PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI / CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI / . (2) (3) (4)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (40) (Reply) (Go Down)

Re: Construction Process Of A Wing Duplex+flat At Ajah by landt: 8:30pm On Apr 04, 2012
Thanks for your reply. My other observation is that I have not seen any colums or they will be planted later before casting the foundation since the building is going to be a duplex. Never mind my curiousty.
Re: Construction Process Of A Wing Duplex+flat At Ajah by blacklion(m): 5:43pm On Apr 06, 2012
@ Segcy - the raft foundation for the fence - is that a 3- or 4-board raft?

@ Gobi - I was recently given a quotation of N1.3m for 3-board raft for the fencing of a standard plot (60ft x 120ft) with sandy soil at Lekki.
Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 5:50pm On Apr 06, 2012
DAY 13; we completed the reinforcement work. and establised the column.....intend to cast d following day

Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 5:54pm On Apr 06, 2012
Reinfocement work

Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 5:59pm On Apr 06, 2012
DAY 14-Casting

Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 6:00pm On Apr 06, 2012
casting

Re: Construction Process Of A Wing Duplex+flat At Ajah by blacklion(m): 6:25pm On Apr 06, 2012
@ Segcy - the raft foundation that you are doing for this building - is that a 3- or 4-board raft?

segcy.moor:
DAY 13; we completed the reinforcement work. and establised the column.....intend to cast d following day
Re: Construction Process Of A Wing Duplex+flat At Ajah by gtrust: 10:47pm On Apr 06, 2012
Great Job!
Thanks for sharing.
Will be watching.

I particularly like your estimate of 13million.
Does this include your pay
Re: Construction Process Of A Wing Duplex+flat At Ajah by gtrust: 10:50pm On Apr 06, 2012
1 more question:
is it a duplex and 2 flats (one up and one down)?
Re: Construction Process Of A Wing Duplex+flat At Ajah by opiscopy(m): 7:04am On Apr 07, 2012
Nice work...more grease to ur elbow and more money to ur pocket smiley
Re: Construction Process Of A Wing Duplex+flat At Ajah by atasteve: 7:07am On Apr 07, 2012
Segcy, welldone on this good job. However you must take note that for us to enjoy this thread, you must kindly focus and shun all distractions.
Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 1:28pm On Apr 07, 2012
@gtrust. To the point of correction. plastering is not inclusive..Just frame structure which include- Complete raft foundation, column and suspended slab(otherwise known as decking) Column and roof beam and all block work with workmanship and labour...infact, it was my client that drawn my attention to d mistake because himself was on NL.----D designs is 4 Bedrm flat infront and 2 units of 2 bedrm at d back
Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 1:42pm On Apr 07, 2012
roof member with 0.5 gauge aluminium step tiles inclusives in the 13m
call-08023807960 or 07042144750 for more info
Re: Construction Process Of A Wing Duplex+flat At Ajah by gtrust: 3:24pm On Apr 07, 2012
Segci.moor, Thanks for getting back to me with the correction!

I find it very reasonable for the 13 million naira! wink

So, 4 bedroom Duplex infront with 2 unit of 2 bedroom flats
at the back (say 1 down and 1 up)?

Is this on a standard plot of land?
If yes, will there be space for packing, gate-house, ?boyz quarter

So, with 13 million naira I will get everything except plastering and furnishing right?
Re: Construction Process Of A Wing Duplex+flat At Ajah by tyor: 5:43pm On Apr 08, 2012
nice work @Segcy.moor.

Keep us updated. I'm inspired.
Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 7:54pm On Apr 10, 2012
DAY 15;we remove the plank and started filling work. meanwhile d column to hold d spiral stair is being established
@gtrust. yes is for standard plot with separate gate for tenant. their is provision for gate house and gen house but i am afraid BQ is not incusive but we can fix that without affecting d concept

Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 7:59pm On Apr 10, 2012
filling wk

Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 7:09pm On Apr 11, 2012
DAY 16; FILLING WOKK CONTINUE...

Re: Construction Process Of A Wing Duplex+flat At Ajah by gtrust: 7:54pm On Apr 11, 2012
I'm impressed!
Well done.
Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 5:24pm On Apr 12, 2012
DAY 17;

Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 5:26pm On Apr 12, 2012
Thanks for d compliment....filling wks continues

Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 6:03pm On Apr 13, 2012
DAY 18;Filling wks continues

Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 6:05pm On Apr 13, 2012
filling wks

Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 7:39pm On Apr 14, 2012
day19;Filling works continues

Re: Construction Process Of A Wing Duplex+flat At Ajah by ekoboy: 11:02pm On Apr 14, 2012
Well done. You appear very professional.
How much would it take to do a 4 bedroom bungalow and hw much time will take.
Re: Construction Process Of A Wing Duplex+flat At Ajah by lovetosin: 12:31am On Apr 16, 2012
@ segcy:good work you are doing,was the size of this duplex,L*W
Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 5:08pm On Apr 19, 2012
DAY 21-42--Surface treatment
L=27m,B=12m
...it depends on d nature of the foundation u decided to do based on Engineer's advise

Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 5:14pm On Apr 19, 2012
Ramming with machine.

Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 5:16pm On Apr 19, 2012
meanwh enough water before then

Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 5:19pm On Apr 19, 2012
with pumping machine

Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 4:16pm On Apr 22, 2012
For d last post; Immean 21-22.
DAY 23-25
We carry out Surface treatment.How? Having through with d filling. enough water is being pour to let d fiiling settle. Thereafter, d thick polythene nylon in being spread all over d floor(this is neccessary to prevent moisture into d building) and blinding on top of nylon. (this is neccessary because iron must not touch d nylon). And finally, we placed iron to receive concrete with d ratio 1;2;4

Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 4:17pm On Apr 22, 2012
reinformt

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (40) (Reply)

Cost Of Building A Four Bedroom Bungalow From Foundation. / WATCH THIS SPACE (Electrical Showcase & Review) / Man Builds House With 14,800 Plastic Bottles In Kaduna (pics)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 19
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.