Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 11:18am On Feb 14, 2021
RobbStark:
Isn't it risky standing on stacked blocks like that and be carrying out plastering.

Always consider safety. It's very important for everyone.

I know you said the #2.5m is for carcass only.
I wanna ask does it include all the materials bought up to that level of work or Labour cost alone.

great job I must say
Yes I get you right, safety is paramount In any field.
As you can see we have used scaffolding to work on that sport earlier so the block set up there was used to do little smoothing but never the less I will stick to your advise
Thanks.

The said amount 2.5m cover the the cost of materials and Labour to carcass level.
Properties › Re: Handlings Of Anambra Edifice By Rotech77 by rotecch77(op): 9:44am On Feb 14, 2021
Pics update

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 9:16am On Feb 14, 2021
megacontrol:
3-storey building?
Do have a design and drawings already?
You need the complete suite of drawings for this - architectural, structural, mechanical and electrical.

Then use your drawings to get a comprehensive quote from a builder and/or QS through a paid service. you definitely can afford one.

Pls don't play pro bono games with that kind of structure. it also depends on what you are building...flats, shops, mixed development or others.
Best advise
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 9:15am On Feb 14, 2021
Centrallock:
I had this bathtub i bought a direct Belgium, wanted to use it in my apartment but i later decided to get something of a better quality if your in enugu and need something like this kindly reach out regards.
This steel bath you abandon is far better than that fiber bath you used over there.
You will change it in next 1year
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 7:24am On Feb 14, 2021
Work is in progress here ....pop ceiling
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 7:18am On Feb 14, 2021
Watch out for update here soon
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 7:17am On Feb 14, 2021
Others finishings loading....

Tiling
Pop ceiling
Electrical wiring and lighting
Plumbing fittings
Painting
Properties › Re: Handlings Of Anambra Edifice By Rotech77 by rotecch77(op): 7:16am On Feb 14, 2021
More coming
Properties › Re: Handlings Of Anambra Edifice By Rotech77 by rotecch77(op): 10:00pm On Feb 13, 2021
Plastering, window design, body designs almost finished

Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 9:56pm On Feb 13, 2021
Homextras:
Rough estimate to complete this project please?
40m with finishings
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m):
michlins:
I just dey laugh who is waiting for prices to come down.


My quotes no dey last pass three days. When you ask me for price, my answer is usually "are you doing the job immediately"


It's painful experience cause it makes one look unserious. Imagine dropping a quotation on a weekend and to change it all again by Monday
My brother the issue of prices/ quotation now is a serious issue.
But ones you put clause in your quotation you are safe.
Or beta still I ask my client to procure materials There selves
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 8:41pm On Feb 12, 2021
Focusmind:
Bro, what type of door is in the front of that veranda? My own veranda is not fully covered by the roof like this one as I want to feel and see direct sunlight and clear sky when in the balcony. My concern is the door as the door will be exposed to the rains. I intend using hard wood (iroko) mahogany wood but don't know how sensitive it is to the waters.
What am trying to show their is the railing.

About your door I will advise you to go for real iron door made in Nigeria not all those Turkish made oo bcs 95pec of those Turkish made are not real iron
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 8:00pm On Feb 12, 2021
fabulous85:
chairman you promised to give break down of the quantity of electrical cables used. give us a summary.
Yes, I will do that.
Here is the cost of veranda wrought iron hand railing
Each unit of the veranda cost 75,000

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 7:28pm On Feb 12, 2021
Rexology:
With the current price of building materials, it has now become difficult for an average Nigerian to build.
Infact we don’t know where we are going in this country again.

I waited for pop materials price to come down for the past 1 month yet I still bought it for
7500 per bags and 2000 for 1kg filers.

150 bags bought
200kg filers bought also
Our budget was 450k before now we have spent about 1.2m on materials ONLY.

Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 6:33pm On Feb 12, 2021
abbeyboy2o15:
ok thanks brother.
You are welcome
Properties › Re: Handlings Of Anambra Edifice By Rotech77 by rotecch77(op): 5:50pm On Feb 12, 2021
Current update pics coming soon
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 5:37pm On Feb 12, 2021
150 bags of pop cement delivered to site today at rate of N7500 per bag

Filers 100kg N200,000

We are starting soon
Watch out!

Properties › Re: Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 by rotecch77(op): 1:46am On Feb 12, 2021
Reach out to us
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 9:05pm On Feb 11, 2021
Stainless railings for the stair ways and wrought iron hand railing for the outside veranda is in progress
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 4:03pm On Feb 11, 2021
In other news
Installation of the stainless door I mentioned last time is in progress

Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 3:24pm On Feb 11, 2021
Installation of the specifically made stainless door in progress

Properties › Re: Handlings Of Anambra Edifice By Rotech77 by rotecch77(op): 8:12am On Feb 11, 2021
External Body design in progress here

Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 7:45am On Feb 11, 2021
Pics loading...
busy at another site
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 7:44am On Feb 11, 2021
Pop, Tiling, installation loading..
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 7:40am On Feb 11, 2021
abbeyboy2o15:
Do you know any place they see quality tiles or a good tiler, although the work is in ibadan.
I think you will get around iwo road roundabout area.
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 10:42pm On Feb 08, 2021
abbeyboy2o15:
Please can you give me the list of quality tiles to use for my project.
Your budget will determine the type of tiles to buy for your project.

But here is a suggestion

Nigeria wall tiles from 1400-3800
Wall from 1500-1600

Spanish floor tiles from 5500-10,500
Wall from 4000-5500

All per meter square
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 5:36pm On Feb 08, 2021
Constructing of the steel stair way is in progress

Properties › Re: Handlings Of Anambra Edifice By Rotech77 by rotecch77(op): 3:29pm On Feb 08, 2021
Wall design mould

Properties › Re: The Benin Kingdom Project By Rotech77 by rotecch77(op): 3:10pm On Feb 08, 2021
Reach out to us today
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 3:09pm On Feb 08, 2021
On the way
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 8:06pm On Feb 07, 2021
Beframia:
Oga, show us pics nah. grin
Haa ...no vex for me sir
I will upload pics soon
Properties › Re: Public Display Of All Plumbing/sanitary Wares Prices by rotecch77(op): 8:40am On Feb 07, 2021
100mm Upvc pipe 2300/1800
50mm “ pipe 900/1600
25mm “ pipe 800/1000
25mm Tiger Materials 100
20mm. “. “. 70
15 mm. “. 50
Regular wc 16k
Top flush regular 31k
Top flush executive wc 50-120k

Call 08066619493