₦airaland Forum

Welcome, Guest: Register • Login • With Google • Trending • Recent • New

Stats: 3,345,473 members, 8,517,715 topics. Date: Thursday, 12 November 2026 at 09:56 PM

Toggle theme

Topsy23's Posts

Nairaland Forum › Topsy23's Profile › Topsy23's Posts

1 2 3 4 5 6 7 8 ... 79 80 81 82 83 84 85 86 87 (of 212 pages)

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 10:14am On Mar 07, 2021
Mup4life:
Thnk you how many pipes make a bundle?
25length

Also we have other cheaper pipes in the market but hardly bend and created a lot wastage on site
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 10:01am On Mar 07, 2021
Mup4life:
Pls what is the current price of :

1. Three phases DB d4. Schneider or ABB

2. 20mm and 25mm pvc pipes.


Cc topsy23
D4 ABB is 46000
Schneider 44000

Original DIGNITY pipe as at yesterday. Price of electrical materials are not stable these days..We contractor are really facing serious challenges in terms of materials cost ...
20mm 9000
25mm pipe 10500
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 1:02pm On Mar 06, 2021
Focusmind:
Yes Topsy, my concern mainly is on the unit price. We know how to handle quantities.
The picture is not clear enough
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 12:43pm On Mar 06, 2021
PAPAFEELERS:
Please is this a fair qoute? and if anyone know where one can get good quality ones in Abuja, kindly share.
Buyiing direct from manufactuerer is preferable because of the margins in comparison to buying from open market where one will not be sure of the quality.
cc:NE3T , Rotech, TwinnsKenny etc please help out
Why having 4coils of 16mm? what is the size of your project. Cable manufacturer increase price recently.
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m):
Focusmind:
Good!

My plumber sent this for plumbing work completion. Note that some internal plumbing work has also been done. Are the prices ok for the stated materials? Sorry, the background from where he took the picture looks faint and blurred.
We can not say anything about the quantities because there is no mechanical drawings
Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 6:03am On Mar 05, 2021
Call us today..
Properties › Re: ABB Distribution Board And Schneider Distribution Board Our Choice by topsy23(op): 7:29pm On Mar 02, 2021
Rexology:
There is no water heater, should I still go ahead with the 6way 3phase?
4-way 3-phase should be okay

ABB 48,000
Schneider 46,000
Properties › Re: ABB Distribution Board And Schneider Distribution Board Our Choice by topsy23(op): 3:05pm On Mar 02, 2021
Rexology:
@topsy23, please what capacity of DB is ideal for a 3bedroom bungalow?

What is the price of the original and the cost of sending it to Makurdi.
For a standard 3bedroom flat with the following features

AC 4nos
Water heater 3Nos
Cooker unit 1
lighting point
Socket outlet
External light

6-ways 3-phase is okay for the total load

Price

ABB 64,000
Schneider 58,000

cost of transportation to Makurdi is around 5,000
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 5:52pm On Mar 01, 2021
Hatesin:
Happy New Month to the Honourable House. Please, am confused as to the right Electrical materials needed for the electrical wiring of a 3 bedroom bungalow. Need help.....
Send me your plan to 08033643191
Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 9:09pm On Feb 28, 2021
Coleman is set to increase price of cables tomorrow...

God help us in this country
Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 7:15am On Feb 28, 2021
Happy Sunday to you all
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 9:18am On Feb 27, 2021
shogbenga:
The plan is for a building in an estate. I am only allowed to modify the interior. The windows and doors must remain where they are. Thanks
There should be a door at the kitchen area
Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 3:00pm On Feb 26, 2021
Thanks for your calls
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 2:48pm On Feb 25, 2021
Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 2:15pm On Feb 25, 2021
Sent to Kano this morning.

Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 9:49am On Feb 25, 2021
We are here to give you the best
Properties › Re: ABB Distribution Board And Schneider Distribution Board Our Choice by topsy23(op): 9:22am On Feb 25, 2021
nelsonB:
Good morning @Topsy23 how many way distribution board do you advice for a mini 4 bedroom duplex... Please email cost both ABB and Snyder and way bill to portharcourt to helen4free@yahoo.com. Thamks
Sir, did you get my mail yesterday
Properties › Re: ABB Distribution Board And Schneider Distribution Board Our Choice by topsy23(op): 10:41am On Feb 24, 2021
nelsonB:
Good morning @Topsy23 how many way distribution board do you advice for a mini 4 bedroom duplex... Please email cost both ABB and Snyder and way bill to portharcourt to helen4free@yahoo.com. Thamks
Thanks for visiting our thread.

I have sent the mail to you
Properties › Re: ABB Distribution Board And Schneider Distribution Board Our Choice by topsy23(op): 1:28pm On Feb 23, 2021
Thanks for your patronage
Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 8:42am On Feb 23, 2021
Delivered to ikorodu

Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op):
REMARKS FROM THE CLIENT.


[2:36 PM, 2/21/2021] Client : Thank you. My sister is a good person in eve upry way and I understand you have worked hard, professionally, and competently. It's the least we could do.

My regret is we could not use you for the original Installation but that is another story.

I have a series of initial positions I will set out in following notes due us to consider, at least until I receive the final report.
[2:37 PM, 2/21/2021] Client. We are paying for 3 phase supply, have a 3 phase generator, 3 phase DBs and PHCN meter - but only connected to one phase?
I can understand if the upper apartments are single phased but the ground floor and outbuildings need to be distributed across 3 phases.
[2:37 PM, 2/21/2021] Client. The earthing system needs to be restored as a matter of urgency.
Properties › Re: ABB Distribution Board And Schneider Distribution Board Our Choice by topsy23(op): 7:42pm On Feb 21, 2021
More pictures

Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 7:34pm On Feb 21, 2021
Call us today
Properties › Re: I Need A Surveyor & architect In Ibadan by topsy23(m): 4:22pm On Feb 21, 2021
Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 4:04pm On Feb 21, 2021
These are observations, all these will be well detailed in our report and add any other necessary ones.
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 3:58pm On Feb 21, 2021
topsy23:
@ n3xt pls check our thread for a power audit and revamp work in Portharcourt.

https://www.nairaland.com/1233943/contact-us-electrical-mechanical-plumbing/29
We are in the concluding part of the power audit in Portharcourt
Feel free to check it out to learn one or two things and we are also available for questions and clarification.

https://www.nairaland.com/1233943/contact-us-electrical-mechanical-plumbing/29
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 3:08pm On Feb 21, 2021
sinorte:
Kindly reach out if you can make the TV stand below and/or any other similar designs.
Contact Dominionng
Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 3:02pm On Feb 21, 2021
More pictures from the Power Quality Analyser

Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 2:58pm On Feb 21, 2021
In the main power distribution room, the power quality analyser was plug for about 3hrs to monitor and examine the quality of power distribution within the facility, below are the picture updates and our observations


* The supply voltage is healthy
* A single phase distribution system is noticed, with all loads on blue phase only. The other two phases are abandoned. This will caused unbalanced load the 30kVA generator, and effect is damaging.
* Excessive current is seeing on neutral line.
* No earthing system around here.
* Load on blue phase alone gets above 200A
* Frequency is normal
*Harmonics is fine

Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 2:52pm On Feb 21, 2021
More pictures

Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 2:38pm On Feb 21, 2021
The concluding test on the 4nos. Distribution boards

Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 2:27pm On Feb 21, 2021
Some circuits are having appropriate voltage while some are having high and other are low. Pictures below

1 2 3 4 5 6 7 8 ... 79 80 81 82 83 84 85 86 87 (of 212 pages)