Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 5:11pm On Apr 29, 2021 |
|
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 4:21pm On Apr 29, 2021 |
More
|
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 4:14pm On Apr 29, 2021 |
Over-site concrete live in progress.
|
Properties › Re: Handlings Of Anambra Edifice By Rotech77 by rotecch77(op): 10:40am On Apr 29, 2021 |
Coming out cool gradually by gradually
|
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 8:04am On Apr 28, 2021 |
Finishing still in progress |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 6:25pm On Apr 27, 2021 |
folmus: I thought it's the one hefty guys normally use hands to turn instead of the machine Yes it’s ( normal hand turning type) Manual |
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 3:57pm On Apr 27, 2021 |
More pics
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 3:32pm On Apr 27, 2021 |
folmus: @rotecch77, this borehole option, any advantage? It’s normal bore hole drilling system, What you see there is mould pit.
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 3:13pm On Apr 27, 2021 |
Watch out! Watch out!! Watch out!!!
New construction of 2 stories building consists of 12 flats by Arbo contractor Ltd ( Rotech77)
Bore hole Site store/ office In progress
08066619493.
|
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 11:51am On Apr 27, 2021 |
After earth filling, it’s compaction process which is going on with mechanical compactor machine right now.
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 9:57am On Apr 26, 2021 |
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 9:56am On Apr 26, 2021 |
[quote author=PAPAFEELERS post=101120398]Dear my Ogas, Please how much does this plumbing materials cost, the list shows the number of pieces my engineer sent me that would be needed. make una help me oooooo with the unit prices .thanks Cc: Next , spyder, egunmogaji,twinskenny, Gbadexy, Oga Rotech the Don,Topsy etc. 1) 1inch P.P.R pipe -2800 2) 1inch P.P.R elbow - 130-150 3) 1inch P.P.R socket - 120-140 4) 1inch P.P.R gate valve - 2500-3000 5) 1inch P.P.R union - 1200 6) 1inch by 3/4 (three quarter) P.P.R tee -90 7) 3/4 P.P.R elbow - 90  3/4 P.P.R male&female - 600 9) 1inch P.P.R male&female socket -650 10) 3/4 Tap - 500,900,1500,2500 11) 1inch non-return valve - 1200 12) 1inch tiger nipple - 100 13) Tee tap - 350,800,1500 14) 50mm P.V.C bend - 200 imported 15) P.V.C gum - 800 small, 1500 medium 4000 big 16) 100mm P.V.C bend - 500 imported Ooya take your biro and write it down |
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 6:24pm On Apr 25, 2021 |
Site update
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 6:12pm On Apr 25, 2021 |
n3xt: I won’t be quick to dispel his ideas though. There might be a new way to do things.
I know I’ve seen a building that was not plastered the traditional way we do stuffs. They just did the ceiling and the walls were screeded with a special mortar mix.
I’ll share video once I can get it. The solution was shared in one of our Affordable Housing conference. I got you right. But not like the regular house the op is asking for,which also 95pec same way we build here and some other part of the world. So pop 1st before plastering is the way. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 12:03pm On Apr 25, 2021*. Modified: 6:41pm On Feb 27, 2025 |
hslbroker2: good questions.
Doing pop before plastering is the best, because it will enable the plasterer to gauge and smooth all the edges of the pop design.
Plumbing work is done before plastering because all the walls the plumber will break before laying the pipes must be cover with bricks and mortar by the plasterers.
Same applies to electrical pipping, it must be done before plastering.
Frames for doors must be available on site before plastering because if you don't provide it for the plasterers when they are plastering coming back for them to install the frame after plastering will cost you, time, energy and money.
Windows must be on site install, before plastering it save you money and it is the best ethic to get wonderful finishing.
After plastering is fixing of plumbing and electrical materials for the project.
Next to painting.
But before all this can be done you must cover the buidling. You will find your self blame for Doing POP ceiling BEFORE plastering, who does that. Except you want to fix wall tiles on such surface which might NOT need smooth plastering surface |
Properties › Re: Handlings Of Anambra Edifice By Rotech77 by rotecch77(op): 8:23am On Apr 24, 2021 |
Still on the completion stage |
Properties › Re: Post your mechanical(plumbing)problem here and get quick solution to it . by rotecch77(op): 8:20am On Apr 24, 2021 |
We are here for you |
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 8:18am On Apr 24, 2021 |
ArcToyin: Thumb up sir. Am seeing a good building up there, the block layers are superb too. Thanks chief, I really appreciate your time here. |
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 9:54pm On Apr 23, 2021 |
Reach out to us today |
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 9:53pm On Apr 23, 2021 |
Loading... |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 9:41pm On Apr 23, 2021 |
n3xt: Nice doors. You suppose collect the N1.7m balance from the client  Lolz |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 7:54pm On Apr 23, 2021 |
n3xt: Very cheap.
I found something close to the door below in Swisstrade, Ikota at N2,000,000 in 2014.
Good doors cost fortune. You are right, but some of those does price are over hype by those company. A client here contacted us about 3yrs ago to do same door and here is what we come out with, 200k plus delivery. 1 and 2 pics is our own 3rd pics is the one you posted sold by Swiss for 2million
|
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 10:13am On Apr 23, 2021 |
Watch out for more update here |
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 10:03am On Apr 23, 2021 |
Yes, many houses are like that in LND |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 9:39am On Apr 23, 2021 |
hamtabfawaz: Talking about those pictures.....
I hope there is a possible solution to those kind of disaster ? & it wouldn't amount to have to demolish the build?
||| I stumbled upon a build at a friend's place where a -Slate- was used as Lintel Support. & Some doesn't have Lintel. In this same build A plumbing Pipe passed through (under the ground) a room to the toilet.
I was Shocked !
My Big Question Again : is there a proper way of correcting such disasters without demolition?
Pictures below
Cc @Aventures @n3xt @Rotech77 @Uncleteeh @Spyder880 It’s not a shock to me,I have seen many shabby work like that.....what did you expect from quack Labour/ workmen couple with client who like better things and can’t dole out money for such. That is the problem they will always encounter and “NO AMOUNT OF REPAIR CAN STAND GOOD QUALITY WORK FROM BEGINNING” it can only solved the problem 60-75pec Well it can be corrected without much demolition, that is if expert handle it. Edit... Just a little cutting then introduce precast or Fresh cast-in-situ conc into the place |
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 8:42pm On Apr 22, 2021 |
Nigeria high grade tiles size 60*60
|
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 6:01pm On Apr 22, 2021 |
We are committed to our work.
No Child play here oo
|
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 12:37pm On Apr 22, 2021 |
More coming |
Properties › Re: Anambra Capital City(awka) Mega Project By Rotech77(arbo Contractor Ltd) by rotecch77(op): 9:01pm On Apr 21, 2021 |
Load of pics loading |
Properties › Re: Handlings Of Anambra Edifice By Rotech77 by rotecch77(op): 8:59pm On Apr 21, 2021 |
Watch out |
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 8:57pm On Apr 21, 2021 |
Tiling is in progress
|
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 8:55pm On Apr 21, 2021 |
Preparation for over site concrete and some earth filling in progress
2 weeks gone
|