Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 2:30pm On Apr 10, 2021
EgunMogaji2:
Walahi, awon agba brikila lo nse ise yi cool

Well done Sir.
Yes, we are drilling them everyday with good supervision to comes out with perfect result
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 12:15pm On Apr 10, 2021
Update coming soon
Construction is like inborn to us in “Arbo contractor Ltd
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 9:01pm On Apr 09, 2021
Too much up and down on this thread this days.

Well, in other news we are busy with what we know how to do best in “Arbo contractor Ltd “
(Aka Rotech)

We belief in physical not audio
How company Moto is “ lesser talk much action”

Check for our construction update/link pics here

https://www.nairaland.com/6487704/construction-contemporary-eatery-6-flats

Properties › Re: Handlings Of Anambra Edifice By Rotech77 by rotecch77(op): 6:33pm On Apr 09, 2021
Current site update pics live here in Anambra

Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 6:26pm On Apr 09, 2021
Current site update pics

Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 5:49pm On Apr 09, 2021
sconp:
Well-done Sir, I like the way the links on those columns are anchored.
Thanks chief
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op):
Current update

Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 10:03am On Apr 09, 2021
Watch out for the finishings of this two project
Work just stated on both

Properties › Re: Post your mechanical(plumbing)problem here and get quick solution to it . by rotecch77(op): 9:59am On Apr 09, 2021
topsy23:
Sorry is the building a residential building? Is it possible to show us the floor plan so that we can see the particular toilet in question.
Good one from you ,that is another suggestion
He can Send the pics as suggested.
Properties › Re: Handlings Of Anambra Edifice By Rotech77 by rotecch77(op): 9:49am On Apr 09, 2021
More update coming soon
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op):
Just in One week we started the settings out of the building plan, we have covered

EATERY
1)Foundation Setting out
2) Excavation
3) columns standing
4) footing/ blinding
5)80pec sub-structure block settings

RESIDENTIAL BUILDING
1) Foundation setting out
2)excavation
3)columns standing
4footing/blinding

“Much action lesser talk”
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 5:19am On Apr 09, 2021
EgunMogaji2:
Your masons are block laying wizards. They’re very good.
Thanks sir,we always drill them always to come out with quality work
Properties › Re: Handlings Of Anambra Edifice By Rotech77 by rotecch77(op): 9:22pm On Apr 08, 2021
Inner wall screeding still in progress with tiling

Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 5:59pm On Apr 08, 2021
kopell:
Chai little late to this class, na trafic ooo oga no vex
Never too late sir, you are highly welcome chief.

As I promised here is the site update.

Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 1:54pm On Apr 08, 2021
Update pics coming soon
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op):
Work continue....
Watch out out as we are progressing on the project here every day.

-30bags of cement used for the trench flooring
-15 tones of granite used
-8 tones of sharp sand
- Labour cost for casting N30,000
- Iron bender for short columns 20k



Arbor contractor Ltd.
“Much action lesser talk”
Properties › Re: Post your mechanical(plumbing)problem here and get quick solution to it . by rotecch77(op): 7:13am On Apr 08, 2021
amosblisz:
Kindly give me your opinion sir,

Is it advisable to run a 6" and 4" pipe through the ground floor of a room linking outside to the septic tank and soakaway for Wc, shower and washing hand basin?

That's what my engineer instructed his plumber to do on my building but i'm scared that the piping might get dam[b][/b]aged maybe during German flooring and tiling and that would be a big problem in future to fix, considering where the pipe run through thereby destroying the tiles and all of that to repair. I really don't want the 6" pipes to be a waste cuz I'm considering changing the plans my engineer did

Kindly advise what do I do?
If that is what your engr designed and he instructed the plumber to do I believed he have reason for that.
May be there is no any other alternative way to pass the pipe through.
But if your fear is about breakage during the casting of over-site concrete ( German floor) and tiling work, you don’t need to panic on that bcs the pipe will be berried deep inside the soil
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op):
Watch for more update pics tomorrow.
Stayed tuned
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 5:08pm On Apr 07, 2021
Current update pics

Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 2:12pm On Apr 07, 2021
Block settings in progress

Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 9:15am On Apr 07, 2021
EgunMogaji2:
Please what’s a burning rod?

Can I do a site visit? I want to see something.

Walahi my intentions are pure. wink
Baba chief sir,
Thanks for your time here sir.

As a builder we used burning rod to determine the plum level of concrete thickness when casting trench footing, so that we can have a well leveled footing all round the trench.
This will also give us same level of block settings without much stress

For the site visitation you are welcome sir.

Edit
I do used it in all project I handled
Bcs there is no way you can get same floor bed when excavated.

https://www.nairaland.com/5377385/construction-8flats-4units-2bdrms-4

Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 8:38am On Apr 07, 2021
As I said we believed in action
“More action less talk”

Foundation block setting will commence today
For the eatery section.
Properties › Re: Post your mechanical(plumbing)problem here and get quick solution to it . by rotecch77(op): 6:42am On Apr 07, 2021
amosblisz:
Hello Rotech what's the main use of pressure pump
It’s used to boost water pressure, in case you have low water pressure in your building ones you installed the pump you will always have good water pressure in every part of your building.
You can only have pressure of water when there is light.
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 5:52pm On Apr 06, 2021
Introducing burning rod here into the trench

-also the blinding and short columns for the eatery section done.

Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 7:24pm On Apr 05, 2021
Still on 1st week of the project and we have covered 80pec of work programmed for 2 weeks
“Guys are not smiling here”
We are targeting 22weeks to finished up the job, although we agreed for 25weeks to deliver the job.
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 12:25pm On Apr 05, 2021
Second building trench excavation is in progress.
We have about 2000 blocks already on ground,
And more block production is going on.

Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 11:30am On Apr 05, 2021
CONTEMPORARY DESIGN

Unlike modern design, contemporary design doesn't refer to a specific period of time—it's constantly evolving to reflect the popular styles of present day design. It borrows qualities from modernism, minimalism, Art Deco, and other global styles, without hyper-focusing on any one in particular. Though contemporary design is, by nature, fairly ambiguous, there are a few qualities that help define the contemporary style. Neutral palettes, stark minimalism, clean lines, and organic silhouettes are some of the prominent characteristics. You can expect to see materials including nickel, steel, and chrome, combined with natural textures like hemp or jute.

Culled from internet
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 10:40am On Apr 05, 2021
EgunMogaji2:
My brother I'm watching.

I'm waiting to sell my personal house before I start the new one (no personal interest in owning two private homes). So until then I'm living through you guys doing duplex builds. Also learning and taking notes.

Thanks for sharing.
I like your idea of having only one personal house in same location ,why do someone need 2 personal house in same city, it’s better to have one and many commercial building
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 7:31pm On Apr 04, 2021
Warming up for tomorrow work.
Watch out!
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 7:29pm On Apr 04, 2021
samyj2477:
how about the 4 units of mini flats... how many room is in a flat... or is it self contain?
We have 6 units of 2bedrooms flats and 2 units of mini flats, total 8 flats
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 3:51pm On Apr 04, 2021
samyj2477:
waoo so nice. How much would it cost to build this. give me as estimated amount range.
Budget btw 30-35m

Thanks so much for your time here
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 3:49pm On Apr 04, 2021
bayo2018:
How many plot of land is that and what’s the dimension Bossun
The land measured about 950 meters square
(1 and 1/2 plot of land )