Properties › Re: ABB Distribution Board And Schneider Distribution Board Our Choice by topsy23(op): 10:24pm On Mar 28, 2021 |
Call us today |
Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 10:23pm On Mar 28, 2021 |
Always at your service |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 5:54pm On Mar 28, 2021 |
Jasobry: I guess Kalsi board is manufactured by emenite in Enugu Nigerit'e also manufactured Kalsi board. |
Properties › Re: Electrical Piping Both Surface And Conduit by topsy23(op): 3:59pm On Mar 28, 2021 |
Happy Sunday to you all |
Properties › Re: Complete Package Design Drawing For Mech, Elect & Plumbing(MEP) with COREN Seal by topsy23(op): 3:56pm On Mar 28, 2021 |
Let's handle your MEP design |
Properties › Re: ABB Distribution Board And Schneider Distribution Board Our Choice by topsy23(op): 3:53pm On Mar 28, 2021 |
Fixing of DB carcas
|
Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 3:50pm On Mar 28, 2021 |
More pictures of our surface piping
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 3:40pm On Mar 28, 2021 |
sgtponzihater1: Who knows if using bricks outside and a board inside, like done in Europe, would reduce building cost in any way? Well only builders that have done such before would be able to answer that.. Nigerite is the manufacturer of Kalsi board.. what I know about the construction is that your project can be completed within a month |
Properties › Re: Building Your House: The Alternative Technology Route by topsy23(m): 1:56pm On Mar 28, 2021 |
Happy Sunday to you all |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 1:43pm On Mar 28, 2021 |
BrabusNG: You’re highly favored for the ongoing project BUT I’d appreciate if you can work with me at my level. Na kobokobo level 1 o 
We’re not going to ask you to compromise on your standards and also not make good project but we’d like you to see this as an opportunity to showcase the possibilities.
This is a project that tick all the boxes without breaking bank. You know what to expect from Brabus. Good - Fast - Affordable.
My client is reading this and he’d be happy we get on board the project. Planning for the finishes is already ongoing so it’s cool we bring in all the stakeholders at once.
Let’s play.
_________
The next thing you’d get from me are the M&E drawings. No problem |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 1:42pm On Mar 28, 2021 |
Greenarrow01: Bro Were you d one that did that board building or you were only contracted for the electrical and plumbing instanlations
Which is cheaper ? Normal block or those boards ? We only did the Electrical, plumbing and AC installation.. I don't know the cost of the project, but we complete about 8 buildings within 8weeks in Portharcourt, that's Rumuji area |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 11:18am On Mar 28, 2021 |
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 9:48am On Mar 27, 2021 |
|
Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 8:06am On Mar 27, 2021 |
More pictures
|
Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 8:04am On Mar 27, 2021 |
On going project
|
Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 8:01am On Mar 27, 2021 |
Our installation is second to none.. call us today and get the best from us
|
Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 7:56am On Mar 27, 2021 |
sgtkole: Your contact information sir Still waiting for your message |
Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 7:54am On Mar 27, 2021 |
We are here to give you the quality |
Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 2:48pm On Mar 26, 2021 |
Good afternoon |
Properties › Re: 3bedroom Foundation by topsy23(m): 1:39pm On Mar 23, 2021 |
mosefin19: No one to reply... pls u pple should reply ooo Am a learner here.... and am 24yrs just finish my nysc last month... and am doing well with my crypto and gift card trading which is where I have gotten some money and I think trying to set a 3bedroom is good idea pls my Ogas here should advice me ooo Open the below thread and post your question. You will get quick response from Engineers, Architect and builders https://www.nairaland.com/2550211/general-topic-thread-to-discuss-anything/2067 |
Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 12:21pm On Mar 23, 2021 |
Purechem
|
Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 9:16am On Mar 23, 2021 |
sureboykris: Good morning Sir... How many yards does it contain. What's your location please Its 100m Location Lagos state call or whatsapp me 08033643191 |
Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 6:18pm On Mar 22, 2021 |
sureboykris: Good evening. Please what's the cost of 16mm copper wire 93,000 |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 11:44am On Mar 22, 2021 |
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 8:04am On Mar 22, 2021 |
Good morning to everyone from this side |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 6:47am On Mar 22, 2021 |
OnMyHonor: Sir, l still need your help. I am trying to buy Armoured Cable and Aluminium but l will prefer to buy through a Dealer of say Coleman Cables, so it comes directly from the company and l am sure it is authentic. Are you a Dealer or can you (or anyone here) refer me to a Dealer, where the pickup can be from Coleman itself.
Items: - 150mm Steel wire 4-Core Insulated Armoured Copper-core Power Cable (NC2YRY) - 50mm 7/3.0 Aluminium Stranded Aerial Cable - 35mm 7/2.0 Aluminium Stranded Cable
Once again, Thank you Sir. I am a distributor . Let's chat on whatsapp 08033643191 |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 12:10pm On Mar 21, 2021 |
somehow: Thanks Can solar power be used to power ACs (2-3) without having to break the bank?
To use 2-3 ACs, only 2-4 bulbs and maybe 1 TV would be on.. Yes you can use solar inverter to power AC but the size rating must be between 10-15KVA. The load consumption of the conventional AC is high but there are some low power consumption AC called inverter AC.. |
Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 2:40pm On Mar 20, 2021 |
Happy weekend to you all |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 8:22am On Mar 20, 2021 |
mescan: services of a good architecture needed. The contact me on 08032304444 We can handle your MEP design for you sir |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 9:28pm On Mar 19, 2021 |
somehow: When we get to the bridge by his grace. No problem boss |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 8:38pm On Mar 19, 2021 |
somehow: Ok Are you into solar sir? No sir, am into electrical, plumbing and AC installation, But I have so many people that install |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 6:33pm On Mar 19, 2021 |
rotecch77: Let’s build this update/ cost.
A contemporary eatery design with pent. A story building consists of 6 flats.
What to expect - day to day activities pics update - cost per each stage - questions and answer about the project
Duration 180day ( for the eatery)
Arbo contractor Ltd ( rotech77)
Watch out for new thread for the project Nice one |