. Please kindly disregard the message above, I actually responded to another client's email. Thank you. |
Well, my star boy turned 2 today and we had his birthday party at the Funfactory, Bodija - IB. All the kids we invited LOVED that place. They had a great time and really, that's the only thing that matters to me. Happy Birthday Tim
|
In the neighbourhood...
|
Just pictures...
|
mufutau55: Is a picture supposed to be attached to this message? I can't see a thing.. says the Blindman.I guess it's a technical issues at Nairaland backend and I expect the admin to have send us an email about the issues. A simple "We've had a lot of technical problems over the past 2 days and some forum capabilities have been out of commission. Please bear with us." message would have put the issue to rest and there wouldn't have been any need to kill our computers before realizing the problem is with the board/forum. Anyway, this is Nigeria! |
[size=14pt]“Most people think it’s all about the idea. It’s not. EVERYONE has ideas. The hard part is doing the homework to know if the idea could work in an industry, then doing the preparation to be able to execute on the idea.” – Mark Cuban[/size] |
emu-j:You got mail sir! |
Rendering Starts in... We are back to work yesterday after the long period off site. While we were away, a lot of activities were ongoing at the site and I hope to bring you picture updates as soon as I'm live at the site. Meanwhile, preliminary works on the rendering are ongoing and we hope to bring you a lot of progress from the project site this weekend. In the meantime, sit back, relax and grab your popcorn while we walk you through the preliminary details. Pre-plastering Works (Fri. 23 - Mon. 26) 1. Installation of AC/Refrigeration Drain Pipes 2. Fabrication and installation of Aluminum windows 3. Fabrication and installation of Doors and subframe 4. Site clearing for accessibility and safety 5. Pre-ordering materials and taking deliveries. 6. Conduct final checks on the various installations 7. Rendering of the parapet |
Counting Joys I can't believe my baby brother (Tim) is 2 already! I've always think I've birthed a baby boy, but I've just discovered that I've given the world another man. That tiny, precious baby boy born about 2 years ago is now being raised to become someone's first date, first kiss, first love and more importantly, the change the world had been waiting for. Join me in wishing our young little man, a Happy Birthday in advance! |
Roofing Woods delivered this evening... 75 x 100mm 50 x 100mm
|
The Chateau as captured on my Nokia 206
|
Quick Update: The first batch of roofing woods have arrived the site and I'll be going back to the site to take stock of the delivery. |
Preparation of the parapet beam reinforcement and shuttering continues... As it is, the progress of this stage may appear to be slow as a lot of preparation are needed in order to realise the design of the complex parapet beam reinforcement structure, before it can be poured. All things been equal, the parapet will be poured this saturday. UPDATE: First batch of the wood for the roofing of the Chateau will be arriving at the site later this evening. |