@ All check out the house I said that was sold within 6 to 7m as at last year. then the last cost around 1.5m(though omonile and agent, survey,lawyer, family etc may cost extra 500k). They are two. Both were sold. Its a 3bedroom flat. its precisely the bungalow with red roof. I can't get too you, hope you understand why Peace!
|
@ Pettitegal In Ikorodu o, with 10million naira, you can/will get yourself a very very decent 4bedroom home. Depending on what is available during your search though. I will say, you should just budget that 7m. And keep the rest as your miscellaneous expenses! Peace |
Pettitegal:Hmmm, you know what? I will post you a 3bedroom bungalow sold around thie area I am currently building about a year ago within 6 to 7m so you can see. To be honest with you, you will hardly get a 'decent' 4bedroom bungalow for 7m. Let me give you a break down. @worst. say the land goes for 2m(maybe the land goes for 1.5m, agent 5%,lawyer 5%,omonile 50k,family 50k,survery plan 80k - 480k) Please note this is at worst sha! Some omonile, collect up to 10% of the total money you buy the land. And some can collect 25k. All depends on the cost and location of the land though. So say 2m land cost. Then Fence, Gate, Aluminum roof or asbestos roof, the finishing and all that say 4million(which is near impossible) then say the owner gains 500k to 1million. You see it will be very difficult to get a decent 4bedroom home for 7m. Now to encourage you, it is also very possible. But on the below conditions. *** The cost of land at that area will be very cheap(which means less people will be living around that area and such place are always at risks of arm robbers. GOD FORBID FOR US SHA!!!) *** The building may be uncompleted(you can get this one at a place that is very okay. And you are most likely to have lots of neighbors, and you can get for 3 to 4m, uncompleted building, then 3m to infinity am sure will finish the house, depending on what you want). But above all, you can get one for 7million And I'm sure it will be very okay!!! ![]() |
You got 2be there 2know!Everybody wanna See!!! ![]() |
114 Herin Balogun Street, Universal Estate, Orita-merin, after Mosque Bus-stop, before you get to the white house, Just after you've passed our marine road Oluodo Ibelefun, Ikorodu. (Don't Get Drunk, Don't look Back - You don't Wanna Drive Too Fast!) COME!!!! VISIT!!!! |
omobashua1 very nice |
Till tomorrow peace!!! |
I am building around Oluodo, Igbelefun, Ikorodu I'm ready to remove it now! peace |
okay, sign in your yahoo messenger so I can buzz u immediately or call me on this number soonest! Hope you have a relation around here sha just ring me on the number to confirm you've got it. I will confirm it now or just say you got it. I will remove it soonest! |
bimsbims:Okay!!! No wahala! Have you seen any pictures? |
Okay!!! You know say soup wey sweet, na money kill am sha? ![]() Please don't let all this agents deceive you. They are very good with words have noticed. You will end up building without getting anyone to let it soonest! Anyhow sha! All you choice. check ur email sha to get mine! |
Am Alone:My reply |
spyder880:I have assessed the gate myself and the quality is very much okay! I don't think I can actually get it much lesser than 98k. And I think the price is so for some reasons. Maybe it is my area or so but you can hardly see/get a quality gate for less than 110k. Some even sells for 140 I have not paid yet and I will do some more research before doing so. Also, I told the man that I can pay 90k but that was when he remove 2k from the 100k(initial price 130k) we had being calling. This is far the best price I can get it around here. And the sheet you called 20k sells for 18k here o! peace |
Okay brothers I went to a showroom around Ojodu-Berger And I saw some beautiful doors there as well I visited about 3 places around there check out their prices 4ft door Place one --- 120k(didn't negotiate, and they were asking me how much I was willing to pay!) place two --- 130k(same with the first one. I got this price, after my negotiation). place three-- 135k(same doors, after negotiation) 3ft door Place one --- 80k place two --- 70k place three-- 80k The above are all turkey doors with a 9" frame. One china door there with a turkey skin finish, 3ft with a 6" going for 25k(didn't negotiate much sha) The aluminum guy visited me at the site today with his formal quotation and told me the 4 by 4 ft door will be going for nothing less than 24k and the 4 by 5ft door 28k 2 by 2 remains 10k Net total sha is now 326,000.00 I plan to giv him an advance payment next tomorrow sha. The work will be ready in 2 weeks my choice of color is white with a tinted glass Peace! |
I really feel like building a customized gate for my house. One thing have noticed now is that, customized once can be very unique, but they are also very expensive!!!! I have being looking for gate to buy lately and I saw one very cheap for 98k. When I try to go and customized that same gate, I was told 130k jale jale!!!! ![]() Except you want just 'anyhow' gate! Also, I don't really have much time. I am really in haste to have my gate done once and for all but the situation on ground won't permit this. I want to customize my gate but the problem is that; I don't have enough time to do so, it is most likely to cost me atleast 40k more, it may take too much time and the risk may be kind of to much! Then on the other hand, the uncustomary one will only cost me 98k I think it will be wise for me to go for this one ![]() I plan to buy the gate tomorrow ![]() Fhemmy - The man who love pictures I wil post the picture of the gate for you tomorrow for your eyes only!!! Peace!!!! |
Fhemmmy:You don make me laff o! I don't really feel like but no wahala, I will post some pictures tomorrow!!! Guess that is okay na abi? |
Updated expenses!!!! Today I paid a guy 500 naira to help me move some sand around the compound so that the rain that will be falling can directed off the fence and off the foundation of my house. Also, I bought a tipper of filling sand 8,000(have not paid for it, so I'm planing to pay 7k5 for it) the previouse once's I bought to fill my house went for 8,500 and 1,700 was used to fill it. but the guy that will be filling this one is doing it for 1,500. Also, I want to chain my fence round. The capenter charged me 15k for the job. The chaining carries a design(two steps). ANd also, he will finish do the pillar of the gate from that money! Also, I just confirmed the price for carpenter around here and it is 3000 per days job. The welder also, will be collecting 8k for the iron work and the iron work for the gate. Total: 33,000 Quotation for the irons: ring 6" by 6" =#450 per dozen x 10 dozens = #4,500(I may end up buying this ring less sha) 12m rod = #1380 x 40 lenghth= #55,200.00 16mm rod = 2250 x 3 = #6750 binding wire = #2,500 Total: #101950 Net total: 6,978,320.00 I will go and buy all these tomorrow(i mean the rods) any additional expenses, I will let us know. Peace |
Fhemmmy:I want to believe you have seen fence, and lots of fence right ![]() Nothing very new for now sha. And I don't feel like posting pictures. I will try to do that next week sha Peace! |
@bimsbims Well, I don't really know your budget so cannot advice much on this. First do you live in/around Ikorodu? My advice is that, that place is kind of far, and I heard the fourth milan bridge will be linked to that place(may not exactly ijede road sha!!!) secondly, if I am correct, that place is kind of far from Ikorodu garage right? and again, the development around that place is kind very low!!!! You can buy the land, fence round and keep it. But to go into construction now and expect someone to lease it soonest is not very wise, because the chances of having someone to lease/rent soon is very low. You may end up building and keeping it for 3 years before you get someone o!(anyone correct me if am wrong!) Now if I want to advice, I can advice you to buy off Owutu-Ishawo road. Someone told me today that they have a land there and the price is 1.6m okay, that is kind of high. But you know Owutu is far closer to garage than ijede. So the choice is yours! And I believe you can easily have someone to lease it around Owutu-Ishawo, at a better price than Ijede. There are still several places you can get a land around Ikorodu. Less than 1.6m. Just make sure the land is genuine above all!!!! Also, what I can assure you of is that it will be very hard for you to see someone to let your house at ijede soonest. Because it is most likely for the site to be or look more like a bush. Where I bought my land, I got it for 1.5m, and i can say it will still be a bit difficult to have someone rent a house around that area for now(thought there are lots of people living in the area. But 98% are private homes)!!! Peace |
Akpuoru:Well, there is lurv in sharing!!! check ur mail sha Peace |
atasteve:astasteve, please do not be offended. It escaped my mind oo! I will advice that you wait for me to buy the doors at the end of this month first. Though it may be before. Because like I said earlier, I will be buying it from 2 to 3 different places. This will kind of cost me more cast in term of transportation, but I think I can handle it. The first place, I will be buying all the rooms doors, the second place I will be buying the kitchen, store, and lobby door and the last place, I will be buying the entrance door from. Also, I have a new company I got in contact with and their price is really attractive :O I plant to visit there tomorrow. I will give you some updates sha. expecially if the doors they are selling are very okay for the prices Peace! |
I want to say I have gotten my final quotation for my aluminum window(tower aluminum) And net total is 321,00p(with net) All casement 4 by 4 = 23,500 x 10 = 235,000 4 by 5 = 28,000 x 2 = 56,000 2 by 2 = 10,000 x 3 = 30,000 total: 321,000.00 Note the best quotation I got for this aluminum window was around 456,000 or so. They try to inflate the price by saying "cost of transportation" and "installation charges" What I noticed from this guy's quotation is that he didn't apply all the above mentioned charges so guys, beware!!!! |
Yes, only that I did not allow him to use too much labour. But kosi wahala sha Peace!!! |
spyder880:Completed ke? No mind those bricklayers jorray!!! but by tomorrow sha or next 3 days it will be completed |
@ Spyder This your house don dey give life go sha oshey!!!! peace |
[quote author=prince_onx link=topic=606079.msg8287017#msg8287017 date=1304962532]Welcome back "Am-Alone" hope that was a welcome speech cux you sound like person wey still dey vex @Spyder880: what size of rods did you finally use for the decking? they kind of look too tiny abi na the picture?[/quote]I no vex o!! Peace @ Spyder, You no come give us update of the total cash spent? Peace2u2 |
**I don't know how you may see it but what I know for sure is that, Don't show us/me our/my mistake(s) without rendering a solution. **And I want to say; No knowledge is a waste. One thing I try to do in this thread is to share the/my ups and downs of my building experience. I have seen a building that has being built to decking level, and because of poor engineering, the whole pillars(27) was taken down and re-built. All this began when I came here to share the downs of my building/roofing experience. I am not here to gain any attention(I want people to know the truth of everything. See it as it is. To me, every single information matters), I am not advertising anything, I am not a builder nor an engineer, I am not selling anything as well. I am just doing this for the fun and so as to share some experience with others and get some good advice if possible. That is why I try to stay honest like tattoo! NOBODY and I repeat eN-O-BODY can ruin moi down! If what I am doing can't serve the purpose that I am doing it for I think it did be best I change my parole!!!! Less I forgot. . . . "I AM A LEADER HOMEBOY 'COS I NEVER FOLLOW ----- OLUWA CHAMPION" |
KnowAll:lol |
@ Lawyer, I must confess that lawyer is very much correct with the logic mentioned above Could you believe that for the past 2 years I've only drove once to Lekki?? of course because of the road system, Lekki/Ajah/Epe are/is the head-quarter of traffic here in Lagos. One time I spent 5hrs on a private car!! I think our government should first solve the Power/good Road/good schools/good hospitals Palava then others can/should follow. I'm not saying this is a bad idea, I just think there are more pressing needs!!! Peace! |
sshalom:Sorry boss! Check your inbox now or your spam folder Peace!!! |
payless:No wahala sha peace!!!! |
@prince I typed so much word with grief anger and lots of agitation I jus ctrl a the whole rubbish and tap the delete button I will say again ppl wey dey criticize me over something are also Guilty of it because they too are praticing it. Hypocrisy But unlike them, even from my criticisms ppl dey learm but their Is just so baseless, seeking vain attention. '3 ppl t' - jus like u to lead us small too And those wey done stone moi, lead us toosince I can't do it so well Make moi just take a smaill break And as the arabian saying; I fold my tent and silently fade away, |