Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,153,706 members, 7,820,463 topics. Date: Tuesday, 07 May 2024 at 03:25 PM

CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI - Properties (54) - Nairaland

Nairaland Forum / Nairaland / General / Properties / CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI (226572 Views)

PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI / PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI / Construction Process Of A Wing Duplex+flat At Ajah (2) (3) (4)

(1) (2) (3) ... (51) (52) (53) (54) (55) (56) (57) ... (101) (Reply) (Go Down)

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 5:09pm On Mar 23, 2016
MOORE-DESIGNBUILD LTD


--------
mooredesignbuild@gmail.com
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:28am On Mar 24, 2016
Steps tiles

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:29am On Mar 24, 2016
Steps tiles for the detached house

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 2:57pm On Mar 24, 2016
segcymoor:
Now available for sale off!
Delivered period:May 2016
Details:4 bedrooms with attached BQ
location:Just by Chevron toll gate
Price:55m (Still negotiable)
Facilities:Ample parking ! Swimming pool and more

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 12:00pm On Mar 25, 2016
segcymoor:
Now available for sale off!
Delivered period:May 2016
Details:4 bedrooms with attached BQ
location:Just by Chevron toll gate
Price:55m (Still negotiable)
Facilities:Ample parking ! Swimming pool and more
still available

1 Like

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 3:58pm On Mar 26, 2016
Fixing of burglary

1 Like

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 4:00pm On Mar 26, 2016
Fixing of burglary


-------

1 Like

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 9:50am On Mar 27, 2016
Ceilings and floors finishing

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 8:24am On Mar 28, 2016
Happy Easter to you guys!
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 9:33pm On Mar 28, 2016
Tiling on step

____
steeping up in style

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by lucien4scaffold(m): 4:28am On Mar 29, 2016
segcymoor:
work

if use our steel post shores, it wont needs so many bamboo poles.

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by lucien4scaffold(m): 4:30am On Mar 29, 2016
segcymoor:
D conctrete is cure to loose d plank

these photos reminds me of a video that dismantle plywood after concrete forming, and they just pull out the supporting steel post shores, and then the plywood drops like rain down to the ground, kind of funny, but also dangerous.
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by lucien4scaffold(m): 4:33am On Mar 29, 2016
segcymoor:
welcome back....second slab

if slab supporting, it is better use steel post shores than use bamboo, to gain better loading capacity and also less density and less cost, both erecting cost less and materials cost less.

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:40pm On Mar 29, 2016
Cool
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:41pm On Mar 29, 2016
Noted......we put that into consideration
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by oduncojamaica(m): 12:03am On Mar 30, 2016
Farm1:


Its 3m away from other buildings and 6m away from the road (or 10m from the centre of the road). Which implies that for a corner piece, your set backs will be 3m, 3m, 6m and 6m while for other plots, it will be 3m, 3m, 3m and 6m

Hope that helps

pls what of half plot 30 by 120

1 Like

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by oduncojamaica(m): 12:05am On Mar 30, 2016
Farm1:


Its 3m away from other buildings and 6m away from the road (or 10m from the centre of the road). Which implies that for a corner piece, your set backs will be 3m, 3m, 6m and 6m while for other plots, it will be 3m, 3m, 3m and 6m

Hope that helps

pls what of half plot 30 by 120
what will be distance from next building
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 10:56am On Mar 31, 2016
View

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 11:17pm On Apr 01, 2016

1 Like

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 4:27pm On Apr 02, 2016
More tilling work

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by write2obi(m): 5:57pm On Apr 02, 2016
segcymoor:
More tilling work
Excellent tiling job.
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 2:56pm On Apr 04, 2016
write2obi:

Excellent tiling job.
We appreciate u for believing in us
Thanks!
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 2:41pm On Apr 05, 2016
Master's closet

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by frakdon(m): 8:03pm On Apr 05, 2016
segcymoor:
Master's closet
still waiting to hear from you? please don't forget.
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 9:45pm On Apr 05, 2016
frakdon:
still waiting to hear from you? please don't forget.
Sir many things on my head o.
Do remind me of d conservation
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by frakdon(m): 10:34pm On Apr 05, 2016
segcymoor:

Sir many things on my head o.
Do remind me of d conservation
yeah, I thought as much. Its about the aluminium windows?
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 1:27pm On Apr 06, 2016
frakdon:
yeah, I thought as much. Its about the aluminium windows?
I see
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 9:58am On Apr 07, 2016
Rails

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 10:19pm On Apr 07, 2016
Sweet home water heater courtesy ediasam abi wetin e call his name grin

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 8:48am On Apr 08, 2016
More plumbing fittings

---------
Washing hand basin and water closet

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 9:09pm On Apr 08, 2016
More.....

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by EndiaSami: 2:08am On Apr 09, 2016
segcymoor:
Sweet home water heater courtesy ediasam abi wetin e call his name grin
Haha. Oga mi, na endiasami
Thanks boss..God bless you


Choi, baba segcy, surest engineer ever liveth don endorse endiasami , like this gon my consultation fee don rise o. grin. Lol

(1) (2) (3) ... (51) (52) (53) (54) (55) (56) (57) ... (101) (Reply)

Prices For These Paints / How Large Is 'A Plot' Of Land? / Best Architectural, Interior And Construction Works

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 22
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.