Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 8:26am On Apr 04, 2021
Compound finishing loading..... watch out
Properties › Re: Handlings Of Anambra Edifice By Rotech77 by rotecch77(op): 8:25am On Apr 04, 2021
Stayed tuned for more
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 7:30am On Apr 04, 2021
Today is rest day for workers,
Tomorrow work continue

More pics update will be uploaded here, watch out!
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 7:58pm On Apr 03, 2021
EgunMogaji2:
Emi o dagba malabe, egungun eran ni kan ni mi ole san grin
Haaa, baba agbalagba , nothings do you sir, may you live long.
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 6:58pm On Apr 03, 2021
EgunMogaji2:
I’ve not fully forgotten kolashangone for successfully shielding her engineer from us back then grin
Lolz
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 6:58pm On Apr 03, 2021
mufutau55:
My Oga on duty o. Very food work.
But dont let @Egunmogaji2 see that your She Engineer o.
Keep up the good work Sir.

Hajji M.
Baba Agbalagba sir,
Babs. Egunmogaji Don retired from woman stuff..lolz. Agba tii de
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op):
Could you believed that, the plant we used here to demolished the existing building and excavation of top soil cost only N90k

When we contacted direct laborers to see how to save cost we realized that by using them( laborers) it will slow the time of work ( like 1 weeks) and the cost is:

3500 *10( workers) a day=35,000
35,000*7Days=245,000
(Demolition, packing, top soil remover)

Boom we go for the plant ( bulldozer) 90k

245,000-90,000=155,000

We save N155,000 for the client.( we just add only 25k

The money saved here now used for the whole 2 building foundation excavation N150,000

Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op):
Henix:
Kudos!
Thanks so much sir.

As I said we believed much in action
“Less talk more action”
While excavation of the eatery is going on we are setting out the residential building plan on one side to meet up with our work program.

Eatery foundation almost done, we are shifting to residential building foundation by Monday.

Thanks you all your time here.

Arbo contractor Ltd (Rotech)

Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 10:24am On Apr 03, 2021
folmus:
following
Thanks for your time here chief

Questions are welcome here
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 4:53am On Apr 03, 2021
Tiling is about to commence here
Watch out!
Properties › Re: Handlings Of Anambra Edifice By Rotech77 by rotecch77(op): 4:51am On Apr 03, 2021
Pop work done,

Commencement of tiling is loading
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 4:50am On Apr 03, 2021
Men at work

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 4:19am On Apr 03, 2021
BrabusNG:
Good luck bro!
Thanks honorable chairman
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 8:09pm On Apr 02, 2021
rotecch77:
Just a reminder to you all
Watch out for this our project

Duration 24weeks

A thread will be open soon for the project
All details will be posted there
Thanks
Bore hole done today ... depth 150ft
Cost 200k
https://www.nairaland.com/6487704/construction-contemporary-eatery-6-flats

This is the thread to the project.

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 7:52pm On Apr 02, 2021
topsy23:
Quality and neatness is our watchword.

Call us today for MEP design and installation

For Your Electrical, Mechanical and HVAC design and installations,

You can visit our thread: https://www.nairaland.com/1804476/complete-package-design-drawing-electrical

https://www.nairaland.com/1233943/contact-us-electrical-mechanical-plumbing/9

For original Cables https://www.nairaland.com/2326721/nigerchin-kabelmetal-coleman-cables/14

Phone number 08033643191, 08051750560 whatsapp number : 08033643191

E-mail: atope23@live.co.uk, topselg.engineering@gmail.com
Very good and details job

Not regular Baba Lati job
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 7:10pm On Apr 02, 2021
We have 2 weeks for excavation of trenches and columns pit of the two building.

More update coming soon
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 5:32pm On Apr 02, 2021
Excavation in progress



Arbo contractor Ltd

Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 11:42am On Apr 02, 2021
We speak less
We believed in action
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 7:09am On Apr 02, 2021
Watch out for more pics
Properties › Re: Handlings Of Anambra Edifice By Rotech77 by rotecch77(op): 7:01am On Apr 02, 2021
Sittingroom pop

Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op):
Excavation in progress
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 6:23am On Apr 02, 2021
Ventura1:
Well done!
Thanks my brother
Properties › Re: Public Display Of All Plumbing/sanitary Wares Prices by rotecch77(op): 10:37pm On Apr 01, 2021
100mm pvc s/thick pipe now 2800-3000
1000mm light pvc pipe 1950
Regular twyford wc now 17600-18,000
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 10:35pm On Apr 01, 2021
Still on
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op):
Cost of drilling bore hole
200k ..... 150ft

Cost of setting out materials =45,000
settlement of street guys/ Omonile 100,000
Excavation of the two building fdn 180k

Cont”

Loading..,
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 10:28pm On Apr 01, 2021
What to expect from us here

- cost of materials
- cost of project stages
- some construction idea
- question and answer
Etc







Week1-2
-Clearing of the site
- site hoarding
- bore hole drilling
- setting out of the building plan

Properties › Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op):
Officially Opened
We gives thanks to Almighty God for giving us this project to handle.
We also thank the, client, Nl members, our esteemed clients, viewers, etc.

Project brief
We are to design and build
- A contemporary eatery with executive pent house
-6units of flats.(2 bedrooms flat 4 units and mini flats 2units)
Both from design stage to finishing stage.(hand over of key)

Contractor ;Arbor contractor Ltd (Rotech77)
Client; NL by associate
Location ;Center of excellence
Duration;25 weeks
Contact : 08066619493 call/whatzap

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 10:51pm On Mar 30, 2021
micgray100:
PLEASE DROP THE NUMBER OF THE BOREHOLE DIGGER HERE... I NEED ONE DONE ALONG OGIJO, SHAGAMU
Ok , I will send it to you sir
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 10:50pm On Mar 30, 2021
dapotemi:
Can you borehole guy dug up to 300 feet?
Yes with drilling rig,not manual as this
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 9:19pm On Mar 30, 2021
Just a reminder to you all
Watch out for this our project

Duration 24weeks

A thread will be open soon for the project
All details will be posted there
Thanks
Bore hole done today ... depth 150ft
Cost 200k

Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 10:28pm On Mar 29, 2021
Tiling 85pec done
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 10:24pm On Mar 29, 2021
Update pics loading