Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 6:55am On Nov 11, 2021 |
More areas painted, more pictures later today.
|
Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 6:52am On Nov 11, 2021 |
Swimming pool reinforcement works ongoing in this site........
|
Properties › Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(op): 6:47am On Nov 11, 2021*. Modified: 7:36am On Nov 11, 2021 |
The rains are still very much around in Anambra
|
Properties › Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(op): 6:44am On Nov 11, 2021 |
Concrete cast of the beams..........
|
Properties › Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(op): 6:43am On Nov 11, 2021 |
SKINDOGGY: na d kind building I dy like and na wetin I go build soon Amen, we will be there to celebrate with you. |
Properties › Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 6:41am On Nov 11, 2021 |
Production of more POP ceiling boards yesterday morning. Theseboards will be used for the rooms downstairs........
|
Properties › Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 6:39am On Nov 11, 2021 |
More pictures of works later, we started the tiling of the curling staircase yesterday morning........
|
Properties › Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 6:33am On Nov 11, 2021 |
Pardon the interruption...........
|
Properties › Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 6:28am On Nov 11, 2021 |
More bathrooms being done, we haven't started working on some floors yet.........
|
Properties › Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 6:23am On Nov 11, 2021 |
Wall tiles going on on other bathrooms in this house.........
|
Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 5:57am On Nov 11, 2021 |
Oduduwa707: Sir, if you don't mind, what's the total cost of the roofing woodwork for this project?
Thanks Good morning, the whole roofing wood, plus cost of workmanship is about N1,138,720.00. Thanks. donforeign: How much did you get this shower set? Not sure about this one. |
Properties › Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 6:55am On Nov 10, 2021 |
rajput4real93: Oga spyder, please what is the use of the 1mm single core cables? Because some people say 1mm single core can be used for lighting, provided it's ORIGINAL. Please enlighten us boss Yes, 1mm single core cables are used for lighting points like bulbs and its switches in this era of low wattage appliances like bulbs and LED fittings. Companies that manufacture complete gauge products are always preferred. 1mm cable in a good company doing complete products is almost equivalent to 1.5mm cable in a company with less quality products. |
Properties › Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 9:37pm On Nov 09, 2021 |
Ongoing bathroom tiles work, we are doing all the bathroom walls now.........
Master bedroom walls
|
Properties › Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 9:20pm On Nov 09, 2021 |
This type of burnt brick tiles, will be good for this house front...........
|
Properties › Re: Please This Quotation Is It Too Much by spyder880(m): 9:15pm On Nov 09, 2021 |
emmaak2: Cc Spyder880 I dont think it's bad. Some of the prices there are what I buy the stuff, even last week. Pipes are N4,000 each, (Niger). WC is around that N25,000 to N26,000. The only thing you should be checking is actual quantities used. Plumbers are notorious for giving bogus quantities in their estimates, the honest ones will give you back the remnants while the not so honest ones will dodge the remnants. Just watch them. |
Properties › Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 6:55am On Nov 09, 2021 |
Celepope: Prof. Please respond to this my humble question. An average of N1m for a duplex. Good morning. |
Properties › Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(op): 6:43am On Nov 09, 2021 |
michlins: You're doing well.
Jisie ike Thank you bro. |
Properties › Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(op): 8:03pm On Nov 08, 2021 |
We are almost ready to come out and paint the outside walls......... |
Properties › Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(op): 7:56pm On Nov 08, 2021 |
More at random..........
|
Properties › Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(op): 7:51pm On Nov 08, 2021 |
Random
|
Properties › Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(op): 7:45pm On Nov 08, 2021 |
Random........
|
Properties › Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(op): 7:41pm On Nov 08, 2021 |
At random...........
|
Properties › Re: The Making Of The "Enugu Block Of 12 Flats Of 1 Bedroom Apartments" by spyder880(op): 7:38pm On Nov 08, 2021 |
|
Properties › Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(op): 7:37pm On Nov 08, 2021 |
Some random pictures from some different flats and rooms............
|
Properties › Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(op): 7:35pm On Nov 08, 2021 |
Completing the staircase painting today........
|
Properties › Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(op): 7:31pm On Nov 08, 2021 |
Painting the staircase today.......
|
Properties › Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(op): 7:25pm On Nov 08, 2021 |
Completing the deep well today, the walls were cast all the way up with concrete
|
Properties › Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 7:23pm On Nov 08, 2021 |
Roofing woodwork in this house is nearing completion. |
Properties › Re: The Making Of The "Enugu Block Of 12 Flats Of 1 Bedroom Apartments" by spyder880(op): 6:32pm On Nov 08, 2021 |
Doors, keys about to be fitted........
|
Properties › Re: The Making Of The "Enugu Block Of 12 Flats Of 1 Bedroom Apartments" by spyder880(op): 11:26pm On Nov 07, 2021 |
Chriswazo: How much will be the rent for this 1 bedroom there? By the time we complete the house, we will gauge the pulse of the rental market before fixing prices. |
Properties › Re: The Making Of The "Enugu Block Of 12 Flats Of 1 Bedroom Apartments" by spyder880(op): 6:57am On Nov 07, 2021 |
Chriswazo: This was originally 3 storey, but while 2 now? Please how much is land this area now and is it available? Urs is 1 plot Money no dey, so we cut it down to 2 storey  Don't mind me, we considered the number of tenants that will be living in one compound (16) different people if we make it 3 storey, then we cancelled the idea and left it with 12 tenants instead. I heard on Friday that they sold the only 2 remaining plots in my street 10m for the unfenced one and 12m for the one with fence and gate. I bought for around N6.5m or more than that ending of 2019. More plots will be available for sale in this area, but not this street. This is one plot of 60 x 100. Happy Sunday my people. |
Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 11:37am On Nov 06, 2021 |
BiigTee: Good morning spyder880.. Pls what's the ideal number of block coaches after lintel(9 blocks before lintel) Good morning Sir, the house you are building, does it have a building plan? What was the original plan? |