Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 8:26am On Apr 04, 2021 |
Compound finishing loading..... watch out |
Properties › Re: Handlings Of Anambra Edifice By Rotech77 by rotecch77(op): 8:25am On Apr 04, 2021 |
Stayed tuned for more |
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 7:30am On Apr 04, 2021 |
Today is rest day for workers, Tomorrow work continue
More pics update will be uploaded here, watch out! |
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 7:58pm On Apr 03, 2021 |
EgunMogaji2: Emi o dagba malabe, egungun eran ni kan ni mi ole san  Haaa, baba agbalagba , nothings do you sir, may you live long. |
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 6:58pm On Apr 03, 2021 |
EgunMogaji2: I’ve not fully forgotten kolashangone for successfully shielding her engineer from us back then  Lolz |
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 6:58pm On Apr 03, 2021 |
mufutau55: My Oga on duty o. Very food work. But dont let @Egunmogaji2 see that your She Engineer o. Keep up the good work Sir.
Hajji M. Baba Agbalagba sir, Babs. Egunmogaji Don retired from woman stuff..lolz. Agba tii de |
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 4:57pm On Apr 03, 2021*. Modified: 2:59pm On Jul 25, 2021 |
Could you believed that, the plant we used here to demolished the existing building and excavation of top soil cost only N90k
When we contacted direct laborers to see how to save cost we realized that by using them( laborers) it will slow the time of work ( like 1 weeks) and the cost is:
3500 *10( workers) a day=35,000 35,000*7Days=245,000 (Demolition, packing, top soil remover)
Boom we go for the plant ( bulldozer) 90k
245,000-90,000=155,000
We save N155,000 for the client.( we just add only 25k
The money saved here now used for the whole 2 building foundation excavation N150,000
|
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 4:21pm On Apr 03, 2021*. Modified: 4:38pm On Apr 03, 2021 |
Henix: Kudos! Thanks so much sir. As I said we believed much in action “Less talk more action” While excavation of the eatery is going on we are setting out the residential building plan on one side to meet up with our work program. Eatery foundation almost done, we are shifting to residential building foundation by Monday. Thanks you all your time here. Arbo contractor Ltd (Rotech)
|
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 10:24am On Apr 03, 2021 |
folmus: following Thanks for your time here chief Questions are welcome here |
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 4:53am On Apr 03, 2021 |
Tiling is about to commence here Watch out! |
Properties › Re: Handlings Of Anambra Edifice By Rotech77 by rotecch77(op): 4:51am On Apr 03, 2021 |
Pop work done,
Commencement of tiling is loading |
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 4:50am On Apr 03, 2021 |
Men at work
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 4:19am On Apr 03, 2021 |
BrabusNG: Good luck bro! Thanks honorable chairman |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 8:09pm On Apr 02, 2021 |
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 7:52pm On Apr 02, 2021 |
|
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 7:10pm On Apr 02, 2021 |
We have 2 weeks for excavation of trenches and columns pit of the two building.
More update coming soon |
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 5:32pm On Apr 02, 2021 |
Excavation in progress
Arbo contractor Ltd
|
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 11:42am On Apr 02, 2021 |
We speak less We believed in action |
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 7:09am On Apr 02, 2021 |
Watch out for more pics |
Properties › Re: Handlings Of Anambra Edifice By Rotech77 by rotecch77(op): 7:01am On Apr 02, 2021 |
Sittingroom pop
|
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 6:25am On Apr 02, 2021*. Modified: 6:56am On Apr 02, 2021 |
Excavation in progress |
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 6:23am On Apr 02, 2021 |
|
Properties › Re: Public Display Of All Plumbing/sanitary Wares Prices by rotecch77(op): 10:37pm On Apr 01, 2021 |
100mm pvc s/thick pipe now 2800-3000 1000mm light pvc pipe 1950 Regular twyford wc now 17600-18,000 |
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 10:35pm On Apr 01, 2021 |
Still on |
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 10:33pm On Apr 01, 2021*. Modified: 6:55am On Apr 02, 2021 |
Cost of drilling bore hole 200k ..... 150ft
Cost of setting out materials =45,000 settlement of street guys/ Omonile 100,000 Excavation of the two building fdn 180k
Cont”
Loading.., |
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 10:28pm On Apr 01, 2021 |
What to expect from us here
- cost of materials - cost of project stages - some construction idea - question and answer Etc
Week1-2 -Clearing of the site - site hoarding - bore hole drilling - setting out of the building plan
|
Properties › Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 10:22pm On Apr 01, 2021*. Modified: 7:09pm On Apr 11, 2021 |
Officially Opened We gives thanks to Almighty God for giving us this project to handle. We also thank the, client, Nl members, our esteemed clients, viewers, etc.
Project brief We are to design and build - A contemporary eatery with executive pent house -6units of flats.(2 bedrooms flat 4 units and mini flats 2units) Both from design stage to finishing stage.(hand over of key)
Contractor ;Arbor contractor Ltd (Rotech77) Client; NL by associate Location ;Center of excellence Duration;25 weeks Contact : 08066619493 call/whatzap
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 10:51pm On Mar 30, 2021 |
micgray100: PLEASE DROP THE NUMBER OF THE BOREHOLE DIGGER HERE... I NEED ONE DONE ALONG OGIJO, SHAGAMU Ok , I will send it to you sir |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 10:50pm On Mar 30, 2021 |
dapotemi: Can you borehole guy dug up to 300 feet? Yes with drilling rig,not manual as this |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 9:19pm On Mar 30, 2021 |
Just a reminder to you all Watch out for this our project
Duration 24weeks
A thread will be open soon for the project All details will be posted there Thanks Bore hole done today ... depth 150ft Cost 200k
|
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 10:28pm On Mar 29, 2021 |
Tiling 85pec done |
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 10:24pm On Mar 29, 2021 |
Update pics loading |