Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 7:20am On Dec 31, 2024
Ibadan mini shopping mall… 3 floors structure
Client; Old NL member.

Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 7:16am On Dec 31, 2024
Ibadan mini shopping mall project… 3 floors

Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 11:19am On Dec 27, 2024
Mechanical aspect of the 3rd building is in progress
While earth fill of the 4th building fdn is going on
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 9:54am On Dec 26, 2024
Ibadan project 3 floors mini shopping complex sitting on 1/2 plot of land.

Real tmt iron rod bought by the client
16mm 1.4m per ton ( 1pcs N26,500)
12mm 1.4m per ton ( 1pcs N15,000)

The thickness of the 12mm tmt Tiger is same with 16mm regular local

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 8:56pm On Dec 25, 2024
floshady02:
@rotecch77 Forget it. Whether engineer na money bag or not, no engineer will take up a project with the aim of not gaining. Some will aim to gain a whole lot while some will be considerate. There’s nothing like engineer just want to deliver the job. Even family member wey be engineer go wan benefit from you not to talk of outsider engineer. Like I said before, it’s always a great idea for clients to have knowledge in this field for so many reasons if not, chai 🙆‍♀️

Rightly said; some artisans contractors , Engr’s are killer NOT ALL oo some Engr are money bag o they are more ok than some client oo they don’t care about your money all they care about is to delivered your job as agreed , those rogue ones they notice that the project belongs to diaspora client’ they will change there mode of operandi ,, they believed that those people picks money on ground over there.
Also some client do shot there selves on leg bcs they will go for lesser labour cost quotation not knowing that the project handler as inflated Material cost, and quantity
Once the client later says look I’m buying materials myself Gbam whalah will start.

My brother So many things do happen in this field oo
Try to read again,you don’t get me right , we are talking about reap off not gain, who will work without gain? May be the person is an angel shaa Abi charity organization work lolz
To Engr, artisan, contractors is it our birth right to buy materials ? NO, if you notice that your client don’t trust your materials quotation leave it and focus on your charges.to save you from long episode of explanation and embarrassment.
Focus on your charges and deliver the job as agreed. Lastly lets your client monitor the usage of the Materials he or she supplied.
Shikena
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 8:07pm On Dec 25, 2024
floshady02:
@rotecch77 but that’s what they’ll say especially when owner is in diaspora. They will give prices for original Real Tiger TMT rod but buy local and eat the rest of the money. It’s always better for clients to have an idea of prices before asking anyone at all to go ahead and buy the materials for them or better still clients should buy themselves. Imagine how high the carpenter quote is a whole 800k ahhh 😱. And the rest. Dem don use billing finish the man. It’s not nice money is not easy to come by.
Gentle man; it’s being long I gave advice concerning this type of discussion here.
But let me tell you the truth.

The granite price @450k for 30 tns is very ok
The iron rod cost your Engr gave is VERY CORRECT provided he is buying original one like
REAL TIGER TMT .. the price in mkt now is 1.3 to 1.4mPer ton But if it’s ordinary local it’s far lesser

More so I can’t talk about the quantity needed bcs I don’t know the size of your building .
Furthermore he gave cost of carpenter together with Materils I.e bamboo, plank . 2*3 plank and the rest that is why the price is high, but you can price it to your budget
People should not assumed all prices are high without proper checking

Personally now I do asked my clients to buy materials themselves to reduced my stress unless if he or she says time can’t permit,then I will do the buying
Rightly said; some artisans contractors , Engr’s are killer NOT ALL oo some Engr are money bag o they are more ok than some client oo they don’t care about your money all they care about is to delivered your job as agreed , those rogue ones they notice that the project belongs to diaspora client’ they will change there mode of operandi ,, they believed that those people picks money on ground over there.
Also some client do shot there selves on leg bcs they will go for lesser labour cost quotation not knowing that the project handler as inflated Material cost, and quantity
Once the client later says look I’m buying materials myself Gbam whalah will start.

My brother So many things do happen in this field oo
Properties › Re: Construction Diary Of 8units Of 2/3brds Flat Structure By ARBO CONTRACTOR LTD by rotecch77(op): 5:21pm On Dec 25, 2024
We are here bcs of you
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 5:20pm On Dec 25, 2024
watch out for more update
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m):
Lampert505:
hello. Good evening guys
I got this decking quotation from my engineer.

How do you guys think I could cut cost pls
Gentle man; it’s being long I gave advise concerning this type of discussion here.
But let me tell you the truth.

The granite price @450k for 30 tns is very ok
The iron rod cost your Engr gave is VERY CORRECT provided he is buying original one like
REAL TIGER TMT .. the price in mkt now is 1.3 to 1.4mPer ton But if it’s ordinary local it’s far lesser

More so I can’t talk about the quantity needed bcs I don’t know the size of your building .
Furthermore he gave cost of carpenter together with Materils I.e bamboo, plank . 2*3 plank and the rest that is why the price is high, but you can price it to your budget
People should not assumed all prices are high without proper checking

Personally now I do asked my clients to buy materials themselves to reduced my stress unless if he or she says time can’t permit,then I will do the buying
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 9:19am On Dec 25, 2024
Compliment of the season to you all

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m):
Progress update; roofing wood work almost done

Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 4:00pm On Dec 23, 2024
3rd building roofing wood work almost completed as at this hour

Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 3:56pm On Dec 23, 2024
Progress on 4th building fdn

Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 7:25am On Dec 22, 2024
More loading

Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 7:21am On Dec 22, 2024
More

Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 5:11pm On Dec 21, 2024
Watch out for more pics
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 5:08pm On Dec 21, 2024
Hidden flat roof wood work is in progress

We are also in Earth filling stage of the 4th building

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 4:31pm On Dec 20, 2024
VanuatuWycombe:
You have heard the truth. Buy your blocks yourself and other key materials. Create the time. Cements, sands and rods don’t need any specialty knowledge to buy them.
Let him tell you what you are using. Seek clarifications from him where you are not sure. Gather more up to date infor about the material. Enter shop/market.

He will rïp you off. Those people are not to be trusted at all.

Don’t be afraid of any contractor. Na you give am work. Monitor it’s usage, biko.
Hmmm
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 9:41pm On Dec 19, 2024
Ibadan 3floors structure update coming soon
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 9:39pm On Dec 19, 2024
More

Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 5:37pm On Dec 18, 2024
Ask me about this cost saving plastering, which doesn’t need wall screeding again

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 5:28pm On Dec 18, 2024
OUR NEW PLASTERING METHOD
The plastering finishing will looks like SCREEDED WALL , very smooth without any holes
You don’t need to spend MILLIONS again on screeding that will still later crack.
And guess what it’s pocket friendly cost

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 4:55pm On Dec 18, 2024
Ibadan project …. Watch out!
Setting out done
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 9:30pm On Dec 16, 2024
topsy23:
The client really value quality in this installation using Schneider DB, switches and sockets .. One of the most expensive DB.

Well done oga Rotecch
Yes Engr, you are 100pec right
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 12:03pm On Dec 16, 2024
Plastering of the inner parapet area before roofing wood work is in progress
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 11:49am On Dec 16, 2024
Plastering of the hidden roof parapet area is in progress

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 11:47am On Dec 16, 2024
HRtechnique:
How much did it cost to get this truck?
It depends on the size and location of your site.
This cost me 350k
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 11:26am On Dec 13, 2024
Roof loading

Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op):
Roofing loading

Properties › Re: Construction Diary Of 8units Of 2/3brds Flat Structure By ARBO CONTRACTOR LTD by rotecch77(op): 9:12am On Dec 13, 2024
We are here to handle your project
Properties › Re: The Erecting journey of 2stories building of 12 flats by Arbo Contractor Ltd by rotecch77(op): 9:12am On Dec 13, 2024
We do construction right
Properties › Re: Remodeling Of Old Duplex To Modern Type By Arbo Contractor Ltd ( Rotech77 by rotecch77(op): 9:11am On Dec 13, 2024
We are here for your project