Re: Engineers To Begin Work At Mambilla Hydro-power Project by MadCow1: 5:12pm On Sep 09, 2016 |
kings09: I am an employer of labour.. People like me don't go hungry. Just a heads up.. I am quitting my job at the close of this year to go into my business full time. 4 Likes 2 Shares |
Re: Engineers To Begin Work At Mambilla Hydro-power Project by Nobody: 5:13pm On Sep 09, 2016 |
Please o, i beg they should be fast about it, to shut the mouth of the IPOB and haters(PDP). |
Re: Engineers To Begin Work At Mambilla Hydro-power Project by hucienda: 5:14pm On Sep 09, 2016 |
kings09: wikid! 1 Like |
Re: Engineers To Begin Work At Mambilla Hydro-power Project by LordVoldemort(m): 5:14pm On Sep 09, 2016 |
Conceived in 1982, the main Mambilla Dam is a large rolled compact concrete dam and reservoir at 1,300 metres (4,300 ft) above sea level. On November 7, 2012 Nigeria signed a memorandum of understanding with China's Sinohydro Corp. to build Mambilla Power Station. Completion of the project is expected in 2018, and it is expected to multiply Nigeria's generating capacity considerably.[3] In December 2013, the Nigerian federal ministry of Power has released a statement that the contract with Sinohydro, has been cancelled, while the ministry is currently working on firming the project cost and that an ongoing discussion has been opened with Chinese EPC firms, interested in providing funding for the project. One of the things I love about this administration Is their willingness to complete all abandoned projects. Unlike some, they rather start a new project so they can say he did this whereas the money spent on the other project as gone to waste. Kudos my President You will make Nigeria great 7 Likes 1 Share |
Re: Engineers To Begin Work At Mambilla Hydro-power Project by ephi123(f): 5:17pm On Sep 09, 2016 |
abbccc: |
Re: Engineers To Begin Work At Mambilla Hydro-power Project by bayelsaowei(m): 5:20pm On Sep 09, 2016 |
MadCow1:this is always the reply of a disappointed supporter of apc...standwithbuhari until you become as skinny as he is... |
Re: Engineers To Begin Work At Mambilla Hydro-power Project by MadCow1: 5:25pm On Sep 09, 2016 |
bayelsaowei: Bros.. I am indeed disappointed. I was not hoping things would go like this. But the President has not given me cause to give up hope just yet. Until he does, iStandWithPresidentBuhari. Thanks. 5 Likes 1 Share |
Re: Engineers To Begin Work At Mambilla Hydro-power Project by feyisejoy(m): 5:27pm On Sep 09, 2016 |
ANBAKO: 1 Like |
Re: Engineers To Begin Work At Mambilla Hydro-power Project by FunkyMetahuman: 5:28pm On Sep 09, 2016 |
kings09:and how did you know he is hungry? you that is showing your frustration is obviously the hungry one. 1 Like |
Re: Engineers To Begin Work At Mambilla Hydro-power Project by FunkyMetahuman: 5:30pm On Sep 09, 2016 |
EazyMoh:what you are looking at there will be the biggest hydro power plant in Africa. |
Re: Engineers To Begin Work At Mambilla Hydro-power Project by obailala(m): 5:36pm On Sep 09, 2016 |
FunkyMetahuman:If I'm not mistaken, that picture put up by the Op isnt mambilla. |
Re: Engineers To Begin Work At Mambilla Hydro-power Project by FunkyMetahuman: 5:37pm On Sep 09, 2016 |
obailala:not sure either. |
Re: Engineers To Begin Work At Mambilla Hydro-power Project by EazyMoh(m): 5:55pm On Sep 09, 2016 |
FunkyMetahuman:Are you sure? Because if I remember well I read somewhere it's gonna be around 100MW. I think you are referring to the Gembu plant which is the one supposed to generate around 3000MW. All the same it's good development. |
Re: Engineers To Begin Work At Mambilla Hydro-power Project by Nwunuken(m): 5:58pm On Sep 09, 2016 |
Keneking:the water source is from river Donga 1 Like |
Re: Engineers To Begin Work At Mambilla Hydro-power Project by FunkyMetahuman: 6:00pm On Sep 09, 2016 |
EazyMoh:https://en.m.wikipedia.org/wiki/Mambilla_Power_Station |
Re: Engineers To Begin Work At Mambilla Hydro-power Project by InvertedHammer: 6:00pm On Sep 09, 2016 |
saints2:/ WHERE ARE OUR ENGINEERS?!!!!! REAL ENGINEERING GOES BEYOND CRAM AND PASS. \ 1 Like |
Re: Engineers To Begin Work At Mambilla Hydro-power Project by HAH: 6:01pm On Sep 09, 2016 |
And Dangote alone will produce 12000MW |
Re: Engineers To Begin Work At Mambilla Hydro-power Project by EazyMoh(m): 6:04pm On Sep 09, 2016 |
sseunhayor:The water has been diverted to allow for the construction. 2 Likes |
Re: Engineers To Begin Work At Mambilla Hydro-power Project by EazyMoh(m): 6:07pm On Sep 09, 2016 |
Re: Engineers To Begin Work At Mambilla Hydro-power Project by MICHEALADEX(m): 6:20pm On Sep 09, 2016 |
Whizzdom: Plz clean your eyes again and re-read it's by saint not whizydom |
Re: Engineers To Begin Work At Mambilla Hydro-power Project by Nwunuken(m): 6:26pm On Sep 09, 2016 |
ANBAKO:mambilla is in taraba 1 Like |
Re: Engineers To Begin Work At Mambilla Hydro-power Project by SpicyJosBabe(f): 7:00pm On Sep 09, 2016 |
ANBAKO: Mambilla is in Taraba state pls, not Adamawa 1 Like |
Re: Engineers To Begin Work At Mambilla Hydro-power Project by Nobody: 7:24pm On Sep 09, 2016 |
ABEG WE GO MANAGE EVEN 10HRS OF ELECTRICITY EVERYDAY |
Re: Engineers To Begin Work At Mambilla Hydro-power Project by rabex123(m): 7:56pm On Sep 09, 2016 |
MadCow1:Best reply ever. 1 Like |
Re: Engineers To Begin Work At Mambilla Hydro-power Project by Standing5(m): 8:03pm On Sep 09, 2016 |
kings09:Are Jonathan children in debt today? |
Re: Engineers To Begin Work At Mambilla Hydro-power Project by Charly68: 8:08pm On Sep 09, 2016 |
I trust Fashola,the man will deliver in his ministry . May God uphold you my man & grant you speed in the execution of your lofty projects. The president will surely deliver. The lingering problems is just for a little while. Things will surelly work in our country. 1 Like |
Re: Engineers To Begin Work At Mambilla Hydro-power Project by joinnow: 8:11pm On Sep 09, 2016 |
Hope they complete it. Project proposal was submitted in 2008 wow 8 years after common dam and hydro power Nigeria no fit finish I was at Gembu then also note Mambilla is the highest point in Nigeria Chilling weather.higher than Jos. |
Re: Engineers To Begin Work At Mambilla Hydro-power Project by CornelG(m): 8:16pm On Sep 09, 2016 |
Whizzdom: oboy only you how many girls no wonder girls this days always say majority of we men are unfaithful and am very certain is because of men like you! |
Re: Engineers To Begin Work At Mambilla Hydro-power Project by oluwasegun007(m): 8:17pm On Sep 09, 2016 |
My God..... When that small boy for North Korea they play anyhow with Nuclea power Na Hydro we dey celebrate for electric generation...smh |
Re: Engineers To Begin Work At Mambilla Hydro-power Project by Nobody: 8:49pm On Sep 09, 2016 |
[quote author=Princejebs post=49210895]Am asking, please did I just made FTC?[/quote Nop. you just made LTC. I hope you kniw what it means.... |
Re: Engineers To Begin Work At Mambilla Hydro-power Project by Nobody: 8:49pm On Sep 09, 2016 |
[quote author=Princejebs post=49210895]Am asking, please did I just made FTC?[/quote Nop. you just made LTC. I hope you know what it means.... |
Re: Engineers To Begin Work At Mambilla Hydro-power Project by Whizzdom(m): 10:27pm On Sep 09, 2016 |
CornelG: Am faithfull oo, but girls nowadays are unfaithfull. You know now. |
Rivers Assembly: APC Members Stage Walkout Over Imposition Of Minority Leader / Ganduje Bribery: Police Ban Students From Protest Against Kano Governor / Samuel Ortom Visits Senator Orji Kalu In Abuja (Photos)
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 38 |