PropertiesRe: Construction Of 2bedroom 3units And Mini Flat In Benin by eghosajohnny(op): 2:40am On Apr 13, 2016
Thanks bro and pics below will show our progress so far

PropertiesRe: Project Done Within The Past Weeks by eghosajohnny(op): 2:16am On Apr 13, 2016
M4gunners:
Good morning Johnny,please i would like to know the cost for the roofing from woodwork to finish(for the 5bdrm bungalow ) thanks in advance.
You can call me or chat on whatsapp on this number.

07031886484

More pics below on the bungalow as we are rendering the parapet

PropertiesRe: Project Done Within The Past Weeks by eghosajohnny(op): 4:01am On Apr 12, 2016
More pics

PropertiesRe: Project Done Within The Past Weeks by eghosajohnny(op): 3:56am On Apr 12, 2016
So much has been on for some time now and here's the pics for work done so far as we've removed the parapet wood

PropertiesRe: After Roofing A House, What's The Next Thing To Do? by eghosajohnny: 6:07am On Apr 11, 2016
pmxpo:
I just concluded the roofing stage of a 4 bedroom bungalow in Lugbe. The site engineer has given me the bill below as the next phase. Please can you advise accordingly?

Analysis of the estimate work.
(1) electrical pipe work @ # 180,000
(2) plumbing internal pipe work @ # 110,000.
(3) protectors @ #250,000.
(4) window casement @ #450,000.
(5) ten (10) load of plastering sand @ #70,000.
(6) one (1) load of stonedust @ #50,000.
(7). One hundred and ten (110) bags of cement @ #1,650, = #181,500.
(cool labour # 350,000.
(9) all the chambers @ #100,000.
(10) external pipe to the sockerway and outside water pipe @ #68,000.

Grand total = 1,809,500.00
Here's a quote to guide prroper

Electrical can be reduced to 130,000
Plumbing:90,000
Protector:180,000
Casement with tower material:420,000
Plastering sand7load 49,000
A load of stone dust:50,000
80 bags of cement:132,000
Labour:250,000
External pipe work:40,000
Chamber:80,000

All this are perfect and of good material if u need any advice just call

007031886484
PropertiesRe: How Much Should Be My Budget For A 4-bedroom Bungalow by eghosajohnny: 11:38pm On Apr 10, 2016
7m will complete the job just as it iis on the pics Uu posted,I'm confident

If u want the break down just call or whatsapp my number


070318864
PropertiesRe: How Much Will It Cost Me To Develop This Building Plan To Roofing (photo) by eghosajohnny: 5:15am On Apr 10, 2016
I'm a builder and the quote below will help u achieve your aim

Foundation: 1.5m
Block work: 1.3m
Decking:2.4m
Firstfloor:1.3m
Roofing wood work:600k
Aluminium long span:700k

If you have any question you can call to ask

07031886484,same on whatsapp
PropertiesRe: Whats The Cost Of A 4 Bedroom Duplex Decking by eghosajohnny: 6:06pm On Apr 05, 2016
The location will help so one will know the area and the cost of materials in the area will help in the cost proper but around 1.7m will perfectly handle the job any where
PropertiesRe: Can One Build A 2-Bedroom Bungalow In Lagos With N3.5 Million In This Times? by eghosajohnny: 5:44pm On Apr 05, 2016
For 2 bdroom bungalow it will take 3.2m with steptile roofing sheet,sliding aluminium window,virony china door,tiles for ground and toilet,pop for parlour room pvc,plumbing and electrical to painting
PropertiesRe: ... by eghosajohnny: 5:33pm On Apr 05, 2016
capspeter:
hi all,
i would like to build a selfcon boys quarters in my plot of land at ikorodu, please i need advice from experienced people, on the the likely cost and how to go about it.
thanks alot.
Boys quarter of how many rooms
PropertiesRe: Construction Of 2bedroom 3units And Mini Flat In Benin by eghosajohnny(op): 6:23am On Apr 05, 2016
Hello all here are the updates on the progress on site

PropertiesRe: What Will It Cost To Deck A 4 Bedroom Duplex by eghosajohnny: 5:22am On Apr 05, 2016
sucre:
Fellow nairalanders,what will it cost to deck a 4 bedroom duplex, see plan below.
1.8m I will handle it
PropertiesRe: Can One Build A 2-Bedroom Bungalow In Lagos With N3.5 Million In This Times? by eghosajohnny: 9:30pm On Apr 01, 2016
That amount will finish the job to painting
PropertiesRe: what stage can 4m get to for a 3bedroom of 4 flats by eghosajohnny: 3:55am On Mar 30, 2016
Rooneyunited:
Please what stage can 4million do for someone that want to build 3 bedroom of 4 flats....please I need sincere replies
First the location and if the land is dry and level enough

Then foundation,2.2m
From foundation to decking level,1.7m


Thaats how fr it can go
PropertiesRe: Cost Of Building A 4 Bedroom Bungalow In Lagos At Present by eghosajohnny: 11:04am On Mar 28, 2016
Just the amount I gave in my last post will handle it or less which is 6m or less and it consist of all the interiors I wrote on my above post,lets just say 5.7m



You can contact me for further discussion

07031886484
PropertiesRe: Building Of One Storey Biulding by eghosajohnny: 2:41am On Mar 28, 2016
Thank you sir for the concern but 75% of 2bdrm flats comes ensuite no ante room it's mostly a simple design and secondly he said to to lintel level it won't fail.
PropertiesRe: Building Of One Storey Biulding by eghosajohnny: 11:57pm On Mar 27, 2016
In ajah area of lagos it will cost 3.5m while in a none water logged area it will cost 2.7m bring any design it won't fail
PropertiesRe: Cost Of Building A 4 Bedroom Bungalow In Lagos At Present by eghosajohnny: 8:02pm On Mar 27, 2016
liveweezy:
Good day to all my fellow Nairalanders.Please i intend building a 4 bedroom bungalow in lagos all rooms ensuite.can you guys please give me a run down of what it would cost me to achieve this project.Just a rough estimate so i can know where i stand capital wise.
Thanks to you all in advance
Firstly the location and if the land is dry is it level.

But to make things a little easy,in ajah axis it will cost 7m and it consist of steptile roofing sheet casement window, pop ceiling,parapet before roof,china doors and painting.


Outside ajah the mainland will cost 6m
PropertiesRe: Construction Of 2bedroom 3units And Mini Flat In Benin by eghosajohnny(op): 5:15pm On Mar 27, 2016
kopell:
Another opportunity, be wise and good luck!!!!!!!!!
Thanks bro I really appreciate your concern I must make my fellow NL believe me that I'm not what they think I am.

Once again thanks
PropertiesRe: Construction Of 2bedroom 3units And Mini Flat In Benin by eghosajohnny(op): 1:48pm On Mar 27, 2016
Pix

PropertiesRe: Construction Of 2bedroom 3units And Mini Flat In Benin by eghosajohnny(op): 1:46pm On Mar 27, 2016
More

PropertiesRe: Construction Of 2bedroom 3units And Mini Flat In Benin by eghosajohnny(op): 1:40pm On Mar 27, 2016
Work on site

PropertiesRe: Construction Of 2bedroom 3units And Mini Flat In Benin by eghosajohnny(op): 1:38pm On Mar 27, 2016
More

PropertiesRe: Construction Of 2bedroom 3units And Mini Flat In Benin by eghosajohnny(op): 11:03am On Mar 27, 2016
Setting out and foundation

PropertiesRe: Construction Of 2bedroom 3units And Mini Flat In Benin by eghosajohnny(op): 10:23am On Mar 27, 2016
Work on site

PropertiesRe: Construction Of 2bedroom 3units And Mini Flat In Benin by eghosajohnny(op): 10:20am On Mar 27, 2016
More pix on the design

PropertiesConstruction Of 2bedroom 3units And Mini Flat In Benin by eghosajohnny(op): 10:16am On Mar 27, 2016
We thank GOD for yet another project aas we commence the construction of 3unit of 2bedroom flat and a mini flat in benin.

Client: nairalander
Contractor: JOI construction
Job specification :Build to completion
Duration: 120 days

Pix on the progress so far

PropertiesRe: Project Done Within The Past Weeks by eghosajohnny(op): 6:22am On Mar 27, 2016
sweetedge:
Nice Job Johnny.
Thanks my oga looking forward in starting and completing your roof too
PropertiesRe: Project Done Within The Past Weeks by eghosajohnny(op): 10:30pm On Mar 18, 2016
More on the roofing with classic roofing sheet

PropertiesRe: Guide Cost Of Decking Slab Of A Standard Twin Three Bedroom by eghosajohnny: 9:57pm On Mar 18, 2016
jossy26:
@yaskin, I can see your building is in isheri north am also about to develop a property there got a quote of 4m plus for a raft foundation and German floor is that a fair quote from your experience in the area. I will appreciate your response
Sir can you specify the building type so I can know iif the quote is high or low if the building is a 2flats of 3bdrm only then can I assist u

And for the decking 2.7m I can handle it

Better still call 07031886484
PropertiesRe: Project Done Within The Past Weeks by eghosajohnny(op): 8:07pm On Mar 17, 2016
More pix

PropertiesRe: Project Done Within The Past Weeks by eghosajohnny(op): 7:59pm On Mar 17, 2016
back2sender:
Lets have your picture in the background of these "photo" of the different stage of the construction with timelines.
Hello all,here we are on the roofing sheet for the nogging of the building above.

Pix below