Rotecch77's Posts
Nairaland Forum › Rotecch77's Profile › Rotecch77's Posts
1 2 3 4 5 6 7 8 ... 228 229 230 231 232 233 234 235 236 (of 332 pages)
Pis is there now sir, More Thailand wc white (warranty 20yrs) Additional component *single thailand basin tap *pan connector *magic trap *thailand seat cover *flexible conn Price tag white N43k
|
Good china made twyford wc white Added components *original thick wc seat cover. *original tiger flexible connector *original pan connector *china single turning basin tap *basin magic trap *long thick basin screw/peg Price tag N23,000 white Colour N25,000 Pics loading
|
@jumgy,i will do so soon watch out. Pics loading |
Thanks madam |
No sir, but its like someone posted such design sometimes ago here on nairaland,i will check again if i can still get the tread |
@egun, yes the under counter top is also unique and very superb design. @flaghouse thanks so much may Almighty God be with you and the rest of the nl member. @hajji thanks as usual sir. @kopell thanks sir, i will give the current update about the prices always , one thing is sure all prices can not be the same everywhere in nigeria but you will get good deal here i promised you all more so any where you wantwd to buy you will get the price idea here before you order for it in your preferable local shop |
This design is mainly designed for cabinet which is the modern kitchen design throughout the world now and it will show the marble top without the tray (wing) i so much like it because the inner part of it is very deep to accomodate plates |
Nice one |
Good one this isnot china |
More
|
LETS GO. All prices can change but i will keep the update live. All 1/2"pressure fittings tiger product N20-60 All 3/4" " " " " N35-70 1" N40-140 11/4. " N70-250 NOTE why price range is bcs we have various type of these fitting such as tee, elbow, union, reducer etc in each sizes but all tstill fall under this price. 2" local bend N35 2" local tee N50 2" imported bend 130 2. " tee. 250 4" imported bend 600 4" " tee. N750 4"pvc pipe 850,1300,1700 diff thickness 2" pvc pipe 500,950. Diff thickness Technogreen product 1/2 " materials 60-450 3/4" material 70-550 1" " 80-650 Ench product 1/2materials 400/550 3/4 material 800/1000 Local Floor drains 150 Imported made 450 China pump surface 1hp 17-22k 1.5 hp 22-28k European surface pump 1hp 30-45k 1.5 hp. 45-55k China surbmersible pump 1hp 28-35k 1.5hp 35-45k European surb pump 1hp 75-100k 1.5hp 95-120k China wc ordinary 11k twyford make (replica) Chine execution 23-32k incude basin and pedestial Thailand product 45-85k Genuine England wc 85-200k. KITCHEN SINK Sink single china 4500-5500 Sink Thailand single 6500-7500 Doue china sink 8500-14000 Thailand 15000-18000 European sink single 17000 European sink double 75-95k More more coming |
Thanks brother,happy wkd
|
Happy 1st weekend of the yr |
More
|
Watch out for the beginning of the prices tomorrow |
More comets are welcome |
This year will be a good one for all of us i can see that. Very good observation from oga egun. |
More
|
This tread is to showcase some of our plumbing work,eletrical,tiling and others finishings only. Lets go. 08066619493.call and watzap. Rotech77@yahoo.co.uk Our others tread such as construction , sales, is very active
|
I see that public display of prices of things in nigeria is nothing to write home about just like western word use to do. Such as Wal-Mart Home depot E bay. Etc I can see that here in nigeria the the problem is some people have dubious characters, some are afraid of loose customers, although i can see that those who are willing to display the price will have doubted mind that his own product is genuine one and if he display the price some buyer will say the prices are too outrageous. knowingly that there are many fake product that looks alike with lesser price but which is not clear to the buyer This tread is to showcase cureent prices of plumbing fittings and sernitary wares prices to the public. Such as plumbing fittings , tee, elbow, control, taps etc SERNITARY ware such as water closet, heater, basin etc with pics. More so you can send your quote here and i will give you public advise and also see to the quote if its ok. I will like to stop here for now and see your opinions about the tread. 08066619493. Cc, hajji Mufutau,daboob,egun,egin, kenasu and others |
Thanks you all for your support and patronages since we stated this tread uptill now you people are still there for us kudos to you all may Almighty God be with you all 2018 *deal pics will always be posted. *price list will always be unvail. *free delivery will continue (few items doesn't fall into this . *warraty on our product will also continue. *good customers relationship will not stop. *new way of fast delivery is in place. * the trust you have in us still stand firmly. Contact 08066619493 call /watzap Rotech77@yahoo.co.uk. |
@bixton, there will still be little sediment likely to be occure in small quantity in section A of the safety tanks Although it will be increases as year goes on but it will take so many yrs before it will filled up, Moslty its foul water that do filled up most non sectional safety tank but in this case the foul water will be semi clean and sink down at suck away section of the system mostly in dry land area. |
This one weak me oo |
@aventure thanks for more input if i said it will work , it will work by channeling the water to the public drainge which i said ealier, .the only details that is not in my post is that the water needs to be treated.thanks for more explanation (mostly recycling method is well adopted by european ) We expect more info from you people |
More new things coming soon |
@Topsy long time how work ,nna only you dey chop your money you no dey call me again... back to your question it will work fine in any terran the waste water from the suck away will be channel to public public drainage as normal way we channel water to the drainage since water logged area land cant suck much water during the raining season.... ( there will be no foul odor) @diordave and hajji i will surely post the pics here. Infact i dont know you did same before although that is the standard To say the truth that is the way standard suckways/safety tank should be , check building construction book you will find it there....hafold seeley i beleived it should be there or any other building construction book |
END OF THE YEAR FREE TIPS ON BEST WAY TO CONSTRUCT SUCK AWAY AND SAFETY TANK THAT CAN LAST 50YRS BEFORE EVACUATING IT best way to construct this system for both residential and commercial buildings. All water from the safety tank will later go to suck away plus water from bath all together which will then be sink down. Dont be surprised the water from the safety tank foul water.(shit water) will become semi clean as that of bath water when it comes out from that last section of the safety tank without bad odour. More details coming soon when i have much time to write how this system work. More so i will send the current one am work on when i resume back to work See the sketch
|
@diordave,you are right its work of pop to make the wall surface smooth but painter need to prepare any surface he or she wanted to work on to be more smoother than that of pop guys bcs painters do the wall finishings after there work no more wall finishing on the said surface |
More new things coming this new year |
Thanks my brother, i did the wall boundry for nairaland there member there but it not shoprite the site is just close to shoprite. Thanks ones again Happy new yr in advance to you. |
@segzy14 you are correct people are now using the height you just mentioned but there is standard set for most of the building component ONLY window thaat doesn't have standard throughout the word windoware only constructed according to the structure or the occupant However *saydfact* is still correct I also think may be they can do new edition of standard buildings code again as things are changing everyday |
@kaybthaniels. Its just that here in nigeria the percentage of the people that follow standard building code to erect our building and others related structures are few. Although the problem is the country we are i beleived every body like good things at the right time The country economy doesn't permit most poeple to follow the standard which caused building collapsing everywhere now. Some that dont have money are ready to wait and save somemoney to start the project but before you know land graber will sell off the land. Already this building as attached by biological defect, And you need to correct it now so that you building will not become sick. ( dont be surprised building do sick and they do diagnose it) SOLUTION . What you wanted to do now, i can term it as floor finishing/finishings (BECAUSE what is entails to be oversite concrete is no more there.) You need to uproot any small trees there and prepare a well good grade of concrete mixture may be gade M10 and of well workable concrete and stuffed the block holes there with hardcore (because i can see that you use 225mm block for the substructure and 150mm for the superstructure which gives gap holes). You can .make the concrete thickness to be 75-100mm , this is not the oversite concrete standard but just because you wanted to safe cost and as i terms is as floor finishing Also when you wanted to do the outer wall rendering and inner part of the building plastering make sure you use standard mortar ratio for the job because that biological deafect as affected the block to be weak a little. |
1 2 3 4 5 6 7 8 ... 228 229 230 231 232 233 234 235 236 (of 332 pages)