PropertiesRe: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(op): 6:01am On Mar 08, 2015
more
PropertiesRe: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(op): 5:59am On Mar 08, 2015
more

PropertiesRe: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(op): 5:58am On Mar 08, 2015
more pics

PropertiesRe: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(op): 5:57am On Mar 08, 2015
mufutau55:
Good work.. I dey class oh! Learning as usual.

Hajji M.
welcome sir
PropertiesRe: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(op): 10:50pm On Mar 07, 2015
setting out procedures
1. establishement of the building line
2. the other corners of the building is set at right angle to the building line using builder's square to get the correct andgle and a meter rule to measure the horizontal distance. allowance is made to allow for sagging of the meter rule.
4. the four cotners of the building is set and pegged.
5. A nail is placed ontop of the four pegs and each ate connected to form a perfect rectangle or square as the case may be.
6. from these four corners, an ofset of 1.2m or 1.5m ( to allow for digging and carting away of excavated material) is allowed from these four corners pegs.
7. The four offsets pegs are nailed an line connected to them to form another perfect rectangle and square as the case may be.
8. across the new line pegs are spaced at 2m c/c fo form a continuous chain of peg to wish profile boards are nailed to form a profile.
9 The structural building plans is transferred carefully to the profile.
10. at each grid line on the drawing a corresponding 5 nails are placed on the profile as follows. the center nail represent the grid, the next two nail represent the width of block while the last two nail represent the width of the foundation
PropertiesRe: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(op): 10:37pm On Mar 07, 2015
more

PropertiesRe: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(op): 10:36pm On Mar 07, 2015
more pics

PropertiesRe: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(op): 10:33pm On Mar 07, 2015
setting out picture

PropertiesRe: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(op): 10:29pm On Mar 07, 2015
setting out:
material includes the following
1. pegs : 7 boundle @ N1000 = N7, 000
2. profile board = 120 2" x 2" @ N250 = N30, 000
3. line, builder's square, claw hammer, heavy hammer, meter rule = N20, 000
4. miscellaneous = N10, 000
total = N67, 000
PropertiesRe: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(op): 10:19pm On Mar 07, 2015
more picture

PropertiesRe: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(op): 10:11pm On Mar 07, 2015
emmadejust:
abdulwastecx Abeg position wella incase there is any running bush meat on d lose..... na weekends tinz oooo



na only be say I still dey fear ebola
PropertiesRe: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(op): 10:07pm On Mar 07, 2015
more pics

PropertiesRe: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(op): 9:53pm On Mar 07, 2015
pics

PropertiesRe: The Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(op): 9:41pm On Mar 07, 2015
site clearance
equipment = bulldozer
duration of work = 2 days
cost of clearance = 200k
PropertiesThe Construction Of 14 Class Room At Emuhoa Community Rivers State by abdulwastecx(op):
the construction of 14 block ube primary school at emuhoa community rviers state.

project duration = 3 months
starting date = 1st march 2015
PoliticsRe: South-West Zone Won’t Vote For Buhari - Sule Lamido by abdulwastecx(m): 5:38am On Mar 04, 2015
lamido os just confused and desperate to be in good term with thief jeg.

There is no such thing as muslim north and christiqn south. jonqthqn is from swampy bayelsa and doesn't represent all the good people of so called southern Nigeria state.

There is no such thing as Christian south and muslim north. yorubas are muslim as well as Christmas, yorubas don't vote based on religious sentiment.
Buharis is the people's choice
PropertiesRe: Cost Of laying a bungalow Foundation by abdulwastecx(m): 10:30pm On Mar 02, 2015
Mushood:
Check ur calculation, u will get me
ok I will check
PropertiesRe: The Lessons I Learnt While Building My House by abdulwastecx(m): 9:15pm On Mar 02, 2015
Icon4s:
Congtrats but bro. But abeg what kind of house did you build with 4million naira. Just curious.
people over spend alot by not planning properly while building a house.

The following information can help low cost house builders

1.Do your architectural design focusing more on functionality than aesthetic. e.g don't proposed unnecessary curve, too many corners, very high roof etc.

2. Try do a 3 D . the 3 D allows for modifications and changes to be made b4 actual construction.

3. Try to do the setting out to make sure thee house is straight ( since itt cost little in the longg round)

4. supervise the construction together with a professional if you have the time or give a professional to supervised the job

5. Always procure materials yourself and don't
be a victim of those so called building suppliers ( you can go with your site supervisor).

6. Get a good brick layers/mason for your job. give the block work out on a contract like N50/block, plastering out for N1200/partions.

build q simple roof type and give the job to a good carpentern
PropertiesRe: The Lessons I Learnt While Building My House by abdulwastecx(m): 8:52pm On Mar 02, 2015
[quote author=drkay post=31207632][/quote]congratulations sir, it is really valuable here to hear from house owners.
people always make that mistake of having a close friends suplying materials. The truth is suppliers are bad for the business they definitely inflate your price to make extra gain.

you could have spend less if you had access to these information earlier.

I like the part " trust your employee till you catched them red handed"
PropertiesRe: A Propossed Six Bedrooms Duplex Building In Port Harcourt by abdulwastecx(op): 8:39pm On Mar 02, 2015
Dieumerci:
@Abdulwastecx, I would like know whether this calculation is only for the casting of the 6" concrete.
it is a template for the calculation of materials required in the production of concrete using mix ratio of 1:2:4. you can always use it for other operation like column, beam, slab etc by changing parameters like the length, width and thickness
PropertiesRe: A Nairanlander Building Project by abdulwastecx(op): 5:41am On Mar 02, 2015
mufutau55:
@abdulwastecx:

I love your humble and professional responses both here and thru private email. It was nice chatting with you.
Please keep it up, and you will have no limit. Thank you.

Hajji M.
thank you sir
PropertiesRe: A Nairanlander Building Project by abdulwastecx(op): 6:47pm On Mar 01, 2015
more

PropertiesRe: A Nairanlander Building Project by abdulwastecx(op): 6:41pm On Mar 01, 2015
some pics

PropertiesRe: A Nairanlander Building Project by abdulwastecx(op): 6:12pm On Mar 01, 2015
emmadejust:
PORT HARCOURT & ENVIRONS.........


abdulwastecx....... am present @ site

let's give ph its own excellenct name in building and construction works on Nairaland....

bro...were you at the site.
I left the site around 2:45
PropertiesRe: Cost Of laying a bungalow Foundation by abdulwastecx(m): 6:10pm On Mar 01, 2015
felifeli:
I have emailed you. Kindly acknowledge receipt
It has been received sir...I will send a detailed provisional estimate tonight. thank you sir
PropertiesRe: Cost Of laying a bungalow Foundation by abdulwastecx(m): 4:24pm On Mar 01, 2015
felifeli:
Hello' please can you give me average estimate for building a bungalow on firm ground in Sango Otta . The outside dimensions are 20meters by 25 meters. Thank you. Please also tell me your phone number/email .
phone no : 08169492682
email : jwastecx@gmail.com

how many bedrooms are we talking about?
PropertiesRe: A Nairanlander Building Project by abdulwastecx(op): 3:29pm On Mar 01, 2015
description of setting out
Date : 01-03-2015

materials: two bundle of peg ( 24/bundle) @ N1000/peg = N2000
profile board ( 2x2"wink: 20 @ N250/nr = N5000
line and other miscellaneous = N3000
labour = N 2000

workmanship = N 10, 000
Total = N22, 000
PropertiesRe: Cost Of laying a bungalow Foundation by abdulwastecx(m): 3:13pm On Mar 01, 2015
Mushood:
Ur mistake is how can u multiply two diff unit together, I mean mm and m?
I always convert from mm to m when I want to do any calculation
remember 1m = 1000mm